| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. |
| 3 | Providingandlayinginpositioncementconcreteof specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from naturalsources :10gradedstoneaggregate40mm nominal size derived from natural sources) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete,excludingthecostofcentering,shuttering,finishingand reinforcement - All work up to plinth level : 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors,roofs,landings,balconies and access platform |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:Lintels,beams,plinthbeams,girders,bressumersand cantilevers |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls- Under 20 cm wide |
| 8 | Steelreinforcement forR.C.C.workincludingstraightening,cutting, bending, placing in position and binding all complete upto plinth level : Thermo-Mechanically Treatedbars of gradeFe-500D or more. |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4(1 cement :4 coarse sand) |
| 10 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in : cement mortar 1:4(1 cement :4 coarse sand) |
| 11 | Cement concrete flooring 1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete: 40 mm thick with 20 mm nominal size stone aggregate |
| 12 | 12 mm cement plaster finished with a floating coat of neat cement of mix: 1:3(1 cement: 3 fine sand) |
| 13 | 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:3(1 cement: 3 fine sand) |
| 14 | 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) |
| 15 | Providing and fixing soil, waste and vent pipes :100 mm dia- Sand cast iron S&S pipe as per IS: 1729 |
| 16 | Providing and fixing terminal guard : 100 mm- Sand cast iron S&S as per IS - 1729 |
| 17 | Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS : 10910, on 12 mm dia steel bar conforming to IS: 1786, having minimum cross section as 23 mmx25 mm and over all minimum length 263 mm and width as 165 mm with minimum 1 12 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufacture\"s permanent identification mark to be visible even after fixing, including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) complete as per design. |
| 18 | Total |
| 19 | Modified EC after less for the correction factor on DSR 2023 @ 0.973 |
| 20 | Add Cost [email protected] % on DSR 2023 TotalRs. |
| 21 | Total |