|
Tender for Scarifying The Existing Bituminous Surface To A Depth Of 20 Mm And Disposal Of Scarified Material Within All Lifts And Leads Upto 1000 Metres. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Excavation For Roadwork In Soil With Hydraulic Excavator Including Cutting And Loading In Tippers, Trimming Bottom And Side Slopes, In Accordance With Requirements Of Lines, Grades And Cross Sections, And Transporting To The Embankment Location Within All Lifts And Lead Upto 1000M (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Construction Of Embankment With Material Deposited From Roadway Cutting:- Construction Of Embankment With Approved Materials Deposited At Site From Roadway Cutting And Excavation From Drain And Foundation Of Other Structures Graded And Compacted To Meet Requirement Of Table 300-2. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Construction Of Embankment With Material Obtained Fromborrow Pit:-Construction Of Embankment With Approved Material Obtained Fromborrow Pit With All Lifts And Leads, Transporting To Site, Spreading, Grading To Required Slope And Compacting To Meet Requirement Of Table 300-2. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Construction Of Granular Sub-Base By Providing Close Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Front End Loader At Omc, And Compacting With Vibratory Roller To Achieve The Desired Density, Complete As Per Clause 401 (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Providing, Laying, Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material With Water At Omc In Mechanical Mix Plant Carriage Of Mixed Material By Tipper To Site, Laying In Uniform Layers With Grader In Sub- Base / Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Providing And Applying Primer Coat With Ss1 Grade Bitumen Emulsion On Prepared Surface Of Granular Base Including Clearing Of Road Surface And Spraying Primer At The Rate Of 0.70 Kg/Sqm Using Mechanical Means. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Providing And Laying Dense Graded Bituminous Macadam With Higher Capacity Batch Type Hmp Using Crushed Aggregates Of Specified Grading, Premixed With Bituminous Binder (Vg-30) @ 4.5 Per Cent By Weight Of Total Mix And Filler, Transporting The Hot Mix To Work Site, Laying With A Hydrostatic Paver Finisher With Sensor Control To The Required Grade, Level And Alignment, Rolling With Smooth Wheeled, Vibratory And Tandem Rollers To Achieve The Desired Compaction As Per Morth Specification Clause No. 505 Complete In All Respects. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Providing And Applying Tack Coat With Bitumen Emulsion Using Emulsion Pressure Distributor At The Rate Of 0.20 Kg Per Sqm On The Prepared Bituminous Surface Cleaned With Mechanical Broom. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Providing And Laying Bituminous Concrete With Higher Capacity Batch Type Hot Mix Plant Using Crushed Aggregates Of Specified Grading, Premixed With Bituminous Binder(Vg-30) @ 5.4 Per Cent Of Mix And Filler, Transporting The Hot Mix To Work Site, Laying With A Hydrostatic Paver Finisher With Sensor Control To The Required Grade, Level And Alignment, Rolling With Smooth Wheeled, Vibratory And Tandem Rollers To Achieve The Desired Compaction As Per Morth Specification Clause No. 507 Complete In All Respects. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Construction Of Sub-Grade And Earthen Shoulders With Approved Material Obtained From Borow Pit With All Lifts & Leads, Transporting To Site, Spreading, Grading To Required Slope And Compacted To Meet Requirement Of Table No. 300-2 (Lead Upto 1.00 Km.) (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Reinforced Cement Concrete M-15 Grade Kilometer Stone Of Standard Design As Per Irc:8-1980, Fixing In Position Including Including Painting And Printing Etc. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Reinforced Cement Concrete M-15 Grade Hectometer Stone (Precast) Of Standard Design As Per Irc:8-1980, Fixing In Position Including Including Painting And Printing Etc. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Plain Cement Concrete 1:4:8 Nominal Mix In Foundation With Crushed Stone Aggregate 40 Mm Nominal Size Mechanically Mixed, Placed In Foundation And Compacted By Vibration Including Curing For 14 Days Foundation.(Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , 1St Class Brick Work With M-15 Brick With Cement & Fine Sand Of 1.25Fm. In 1:4 S.I.No 305B. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Struck Cement Pointing With Cement Mortar 1:2 S.I. No 574(Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Reinforced Cement Concrete Hume Pipe Np-3 (350Mm) Including Collars/Spigot Jointed With Stiff Mixture Of Cement In The Proportion Of 1:2 (1 Cement : 2 Fine Sand) Including Testing Of Joints. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Reinforced Cement Concrete Hume Pipe Np-3 (600Mm) Including Collars/Spigot Jointed With Stiff Mixture Of Cement In The Proportion Of 1:2 (1 Cement : 2 Fine Sand) Including Testing Of Joints. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Reinforced Cement Concrete Hume Pipe Np-3 (900Mm) Including Collars/Spigot Jointed With Stiff Mixture Of Cement In The Proportion Of 1:2 (1 Cement : 2 Fine Sand) Including Testing Of Joints. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Providing And Laying Of Filter Media With Granular Materials/Stone Crushed Aggregates Satisfying The Requirements Laid Down In Clause 2504.2.2. Of Morth Specifications To A Thickness Of Not Less Than 600 Mm With Smaller Size Towards The Soil And Bigger Size Towards The Wall And Provided Over The Entire Surface Behind Abutment, Wing Wall And Return Wall To The Full Height Compacted To A Firm Condition Complete As Per Drawing And Technical Specification. As Per Morth Sr.No. 13.10 And 710.1.4.Of Irc:78 And 2200 (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Plain Cement Concrete 1:3:6 With Crushed Stone Nominal Mix In Foundation Aggregate 40Mm Nominal Size Mechanically Mixed, Placed In Foundation And Compacted By Vibration Including Curring For 14 Days.(Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Reinforced Cement Concrete Grade M-30 Using Batching Plant Transit Mixer & Manual Placing As Per Morth Si. No. 12.9 Case-Ii And Specification No.1500, 1700, 2100 (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Supplying, Fitting And Placing Hysd Reinforcement Complete In Sub-Structure Drawing As Per And Technical Specification As Per Morth Sr.No. 12.40 And Specification No. 1600 (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Plain Cement Concrete In Open Foundation Complete And As Per Drawing Technical Specifications. (M-15) As Per Morth Sr.No. 12.8 And Specification No. 1500, 1700 & 1800 (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Providing And Laying Pitching On Slopes Laid Over Prepared Filter Media Including Boulder Apron Laid Dry In Front Of Toe Of Embankment Complete As Per Drawing And Technical Specifications. (Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Providing Weep Holes In Brick Masonry /Plain /Reinforced Concrete Abutment, Wing Wall/ Return Wall With 100Mm Dia Ac Pipe Extending Through The Full Width Of The Structure With Slope Of 1V:20H Towards Drawing Foce. Complete As Per Drawing And Technical Specificationsl No. 2706 & 2200 .(Including Cost Of All Material T&P, Royalty, Taxes, Labour Cess Etc But Excluding Gst) , Part-B Maintenance Cost Will Be Paid Year Wise As Per Government Order No 17/2024/Sa-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 And Hq Uppwd,Lucknow Order No.3689 Coprmc/Mul-23-24 Date 17-02-2024 Maintenance Cost Will Adjusted As Per Final Cost Of Construction And Will Be Paid Accordingly. , The Routine Maintenance Of Above Road Work Including Pavement, Road Sides And Cross Drains, Surface Drains To The Required Standards And In The Manner As Defined In Cb Condition And Keep The Entire Road Surface And Structure In Defect Free Condition During The Entire Maintenance Period Which Begins From The Completion Date And Ends After Five Years. For 1St Year Maintenance Charge @ 0% Of Sub Toal Of Part-A Work Done (Including Cost Of All Matarial T&P, Taxes, Labour Cess Etc But Excluding Gst ) , The Routine Maintenance Of Above Road Work Including Pavement, Road Sides And Cross Drains, Surface Drains To The Required Standards And In The Manner As Defined In Cb Condition And Keep The Entire Road Surface And Structure In Defect Free Condition During The Entire Maintenance Period Which Begins From The Completion Date And Ends After Five Years. For 2Nd Year Maintenance Charge @ 0.25% (Including Cost Of All Matarial T&P, Taxes, Labour Cess Etc But Excluding Gst ) , The Routine Maintenance Of Above Road Work Including Pavement, Road Sides And Cross Drains, Surface Drains To The Required Standards And In The Manner As Defined In Cb Condition And Keep The Entire Road Surface And Structure In Defect Free Condition During The Entire Maintenance Period Which Begins From The Completion Date And Ends After Five Years. For 3Rd Year Maintenance Charge @ 0.50% (Including Cost Of All Matarial T&P, Taxes, Labour Cess Etc But Excluding Gst ) , The Routine Maintenance Of Above Road Work Including Pavement, Road Sides And Cross Drains, Surface Drains To The Required Standards And In The Manner As Defined In Cb Condition And Keep The Entire Road Surface And Structure In Defect Free Condition During The Entire Maintenance Period Which Begins From The Completion Date And Ends After Five Years. For 4Th Year Maintenance Charge @ 0.75% (Including Cost Of All Matarial T&P, Taxes, Labour Cess Etc But Excluding Gst ) , The Routine Maintenance Of Above Road Work Including Pavement, Road Sides And Cross Drains, Surface Drains To The Required Standards And In The Manner As Defined In Cb Condition And Keep The Entire Road Surface And Structure In Defect Free Condition During The Entire Maintenance Period Which Begins From The Completion Date And Ends After Five Years. For 5Th Year Maintenance Charge @ 1.00% (Including Cost Of All Matarial T&P, Taxes, Labour Cess Etc But Excluding Gst )
|