Name of Work:- UP-GRADATION AND STRENGTHENING OF INFRASTRUCTURE (SEWERAGE) INTERNAL AND EXTERNAL STORM WATER DRAINAGE, CONSTRUCTION OF ROADS, ELECTRIFICATION AND 15 MLD CETP INDUSTRIAL SECTOR-21and26, BHIWANI. `Making connection of HDPE pipe by providing and laying of 710mm dia and 500mm dia rising main HDPE pipe PN-6 from disposal works to existing HDPE Pipe of storm water and sewerage near STP of Nagar Nigam through railwaytrack (LC No. 88) toward Tosham road and construction of Truss Bridge on Balasmand Distributory in Industrial Sector-27and28, Hisar and all other works contingent thereto` (Including Three years maintenance and defect liability period free of cost) | Sl. No. | Item Description | |
| 1 | [13.27]Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | | 2 | [15.1.2.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 2.1. Mechanical Means Depth up to 3 m | | 3 | [15.1.2.2]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 2.2. Mechanical Means Depth 3 m to 6 m | | 4 | [15.42]Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV) MORTandH clause 1100 (a)Initial and routine load test | | 5 | [15.42]Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV) MORTandH clause 1100 (b)Lateral load test | | 6 | [20.15.3]Providing and fixing C.I. Kinetic air valves conforming to and marked with IS: 14845 including carriage, loading, unloading stacking, handling, re-handling etc., drilling, tapping, screwing in valves connections complete in all respects to the satisfaction of Engineer-in- Charge. 3. 150 mm i/d | | 7 | [20.15.4]Providing and fixing C.I. Kinetic air valves conforming to and marked with IS: 14845 including carriage, loading, unloading stacking, handling, re-handling etc., drilling, tapping, screwing in valves connections complete in all respects to the satisfaction of Engineer-in- Charge. 4. 200 mm i/d | | 8 | [21.97.12]`Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-100 grade and PN-6 for sewer. application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer.Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment.` 12. 710 mm Outside Dia | | 9 | [21.97.9]`Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-100 grade and PN-6 for sewer. application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer.Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment.` 9. 500 mm Outside Dia | | 10 | [21.97.9]`Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-100 grade and PN-6 for sewer. application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer.Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment.` 9. 500 mm Outside Dia | | 11 | [5.53.1]Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge 1. up to 600 mm dia | | 12 | [6.1.8]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 8. 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) | | 13 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level | | 14 | [6.26.2]Extra for providing richer mixes up to plinth and at all floor levels. 2. Providing M-35 grade concrete instead of M-25 grade BMC/ RMC. (Note : Cement content considered in M-35 is @ 350 kg/ cum) | | 15 | [6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. | | 16 | Bored cast-in-situ M35 grade R.C.C. Pile using Hydraulic Rig excluding reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead up to 1000 m.Pile diameter- 300 mm Please Enable Macros to View BoQ information |
|