| 1 | Transportation of D.C. Rig machine & its T&P from store to the site of tubewell. |
| 2 | Transportation of T.W. Assembly From Store to the site of Tubewell. |
| 3 | Transportation of 600 P.S.I Air Compressor and its T&P from store to the site. |
| 4 | Transportation of O.P Unit and its T&P from store to the site. |
| 5 | 300 mm. dia 7.1 mm thick MSERW Housing Pipe |
| 6 | 300x200 mm dia M.S Reducer |
| 7 | 200mm dia 7.1 mm thick MSERW Plain Pipe |
| 8 | 200mm dia 7.1 mm thick MSERW Slotted pipe |
| 9 | 200mm dia Bail Plug |
| 10 | 300 mm dia M.S. Clamp |
| 11 | 300 mm dia Well Cap. |
| 12 | 300 mm dia M.S. Ring |
| 13 | 200 mm dia M.S. Ring |
| 14 | 300 mm dia Tubewell assembly support |
| 15 | 200mm M.S. Centre Guide |
| 16 | Supply of Lal Kuan quarry Pea Gravel 1.6 to 4.8 mm. size duly screened, washed and stacked, with carting loading, unloading complete at site |
| 17 | Installation of Rig Machine alongwith dressing the site of work then drilling by 200/ 300 mm size bit upto required depth then reaming by 450mm, 550mm, and 675mm size bits, after drilling the dismantling work will be done. Erection of DC Rig Machine, T&P and camp equipages |
| 18 | Dismantling of Rig Machine and its T&P |
| 19 | Drilling of 675 mm dia bore from GL to 80 M. BGL |
| 20 | Drilling of 550 mm. dia Bore from 80 M to 120 M. BGL |
| 21 | Drilling of 550 mm. dia Bore from 120 to 160 M. BGL |
| 22 | Drilling of 550 mm. dia. Bore from 160 to 180M. BGL |
| 23 | \"Water arrangement charges for during the drilling (UPJN-2019-20-EP-(26)Attached)\" |
| 24 | Logging of bore hole by Electric logger (UPJN-Oder Attached) |
| 25 | Barricading of site for safety with necessary T&P and required labour etc. complete.(UPJN-Order Attached) |
| 26 | Lowering of 300/200 mm dia size tubewell assembly from ground level to 370 M below ground level including gravelling work etc. complete. (A)300mm dia Housing Pipe from G.L to 66 M. BGL. |
| 27 | (B)200 mm. dia Plain/Slotted Pipe From 66 M. BGL to 80 M BGL |
| 28 | (D)200 mm. dia Plain/Slotted Pipe From 120 M. BGL to 160 M BGL |
| 29 | (E)200 mm. dia Plain/Slotted Pipe From 160 M. BGL to 165 M BGL |
| 30 | Erection of 600 PSI Air-Compressor, T&P and camp equipages |
| 31 | Development of T.W. by 600 P.S.I. Air Compressor upto 100 hrs |
| 32 | Dismantling of Air Compressor and its T&P |
| 33 | Erection of O.P. Unit, T&P and camp equipages |
| 34 | Development of T.W. by O.P. Unit upto 150 hrs |
| 35 | Dismantling of O.P. Unit and its T&P |
| 36 | Yield and verticality test of T.W. alongwith Chemical and Bacterialogical analysis of tubewell\"s water. |
| 37 | SUPPLY OF FOLLOWING ITEMS S/F of 15 H.P Clear water submersible pump complete with electric motor capable to operate on 415± volts 3 phase 50 c/s A.C. supply of 1000 LPM, 60 mtr Head (1200LPM 45M head 15HP) PSR |
| 38 | S/F of 20 H.P. switch gear along with starter and control panel, cabel etc. Complete |
| 39 | MAIN PIPING AND VALVES Set 1 S/F of 150 mm dia 5.4 mm thick M.S. column pipe with both end flanged and groove for passing of submersible cable in each lenth in 3m long Total 24 m with 1m long top pipe with cap (Damdam) and sealing ring. Nos 10 S/F of CI-D/F 90 bend of size 150 mm dia. Nos 1 S/F of CI-A/F tee of size 150 mm dia. Nos 1 S/F of M.S. Distance piece of 150 mm dia 1.00m long 2 Nos and 1.5m long 1 No. Nos 3 S/F of M.S. enlarger/reducer of suitable size. Nos 1 S/F of 150mm dia Sluice Valve with hand wheel Nos 2 (Confirming to15.780/I.S.2905) S/F of 150 mm dia Reflex Valve (Confirming to IS-5312 part-1) Nos 1 (UPJN-2019-20-PP -4 Attached) Please Enable Macros to View BoQ information |