1.Eos to 1 No New Temporary service to Thiru.P.Suresh S/o Pichandi, Vanjur Village and Post, Katpadi Tk and Others 8 Nos Work (2.DCW-Thiru.Abinesh Panday, 3.Eos-Thiru.K.Devaraj S/o E.Kumarasamy, 4.Eos-Thiru.M.Jeeva Bharathi, 5.DCW-Thiru.C.Balaraman S/o Chinnasamy, 6.DCW-Tmty.R.Ranjitha W/o Raja, 7.Dcw-Thiru.V.Rajadurai S/o Vasanthakumar, 8.Eos-Railway Pump House-SS, 9.Dcw-Thiru.G.Balaji, Dharapadavedu) in respect of AE/Urban/Dharapadavedu Section. => Limited; 1 Excavation of pole pit for pole upto 8.00m length by using JCB/Manual 2 Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual 3 Excavation of pole pit for pole above 8.00m length by using JCB/Manual 4 Excavation of pole pit for pole above 8.00m length by using JCB/Manual in Hard Soil 5 Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual 6 Fixing of Tapping X-Arm/Guarding X-Arm 7 Fixing of V Cross Arm 8 Fixing of HT/LT TI Fittings 9 Fixing of LT 1 phase cross arm 10 Fixing of LT 3 phase cross arm 11 Fixing of 11 KV Strain Disc with Metal Parts 12 Fixing of 11 KV Pin Insulator/Polymer Pin Insulator 13 Excavation of Stay pit of 4.5 to 5 depth using JCB / Manual 14 Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.. 15 Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor 16 Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor 17 Paving and stringing of conductors of sizes7/4.09 mm ACSR or Other equivalent conductor 18 Fixing of LT Shackle 19 Fixing of LT Pin Insulator 20 Fixing of Alu Knob 21 Erection of 11 KV Single Pole Structure including erection of DT complete with centre support including fixing of MCD box 22 Loading and Unloading of Distribution Transformer (i) Upto 100 KVA 23 Loading and Unloading of Distribution Transformer (ii) Above 100 KVA to upto 500 KVA 24 Transporting of Distribution Transformerfrom stores to office /site upto 10 KM distance by engaging 1 Ton Capacity Minidor (Lorry) 25 Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (i) For a lead upto 5 KM 26 Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (ii) Above 5 KM (5 X 75 =Rs.375) 27 Dismantling of conductor above 7/3.35 mm including closing of the pit 28 Dismantling of conductor upto 7/3.35 mm including closing of the pit 29 Dismantling of RCC,REC,PSC & metal pole of all sizes including the closing of the pit 30 Resagging of one run of all size of conductor (i) 7/2.50 mm AAAC 7/2.59 mm ACSR 31 Resagging of one run of all size of conductor (ii) 7/3.15 mm AAAC 7/3.35 mm ACSR 32 Dismantling of line materials, cross arm, clamps, TI Fittings etc.., 33 Concretingwith 1:4:8 mix using 40 mm Jelly including curing(Material +labour) (i) Mass concreting of poles 34 Earthing of Pole 35 Dismantling of Double Pole Structure with complete set 36 G.S.T. @18% should be Entered by the Bidder
|