Construction Of Foundation For Battery And Power Plant At Kavhe And Ridhore Bts Sites In Madha ,Solapur Ba. a)All kinds of soil 2 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). 2.00 One Cubic metre 7189.92 14380.00 3 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) 8.00 One Cubic metre 5501.48 44012.00 4 Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.