| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 fine aggregate : 10 graded stone aggregate 40mm nominal size) |
| 3 | Centering shuttering including strutting ropping etc. and removal of form work for : Retaining walls , return walls, walls (any thickness) including attached pilasters, buttresses plinth and string courses fillets etc. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2fine aggregate : 4 graded stone aggregate 20mm nominal size) |
| 5 | 12mm cement plaster of mix :Cement mortar 1:4 (1 cement : 4 fine aggregate) |
| 6 | Supplying and filling in plinth with sand under floors including, watering, ramming consolidating and dressing complete. |
| 7 | Making and filling expansion joints with bitumen filler (bitumen 40 percent, asbestos 5 percent and fine aggregate 55%) 12mm wide. |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 fine aggregate : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc .complete - 40mm thick with 20mm nominal size stone aggregate |
| 9 | Providing , hoisting and fixing above plinth level upto floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement , with 1:1.5:3 (1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20mm nominal size) |
| 10 | Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars Fe - 500D or more |
| 11 | Engagingfor front end loader as directed by the Engineer - in Charge |