}

Tender For Digwaniya Link Road Repair/Renewal Work (Including 05 Year Maintenance) - Earthwork In Cutting Or In Embarkment In Ordinary Soil, Excavationto Be In Theform Ofregularpitsnot Exceedingi/2 Metre(20Gin Deptkand Earthwork In Embankmentto Be In 20 , mandi-Uttar Pradesh

Tender Notice

52092847
Tender For Digwaniya Link Road Repair/Renewal Work (Including 05 Year Maintenance) - Earthwork In Cutting Or In Embarkment In Ordinary Soil, Excavationto Be In Theform Ofregularpitsnot Exceedingi/2 Metre(20Gin Deptkand Earthwork In Embankmentto Be In 20
Tender
Indian
Uttar Pradesh
Mandi
07-11-2025

Tender Details

Tender For Digwaniya Link Road Repair/Renewal Work (Including 05 Year Maintenance) - Earthwork in cutting or in embarkment in ordinary soil, excavationto be in theform ofregularpitsnot exceedingI/2 metre(20gin deptkand earthwork in embankmentto be in 20 cm (8) layers, including ramming & dressingthe surfaceto requiredlevelsand slopes and also including 1.5 metre (5ffs) liíts and 30m. (100) lead.The earthfrom cuttingto be used in making embankmentor to be depositedas directedby Engineer- in-charee. 2 WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 3 Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. 4 Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. 5 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat 6 Providing and fixing of typical informatory sign board as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25 mm x 5 mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25 mm x 5 mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos 75 mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 600 mm, 600 mm below ground level. All M.S. will be stove enameled on both sides. Lettering and printing arrows, enamelpaints of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 (As per Banda SOR Dt. 26.04.2018 Ch- 10 Item No 10.16) 7 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for1 st year maintenance cost @ 0.0 % 8 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for2nd year maintenance cost @ 1.50 % 9 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for3rd year maintenance cost @ 3.00 % 10 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for4thyear maintenance cost @ 4.50 % 11 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for5thyear maintenance cost @ 6.00 % 12 Excavation in foundation in ordinarysoil (loan clay or sand) including lift up to 1.5m and lead up to 30m and dressing for sides and ramming of bottom and disposal of surplus excavated earth as directed by the E/I within a lead of 50m (Si. No. 251) 13 WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 14 M-150 Class brick work 1:4 cement and Ceorse sand of 1.25mortar in foundation and plinth including supply of all materials labour T&P etc. required for proper completion of the work (S.I. No-305) 15 Cost cement concrete door sills chaukhats boundary posts shaleves and similer work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion of 1:2:4 16 Cement concrete with 20/10 mm gauge approved stone grit coarse sand 2.5 F.M. and cement proportion of M20 (1:1.5:3) including supply of all materials labour and T&P required for proper completion of work (Road Slab) 17 Supply and laying of 125 micron pollythene sheet including supply of all material labour and T&P etc complete required for proper completion of works. 18 Supply and laying Glass strip 3.15-3.50 mm thick plain glass in joints of C.C. road including supply of all materials labour and T&P etc.(10X6cm) 19 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for1 st year maintenance cost @ 0.0 % 20 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for2nd year maintenance cost @ 0.25 % 21 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for3rd year maintenance cost @ 0.50 % 22 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for4thyear maintenance cost @ 0.75 % 23 The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for5thyear maintenance cost @ 1.00 %

Key Value

Document Fees
INR 7400 /-
EMD
INR 408000.0 /-
Tender Value
INR 41.42 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail