Tender Notice |
|
| TDR | 54148283 |
| Tendering Authority | Water Resources Department |
| Tender No | BDD/BDC/2025-26/22 |
| Tender ID | 2026_WR_161371_1 |
| Tender Brief | Corrigendum : Tender For Excavation By Mechanical Means(Jcb Or Hydraulic Excavator) In Trenches For Pipe Lines With Straight Or Open Cutting In Streets Or Open Area Including Trimming And Dressing Sides Levelling Of Beds Of Trenches To Correct Grade, Cutting Joint |
| City | jalandhar |
| State | Punjab |
| Document Fees | INR 1000 /- |
| EMD | INR 200000.0 /- |
| Tender Value | INR 1 Crore /- |
| Tender Type | Tender |
| Bidding Type | Open Tender |
| Competition Type | Indian |
Tender Details |
|
Tender for Excavation By Mechanical Means(Jcb Or Hydraulic Excavator) In Trenches For Pipe Lines With Straight Or Open Cutting In Streets Or Open Area Including Trimming And Dressing Sides Levelling Of Beds Of Trenches To Correct Grade, Cutting Joint Holes, Refilling Consolidation,Watering , Including The Cost Of Dewatering Of Rain Water, Diversion For Traffic, Night Signals. Providing & Fixing Caution Boards, Crossing Over Trenches For Access To The Houses, Watching, Fencing, Etc. And Removal Of Surplus Soil Out Side/Inside The Town Involving Lead Upto 15 Meter Complete In All Respect. Upto 1.5Mtr Depth , Excavation By Mechanical Means(Jcb Or Hydraulic Excavator) In Trenches For Pipe Lines With Straight Or Open Cutting In Streets Or Open Area Including Trimming And Dressing Sides Levelling Of Beds Of Trenches To Correct Grade, Cutting Joint Holes, Refilling Consolidation,Watering , Including The Cost Of Dewatering Of Rain Water, Diversion For Traffic, Night Signals. Providing & Fixing Caution Boards, Crossing Over Trenches For Access To The Houses, Watching, Fencing, Etc. And Removal Of Surplus Soil Out Side/Inside The Town Involving Lead Upto 15 Meter Complete In All Respect. From 1.5 To 2.25 Mtr Depth , Earth Work In Excavation In Foundations Trenches Etc. In All Kinds Of Soil Where Pick-Jumper Work Is Not Involved And Not Exceeding 2.0 Metres Depth Including Dressing Of Bottom And Sides Of Trenches, Stacking The Excavated Soil Clear From The Edge Of Excavation And Subsequent Filling Around Masonry In 15 Cm, Layers With Compaction Including Disposal Of All Surplus Soil As Directed Within Lead Of 30 Metres. , First Class Burnt Brick Work Laid In Cement Sand Mortar 1:6 In Foundation And Plinth , 10 Mm Thick Cement Plaster With Cement Mortar 1:4 On Bed & Top Of Side Walls , 10 Mm Thick Cement Plaster With Cement Mortar 1:4 On Side Walls , Reinforced Cement Concrete 1:2:4 Hand Mixed But Including Steel Reinforcement , Cement Conc.1:2:4 Including Supply, Carriage & Wi |
Corrigendum Details
| Sr No | CorrigendumDate | Corrigendum | CorrigendumType | NewSubmissionDate |
| 1 | 28-04-2026 | Corrigendum 31 | Date | 04-05-2026 |
| 2 | 27-04-2026 | Corrigendum 30 | Date | 28-04-2026 |
| 3 | 22-04-2026 | Corrigendum 29 | Date | 27-04-2026 |
| 4 | 22-04-2026 | Corrigendum 29 | Date | 27-04-2026 |
| 5 | 16-04-2026 | Corrigendum 27 | Date | 22-04-2026 |
| 6 | 13-04-2026 | Corrigendum 26 | Date | 16-04-2026 |
| 7 | 13-04-2026 | Corrigendum 26 | Date | 16-04-2026 |
| 8 | 09-04-2026 | Corrigendum 25 | Date | 13-04-2026 |
| 9 | 09-04-2026 | Corrigendum 25 | Date | 13-04-2026 |
| 10 | 06-04-2026 | Corrigendum 24 | Date | 09-04-2026 |
| 11 | 06-04-2026 | Corrigendum 24 | Date | 09-04-2026 |
| 12 | 01-04-2026 | Corrigendum 23 | Date | 06-04-2026 |
| 13 | 01-04-2026 | Corrigendum 23 | Date | 06-04-2026 |
| 14 | 30-03-2026 | Corrigendum 22 | Date | 01-04-2026 |
| 15 | 30-03-2026 | Corrigendum 22 | Date | 01-04-2026 |
| 16 | 30-03-2026 | Corrigendum 22 | Date | 01-04-2026 |
| 17 | 27-03-2026 | Corrigendum 21 | Date | 30-03-2026 |
| 18 | 27-03-2026 | Corrigendum 21 | Date | 30-03-2026 |
| 19 | 24-03-2026 | Corrigendum 16 | Date | 27-03-2026 |
| 20 | 24-03-2026 | Corrigendum 16 | Date | 27-03-2026 |
| 21 | 24-03-2026 | Corrigendum 16 | Date | 27-03-2026 |
| 22 | 20-03-2026 | Corrigendum 15 | Date | 24-03-2026 |
| 23 | 20-03-2026 | Corrigendum 15 | Date | 24-03-2026 |
| 24 | 20-03-2026 | Corrigendum 15 | Date | 24-03-2026 |
| 25 | 18-03-2026 | Corrigendum 14 | Date | 20-03-2026 |
| 26 | 18-03-2026 | Corrigendum 14 | Date | 20-03-2026 |
| 27 | 18-03-2026 | Corrigendum 14 | Date | 20-03-2026 |
| 28 | 12-03-2026 | Corrigendum 10 | Date | 18-03-2026 |
| 29 | 11-03-2026 | Corrigendum 9 | Date | 12-03-2026 |
| 30 | 06-03-2026 | Corrigendum 4 | Date | 09-03-2026 |
| 31 | 05-03-2026 | Corrigendum 3 | Date | 06-03-2026 |
| 32 | 05-03-2026 | Corrigendum 3 | Date | 06-03-2026 |
| 33 | 03-03-2026 | Corrigendum 2 | Date | 05-03-2026 |
| 34 | 03-03-2026 | Corrigendum 2 | Date | 05-03-2026 |
| 35 | 03-03-2026 | Corrigendum 2 | Date | 05-03-2026 |
| 36 | 02-03-2026 | Corrigendum 1 | Date | 03-03-2026 |
| 37 | 02-03-2026 | Corrigendum 1 | Date | 03-03-2026 |
| 38 | 02-03-2026 | Corrigendum 1 | Date | 03-03-2026 |
Key Dates |
|
| Publish Date | 28-04-2026 |
| Last Date of Bid Submission | 04-05-2026 |
| Tender Opening Date | 04-05-2026 |
Contact Information |
|
| Company Name | Water Resources Department |
| Contact Person | Executive Engineer, Bist Doab Canal GW Div JAL |
| Address | Executive Engineer, Bist Doab Canal GW Div JAL |
Other Detail |
|
| Information Source | https://eproc.punjab.gov.in |