|
| 1 | Brick work in super structure using in CM 1:6 |
| 2 | 20 mm thick plaster on new work including curing and racking of joints in CM 1:6 |
| 3 | P & A white cement based putty over plastered surface to prepare the surface even and smooth complete |
| 4 | Colour Washing with lime |
| 5 | Earth work in filling of loose soil lead of 50m and lift up to 1.5m |
| 6 | Carrige of Sand including loading and unloading from quary with lead of 1 km |
| 7 | S & F iron gate and grill |
| 8 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. |
| 9 | Cement concrete in foundation and plinth with stone ballast size 40mm in 1:4:8 mix. |
| 10 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6. |
| 11 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3-graded stone aggregate 20 mm nominal size ) In foundation. |
| 12 | Brick work in super structure using bricks of class designation-75 in CM 1:6 |
| 13 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3-graded stone aggregate 20 mm nominal size ) In foundation. |
| 14 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding(including cost of binding wire) in foundation and super structure upto 4.5m height above plinth level hot rolled deformed (IS:1139) cold twisted(IS:1786) bars. |
| 15 | Centering and shuttering with steel sheets including strutting,propping, bracing both ways with wooden members and removal of from work. |
| 16 | S & F iron gate weight as per actual. |
| 17 | Enamel painting on gate. |
| 18 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6. |
| 19 | Providing and applying white cement based putty over plasterd surface to prepare the surface even and smooth complete (PWD BSR-2022 Less-10%). |
| 20 | Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding. New Work (Two or more coat including base coat of water proofing cement paint )- (PWD BSR - 2022 Less - 10%). |
| 21 | Yojna Board Please Enable Macros to View BoQ information |