Tender For Providing Culvert At Gundu Salaiward : 02 In Cuddalore Corporation.; 1 Earthwork excavation in all classes soils and subsoil except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification 2 Providing Sand filling including cost and conveyance ofSand from approved quarryto working site including cost of conveyance of all materials and all labour charge for loading, unlodaing, stacking to departmental metric gauge for taking pre measurement by the department engineer , filling, watering, rammingand consolidation etc, complete and as per STD specification. 3 Cement concrete of mix 1:4:8 (one cement – four sand – eight broken stone) using ISS Hard broken granite stone jelly of 40 mm gauge from approved quarry to working site including cost of conveyance of all materials to working site and all labour charge for mixing, placing, compaction, finishing and curing by the direction of departmental engineers instruction etc, complete and as per standard specification 4 Supplying and Erecting of centering for sides and soffits including necessary supports and shuttering to the required height for RCC works with standard Specifications etc. complete 5 Drain 6 culvert 7 Plain Cement Concrete in 1:2:4 (one part of cement , Two of part of sand and four part of broken stone) using 20mm ISS size hard granite machine crushed metal from approved quarry to working site including cost of conveyance of all materials to working site and all labour charge for mixing, placing, compaction, finishing and curing by the direction of departmental engineers instruction etc, complete and as per standard specification 8 ReinforcedCement Concrete 1:1/2:3 (one cement one and half sand and three aggregate) using 20mm gauge machine broken hard granite machine crushed metal from approved quarry to working site including cost of conveyance of all materials to working site and all labour charge for mixing, placing, compaction, finishing and curing by the direction of departmental engineers instruction etc, complete and as per standard Specifications. 9 Supplying, and fabrication of MS/RTS bar including cost of conveyance of all materials and all labour charge for cutting, bending, straitening and tying in proper position with binding wire by the direction of departmental engineers instruction etc, complete and as per standard specification. 10 For GST 18%
|