}

Tender For Under The Complete Deposit Scheme Under The Electricity Distribution Section Lakhimpur, Work Of Issuing New Connections/Increasing Load Etc. Of Government Tube Wells, Drinking Water Scheme And Other Future Consumers - Loading, Carriage & Unload, lakhimpur-Uttar Pradesh

Tender Notice

52094526
Tender For Under The Complete Deposit Scheme Under The Electricity Distribution Section Lakhimpur, Work Of Issuing New Connections/Increasing Load Etc. Of Government Tube Wells, Drinking Water Scheme And Other Future Consumers - Loading, Carriage & Unload
Tender
Indian
Uttar Pradesh
Lakhimpur
06-11-2025

Tender Details

Tender For Under The Complete Deposit Scheme Under The Electricity Distribution Section Lakhimpur, Work Of Issuing New Connections/Increasing Load Etc. Of Government Tube Wells, Drinking Water Scheme And Other Future Consumers - Loading, carriage & unloading of following materials from centre storeto work site and its stacking. Distance approx (0-15) kms. Under work area of EDD-Lakhimpur. 2 (A) Line Material. 3 (B) PCC pole 8.5/9 Mtr long 4 (C) STP Pole 9/11 Mtr. long. 5 (D)- T/F 10/16/25/63/100 KVA 6 (E)- T/F 250 KVA 7 (F)ACSR Rabit/Dog /Racoon/weasel/ conductor 8 (G)ABC( 3x120/95/70/25/16) Sqmm. 9 (H)11 KV XLPE Cable (3x35/70/120/185/240) 10 (I) 11kv pilfer resistant metering cubical 11 (J) 33kv pilfer resistant metering cubical 12 (K)11 KV Pole mounted CT/PT 13 (L)DP Box 3 Phase 14 Fabrication, erection of sub-station type double pole on 8.5 mtr long PCC/11 mtr. Long ST pole along with fixing of necessary hardware of doble polealongwith necessery pin insulators as per RESPO specification and direction of E/I. 15 Dragging of ST/PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification. 16 Dragging of ST/PCC Pole from dump store to pit site, digging of pit erection & grouting (As per RESPO norms) of LT support suitable for laying of ABC line on 8.5mtr long PCC pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESPO specification. Only Pole will be provided by the department. 17 Fabrication, erection T-Off pole single section pole along with T-Off channel clamp disc fitting & pin accessories, grouting in 1:4:8 cement sand and brick ballast as per RESPO specification. 18 Providing and fixing of 11 KV DO fuse set along with clamps & nut bolts on existing of double pole. 19 Fixing of 11 KV TPMO along with clamps & nut bolts on existing of double pole. 20 Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wire& Earth rod shall be supplied by the department. 21 Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement). Only stay rod and Stay wire shall be supplied by the Department. 22 Laying and sagging of 3 phase 3 wire 11 KV line on ACSR weasel/rabbit/Raccoon/Dog conductor as per RESPO specification and direction of E/I. 23 Providing and fixing of guarding angle on existing 11 KV support with clamp and nut bolts. 24 Cradle guarding of HT line by GI wire. GI wire shall be supplied by the department. 25 Erection & commissioning of (3x120/95/70/25/16 Sq.mm) Aerial Bunched Conductor. 26 Laying of cable 11 KV XLPE cable (3x35/70/120/185/240) sqmm in pakka road by boring method laying cable as per RESPO specification & direction of E/I. 27 Laying of cable 11 KV Through piping . 28 Hoisting of 11 KV XLPE Cable will be passed through MS pipe of required size duly clamped with pole at the bottom, middle and top of the pole. 29 Supply and fixing of 11 KVCablejoining kit O/D and I/D. 30 Installation of 11 KV CT/PT on double pole connected with metering unit along with providing and fixing of all accessories such as S/S base, MS flat, clamps, nut and bolts its jumpering and commissioning. 31 Dragging of 11 KV Pilfer metering cubical inside the metering room, its installation and commissioning. 32 Dragging of 33 KV Pilfer metering cubical inside the metering room, its installation and commissioning. 33 Fixing of 3 phase distribution box/kiosk on the LT poles including all clamps and material required for mounting connections and sealing. 34 Making section of 11 KV line by fixing of All necessaries accessories such asT-Off channel disc insulator with fitting pin insulator with pin along with sagging jumpering and binding etc only insulator shall be provided by the dept. 35 Cutting and chopping of tree branches for clearance of HT/LT Line. After clearance line throughout pieces of tree branches of site. 36 Safe installation & energisation of 10/16/25/63/100 KVA T/F on double pole by providing and fixing of L-piece, Lugs making HT/LT connections and its commissioning. Only Transformer shall be supplied by the deppt. 37 Safe installation & energisation of 250 KVA T/F on double pole by providing and fixing of L-piece, Lugs making HT/LT connections and its commissioning. Only Transformer shall be supplied by the deppt. 38 Construction new Fencing of100/250 kVA distribution Transformers installed under EDD-ILakhimpur by MS Sqaremesh fabricated on MS angles of size 50X50X6mm and MS striphaving overall dimension complete with one no gate with provision of hinges roller & lacking arrangement properly grouted and painted with one coat of Red Oxide primer and two coasts of Bus Green Super enamel Paint. 39 Construction new plinth of100/250 kVA Distribution transformer of size 5x5x4 Fit with first class bricks, cement and coarse sand as per RESPO Norms alongwith cost of materials. 40 Work for earthing of Distribution Transformer with G.I. Pipe type earthing pipe size 3cm dia from ground up-to the water level (Minimum 20 feet deep) as per standard practice (All materials shall be provided by the contractor) in work area of EDD-I Lakhimpur Kheri. 41 Supply of top Droper T-off clamp 42 Fabrication T-Off Top Droper S/s Base Grouting Engal 43 Supply of Net-Bolt i-type 44 Supply of 10/16 kva T/F Holding Clamp 45 Supply of LT Clamp for PCC/ST Pole 46 Supply of Holding Clamp for PCC/ST Pole 47 Supply of F-Clamp 48 Supply of Stay Clamp

Key Value

Document Fees
INR 3540 /-
Tender Value
INR 20 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail