Indian Tenders

Tender Notice

TDR 54698671
Tendering Authority Public Works Department
Tender No 1143/M/1MT/E-TENDER/UC/2026 DT 11.03.2026
Tender ID 2026_CEUCZ_1124862_1
Tender Brief Tender For Construction Of Hafijuddinpur To Ramkot Link Road.
City Hardoi
State Uttar Pradesh
Document Fees INR 2715 /-
EMD INR 835000.0 /-
Tender Value INR 1.27 Crore /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Construction Of Hafijuddinpur To Ramkot Link Road.

Key Dates

Publish Date 17-03-2026
Last Date of Bid Submission 24-03-2026
Tender Opening Date 24-03-2026

Contact Information

Company Name Public Works Department
Contact Person SUPERINTENDING ENGINEER
Address OFFICE OF SE UNNAO CIRCLE PWD UNNAO

BOQ Items

Name of Work:- Construction of Hafijuddinpur to Ramkot Link Road.
Sl. No. Item Description
1Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (SOR-253) (Rates are Including Labour Cess but Excluding GST)
2Excavation in soil using hydraulic excavator and tipper with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tipper, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-section and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3. (Rates are Including Labour Cess but Excluding GST)
3Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. (Rates are Including Labour Cess but Excluding GST)
4Providing, laying, spreading and compacting stone aggregates of 63-45 mm specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Rates are Including Labour Cess but Excluding GST)
5Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Rates are Including Labour Cess but Excluding GST)
6Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits availble land with all lifts and leads, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specitaion Clause 303.1 (Rates are Including Labour Cess but Excluding GST)
7Brick edging on both side of the road of 1st Class brick 8 cm. (3\\") wide and 12 cm. (41/2\\") deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing & ramming the excavated earth including all labour, T&P sudries required for proper completion of work with material. (Rates are Including Labour Cess but Excluding GST)
8Providing and applying primer coat with EMULSION on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 (Rates are Including Labour Cess but Excluding GST)
9Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Rates are Including Labour Cess but Excluding GST)
10Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. (Rates are Including Labour Cess but Excluding GST)
11Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 (Rates are Including Labour Cess but Excluding GST)
12Providing and laying in cement concrete 1:4:8 (1 cement : 4 Coarse sand : 8 graded Stone ballast 40 mm. nominal size) including supply of all materials, labour and T&P etc. required for proper complete of the work and curing complete also including cost of from work in foundation and floors. SI no. 281 (Rates are Including Labour Cess but Excluding GST)
13Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Rates are Including Labour Cess but Excluding GST)
14Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (3 No. x 2.50 Mt = 7.50 Mt) (600 mm dia RCC NP-3 hume pipe) (Rates are Including Labour Cess but Excluding GST)
15Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (3 No. x 2.50 Mt = 7.50 Mt) (1000 mm dia RCC NP-3 hume pipe) (Rates are Including Labour Cess but Excluding GST)
16Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600,603,604, 1202 & 1204 (Rates are Including Labour Cess but Excluding GST)
17Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 (Rates are Including Labour Cess but Excluding GST)
18Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 1 st Year & 2nd Year after the Actual Date of Completion Maintenance @ 0.75 %
19Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST for 3rd Year after the Actual Date of Completion Maintenance @ 1.50 %
20Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST for 4th Year after the Actual Date of Completion Maintenance @ 2.25 %
21Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST for 5th Year after the Actual Date of Completion Maintenance @ 3.00 % Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download bfe414a3-c6a1-476c-bc43-8c0dd5065cef.html Tender Documents 0 KB
Download BOQ_2096399.xls Tender Documents 0 KB
Download T2ETENDER.pdf Tender Documents 0 KB
Download Tendernotice_1 (7).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.