|
Tender for Dismantling Old Plaster Or Skirting Raking Out Joints And Cleaning The Surface For Plaster Including Disposal Of Rubbish To The Dumping Ground Within 50 Metres Lead. , Demolishing Brick Work Manually/ By Mechanical Means Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Metres Lead As Per Direction Of Engineer-In-Charge. In Cement Mortar. , Brick Work With Common Burnt Clay F.P.S. (Non Modular) Bricks Of Class Designation 7.5 In Foundation And Plinth In: Cement Mortar 1:6 (1 Cement : 6 Coarse Sand) , 12 Mm Cement Plaster Of Mix : 1:6 (1 Cement: 6 Coarse Sand) , Washed Stone Grit Plaster On Exterior Walls Height Upto 10 Metre Above Ground Level, In Two Layers, Under Layer 12 Mm Cement Plaster 1:4 (1 Cement : 4 Coarse Sand ), Furrowing The Under Layer With Scratching Tool, Applying Cement Slurry On The Under Layer @ 2 Kg Of Cement Per Square Metre, Top Layer 15 Mm Cement Plaster 1:1/ 2:2 (1 Cement: 1/2 Coarse Sand : 2 Stone Chipping 10 Mm Nominal Size), In Panels With Groove All Around As Per Approved Pattern, Including Scrubbing And Washing The Top Layer With Brushes And Water To Expose The Stone Chippings ,Complete As Per Specification And Direction Of Engineer-In-Charge (Payment For Providing Grooves Shall Be Made Separately). , Forming Groove Of Uniform Size In The Top Layer Of Washed Stone Grit Plaster As Per Approved Pattern Using Wooden Battens, Nailed To The Under Layer, Including Removal Of Wooden Battens, Repair To The Edges Of Panels And Finishing The Groove Complete As Per Specifications And Direction Of The Engineer-In-Charge : 15 Mm Wide And 15 Mm Deep Groove , Structural Steel Work In Single Section, Fixed With Or Without Connecting Plate, Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete. , Painting With Synthetic Enamel Paint Of Approved Brand And Manufacture To Give An Even Shade : One Or More Coats On Old Work , Providing And Applying
|