Tender For Patch Repair Work Of Odr In Vidhan Sabha Amethi - Collection of 22.4-53 mm SSb including allMaterial T&P etc complete loadding unloading Stacking & cartage at site. 2 Collection of Shankargarh Stone Dustincluding all Material T&P etc complete loadding unloading Stacking & cartage at site. 3 Consolidation of 22.4-53 mm SSb inpatch repair by hand rammer. including all Material T&P etc complete. 4 Patch repair with PC Material 13.2 & 11.2 mm gauge approved grit of painted miles with tar and bitumen including heating the paint to the required temprature pouring it on the surface spreading grit and ramming hard the same with hand rammer/roller and also including clearing with brushes and also including collection of grit fuel, Labour, T&P etc. Including cost of Bitumen.(Including Tack Coat) 5 Patch repair with Seal coat6.7 mm gauge approved grit of painted miles with tar and bitumen including heating the paint to the required temprature pouring it on the surface spreading grit and ramming hard the same with hand rammer/roller and also including clearing with brushes and also including collection of grit fuel, Labour, T&P etc.Including cost of Bitumen . 6 Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with hydraulic broom as per technical specicification Clause 503. For BC Work 7 Patch repair with Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4per centof mix and filler, transporting the hot mix to work site, the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. For BC Work 8 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: 2.1.1All kinds of soil. 0 to 0.30 M 9 Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. 10 Clearingjungleincludinguprootingofrankvegetation,grass,brushwood, treesandsaplingsofgirthupto30cmmeasuredataheightof1mabove groundlevelandremovalofrubbishuptoadistanceof50moutsidethe periphery of the area cleared.
|