| 1 | SUPPLY OF SILICAGEL BLUE |
| 2 | 0.6KVA UPS |
| 3 | STAY SET COMPLETE( QUOTE PRICE FOR SINGLE UNIT ONLY) |
| 4 | SILICAGEL BLUE 10 TO 12MM |
| 5 | Pole pit for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr |
| 6 | Ordinary soil |
| 7 | Semi rocky soil |
| 8 | Heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned EE] |
| 9 | Stay pit |
| 10 | in ordinary soil [0.95 x 0.6 x 1.2m] |
| 11 | semi rocky soil |
| 12 | Stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned EE] |
| 13 | Erection of poles & stays (Including refilling of excavated earth) |
| 14 | Erection of 7.5m / 8.0m poles [RCC / PSC] |
| 15 | Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles |
| 16 | Stay set |
| 17 | Erection stay set complete |
| 18 | Stay erection without rod and pit |
| 19 | Replacement of stay rod only. (Including stay pit excavation & refilling & erection) |
| 20 | Replacement of guy shackle only in existing stay |
| 21 | Erection of LINE MATERIALS |
| 22 | Fixing of LT 1 ph \"X\" Arm |
| 23 | Fixing of LT/HT TI Fitting |
| 24 | Fixing of LT 3 ph \"X\" Arm |
| 25 | Fixing of 3[1/2]\" \" V ` X \" arm |
| 26 | Fixing of 4[1/2]\" V ` X \" arm |
| 27 | Fixing of 5\" V X arm |
| 28 | Fixing of tapping channel / guarding \"X\" arm |
| 29 | Providing of line spacers in LT lines 1 phase |
| 30 | Providing of line spacers in LT lines 3 phase |
| 31 | Erection of AB Switch with PT insulator & Jumpering complete |
| 32 | Erection of centre rotating Switch AB Switch complete |
| 33 | FIXING OF HT PIN INSULATOR / STRAIN DISC |
| 34 | 11 KV Pin insulator with pin |
| 35 | 11 KV strain disc / polymer disc with hardware |
| 36 | 22 KV Pin insulator with pin |
| 37 | 22 KV Strain disc / polymer disc with hardware |
| 38 | 33 KV Pin insulator with pin |
| 39 | 33 KV Pin Strain disc/polymer disc with hardware |
| 40 | Fixing of LT Pin insulator with pin |
| 41 | LT Shakle with hardware |
| 42 | Fixing of Aluminium knob |
| 43 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run |
| 44 | Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm |
| 45 | ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm |
| 46 | ACSR 7/4.09 mm |
| 47 | Above 7/4.09 mm ACSR & DOG conductor |
| 48 | Earthing wiring and connection including transporting of earth pipe and excavation of pit] |
| 49 | Transformer structure earthing 10ft depth - 3 nos of pipe through Tubes |
| 50 | DP earthing including all works [double side earthing] |
| 51 | Erection of 4th Earth pipe including earthing |
| 52 | Earthing of poles |
| 53 | Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. |
| 54 | Replacement of detoriated earth pipe per location |
| 55 | Concreting with Mixture 1:3:6 [including All materials]. |
| 56 | Mass Concreting for centre support for 2 feet including all materials |
| 57 | Mass concreting for pole0.6x0.6x1.25M.with coping |
| 58 | Sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping |
| 59 | Sleeve concreting for stay set 0.3 m & 0.75 long |
| 60 | Erection of Distribution Transformer Structure Complete |
| 61 | Excavation of structure pole Pits 0.9 X 0.9 X 1.83 Mtr |
| 62 | Transporting of pole to pit location 2 Nos. |
| 63 | Erection of poles 2 Nos |
| 64 | Excavation of stay pit 4 Nos |
| 65 | Erection of stay set (4 sets) |
| 66 | Mass concreting (Cement:Sand:Jelly supplied by the contractor) 2 Nos. |
| 67 | Erection of 22 KV AB Switch |
| 68 | Ttransformer structure earthing 10ft depth - 3 nos of pipe through Earth Tubes |
| 69 | Erection of Top Channel |
| 70 | Bed Channel [2 nos channel] Erection |
| 71 | Cross with stud for bed channel Erection |
| 72 | Erection of belting angle / HG fuse angle |
| 73 | Erection of HG fuse Set |
| 74 | Erection of HT LAS with jumpering and earthing |
| 75 | Erection of LT LAS with jumbering and earthing |
| 76 | Erection of Jumpering [HT Side] |
| 77 | Transformer wiring in LT side including Jumpering Bus bar etc. |
| 78 | Erection LT open type fuse unit arrangement single |
| 79 | Erection LT open type fuse unit arrangement Double |
| 80 | Painting of stru. Complete excluding DT [two coat of red oxide] all metal parts(excluding cost of paint). |
| 81 | Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint) |
| 82 | Colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] |
| 83 | Painting name of SS at seating channel including paint. |
| 84 | Painting of DT alone [excluding painting] with red oxide and double coating of aluminium paint. |
| 85 | DT metering arrangement (without materials) |
| 86 | Erection of distribution Transformer /dismantling of DT |
| 87 | Upto 100 KVA |
| 88 | above 100 KVA and Upto 250 KVA |
| 89 | 500 KVA |
| 90 | Colour washing of RCC / PSC poles |
| 91 | Numbering of poles including cost of paint / loc [black background and yellow letters] |
| 92 | Painting of SC details in the meter board / Agl boxes / Hut SCs including paint. |
| 93 | SERVICE CONNECTION |
| 94 | Transporting of required materials from road side to work spot and erection of street light fixture including wiring Clamping of pipe aerial board assembling |
| 95 | Transporting of required materials from road side to work spot and erection of 250 W S.V. lamp / Mercury lamp/LED Yard Light Fitting including wiring, clamping of pipe, serial board assembling etc. |
| 96 | Fixing of street light fitting with 2 CFL/ 4 CFL |
| 97 | Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc. |
| 98 | Erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot |
| 99 | Erection/dismantling of metering set 11 KV / 22 KV/33 KV |
| 100 | Fabrication Works. |
| 101 | Labour charges for alteration of back clamp / stay clamp to suitable for works. |
| 102 | Providing of Holes. |
| 103 | All size angles / channel upto 5/8\" |
| 104 | All size angles / channel above 5/8\" |
| 105 | Slot holes in flat / angles / channel upto 3/4\" |
| 106 | Slot holes in flat / angles / channel above 3/4\" |
| 107 | Fabrication of centre support only for DT structure |
| 108 | Cutting of RS Joist / Angles / MS Channels |
| 109 | Welding of RS Joist / Angles / MS Channels |
| 110 | GENERAL |
| 111 | Set right the leaning pole in both HT & LT [ pin point ] location |
| 112 | Set right the leaning pole in both HT & LT [ cut point ] location |
| 113 | Resagging of lines for all sizes cut point location |
| 114 | Converting pin point into cut point HT lines |
| 115 | Converting pin point into cut point LT lines |
| 116 | Clearing tree branches of coconut tree |
| 117 | Clearing tree branches of Neem, tamarind, country tree etc., |
| 118 | Releasing and erection 1 ph SC wire [during conductor or support change] |
| 119 | Releasing and erection 3 ph SC wire [during conductor or support change] |
| 120 | Destruction of pole concerting at site. |
| 121 | Retrieving grill from detoriated pole [grill separate from damaged pole] |
| 122 | Re earthing of structure completely including earthpipe changing if any 3nos earth pipe |
| 123 | Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe ) |
| 124 | Guarding Arrangement :- |
| 125 | Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ] |
| 126 | Flat guarding with 4 wire |
| 127 | Split Netural Guarding |
| 128 | LOADING AND UNLOADING : |
| 129 | Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [per pole ] |
| 130 | Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] |
| 131 | Unloading of PSC / RCC / Metal Poles |
| 132 | TRANSPORTING FROM ROAD SIDE TO WORKSPOT |
| 133 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km |
| 134 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles above additional 1.0 Km or part thereof [ certified by AEE ] |
| 135 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km |
| 136 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto above additional 1.0 Km or part thereof |
| 137 | TRANSPORT OF LINE MATERIALS |
| 138 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading Upto 8 kms |
| 139 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading above 8 Kms and for every addl. 1 KM |
| 140 | TRANSPORT OF EQUIPEMENTS |
| 141 | Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum Up to 30 Km |
| 142 | .Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum above 30 Km for every addl .1 KM |
| 143 | DISMANTLING WORKS |
| 144 | Dismantling of 7.5m / 8.0m poles [RCC / PSC] |
| 145 | Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all metal poles |
| 146 | Dismantling stay set complete |
| 147 | Dismantling of LT 1 ph \"X\" Arm / LT/HT TI Fitting |
| 148 | Dismantling of LT/HT TI Fitting |
| 149 | Dismantling of LT 3 ph \"X\" Arm |
| 150 | Dismantling of 3[1/2]\" V ` X \" arm |
| 151 | Dismantling of Tapping channel and Guarding X Arm |
| 152 | Dismantling of 11 KV strain disc/polymer disc with hardware |
| 153 | Dismantling of 22 KV Pin insulator with pin |
| 154 | Dismantling of 22 KV Strain disc with hardware |
| 155 | Dismantling of 33 KV Pin insulator with pin |
| 156 | Dismantling of 33 KV Strain disc with hardware |
| 157 | Dismantling of LT Pin insulator with pin |
| 158 | Dismantling of LT Shackle with hardware |
| 159 | Dismantling of Aluminium knob |
| 160 | Dismantling of Conductor 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm |
| 161 | Dismantling of Conductor ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm |
| 162 | Dismantling of Conductor ACSR 7/4.09 mm |
| 163 | SINGLE PHASE METER &3 PHASE METER |
| 164 | Fixing of single phase meter |
| 165 | Fixing of 3 phase meter |
| 166 | Dismantling of single phase meter |
| 167 | Dismantling of 3 phase meter Please Enable Macros to View BoQ information |