Indian Tenders

Tender Notice

TDR 53127959
Tendering Authority National Highways and Infrastructure Development Corporation Limited
Tender No NHIDCL/HQ/Uttarakhand/DPR/ Dehradun-Nainital/2025
Tender ID 2025_NHIDC_891309_1
Tender Brief Corrigendum : Tender For Consultancy Services For Preparation Of Dpr And Pre-Construction Activities For Dehradun-Kashipur-Nainital In The State Of Uttarakhand
City nainital
State Uttarakhand
Document Fees INR 5900 /-
EMD Refer document
Tender Value Refer document
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Consultancy Services For Preparation Of Dpr And Pre-Construction Activities For Dehradun-Kashipur-Nainital In The State Of Uttarakhand

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 30-01-2026 Corrigendum No. 2 Date 05-02-2026
2 21-01-2026 Corrigendum No. 1 Date 30-01-2026
3 21-01-2026 Reply to Pre Bid Queries Other 22-01-2026

Key Dates

Publish Date 30-01-2026
Last Date of Bid Submission 05-02-2026
Tender Opening Date 06-02-2026

Contact Information

Company Name National Highways and Infrastructure Development Corporation Limited
Contact Person Mohammad Khalid
Address NHIDCL HQ, 1st floor, tower A, world trade center, New Delhi

BOQ Items

Name of Work:Consultancy services for preparation of Detailed Project Report and pre construction activities in respect of construction of greenfield alignment/widening of existing carriageway to 2 lane with paved shoulder configurationalong with mitigation measures of vulnerable sinking / sliding zones of sectionfor Dehradun– Kashipur-Nainital in the State of Uttarakhand
Sl. No. Item Description
1Remuneration for Local Staff (inclusive of per Diem allowance)
2PROFESSIONAL Staff
3Team Leader cum Senior Highway Engineer
4Senior Bridge Engineer/ Structural Engineer
5Geotechnical cum Material Engineer
6Geologist
7Senior Survey Engineer
8Traffic and Safety Expert
9Environmental Specialist
10Quantity Surveyor/ Documentation Expert
11Land Acquistion Expert
12Utility Expert
13Sub-Professional Staff: (one sub-professional to be a fresh graduate)
14Assistant Highway Cum Pavement Engineer
15Survey Engineer
16Assistant Quantity Surveyor/Documentation Expert
17Support Staff (Fixed Rates)
18Office Manager (1 No.)
19Typist (1 No.)
20Office Boy (1 No.)
21Night Watchman (1 No.)
22Transportation (Fixed Costs)
23The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (1 Vehicle for 6 months)
24Duty Travel to Site (Fixed Costs)
25All Trips
26Office Rent (Fixed Costs)
27The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
28Office Supplies, Utilities and Communication (Fixed Costs)
29Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication
30Office Furniture and Equipment (Fixed costs)
31Office Furniture and Equipment
32Reports and Document (Fixed costs)
33Monthly Report (03 sets)
34Inception Report & QAP
35Environment and Social Impact Screening Report
36Draft Feasibility Report
37Final Feasibility Report
38Strip Plan with L.A. Reports
39Draft LA and Clearances I Report
40Final LA and Clearances I Report
41Draft Environmental Assessment report & RAP
42Final Environmental Assessment report & RAP
43Draft Detailed Design Report & Drawings etc.
44Draft EMP
45Draft Bidding Documents
46Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
47Final EMP
48Final Bidding Documents
49Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
50LA & Clearances II Report
51Survey and Investigation
52A.Topographical Survey (Fixed Rate)
53Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
54B. Investigation (Fixed cost)
55All investigations/surveys including Road and Bridge Inventory,FWD Test and Pavement Evaluation,Roughness Survey,Axle Load Survey,Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies,Land Acquisition Studies, any other investigation surveys etc.
56Net Work Survey and GPR
57Net work Survey of the existing Highways as arepository for civil work as per directions fromAuthority.
58GPR Survey for detection of under ground utilities
59Sub-soil Investigation & Other Works
60Sub-Soil Investigation
61a)Boring in all type of soils (other than hard rock)
62b) Boringinhard rock
63Cost of supply and fixing Boundary Pillars
64Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
65Land Acquisition Team including support staff and logistics/transportation
66A. Land acquisition Team including support staff
67Ex-Land Revenue Inspector/Officer or equivalent
68Ex-Kanoongo/ Girdawar or equivalent
69Ex-Patwari or equivalent
70Typist
71Peon
72B. Logistics for Land acquisition Team
73Computer including necessary peripherals
74Printers
75Vehicles (Bolero or equivalent) withmonthly running limit of 4000 km (01 no)

Other Detail

Information Source https://eprocure.gov.in/eprocure/app
Download FileName File Description File Size
Download 25334bf8-a99d-4027-afa4-8f84da4cf7cb.html Tender Documents 0 KB
Download BOQ_936878.xls Tender Documents 0 KB
Download RFP.pdf Tender Documents 0 KB
Download Tendernotice_1.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.