Procurement Of Various Materials For Construction Of Kitchen Hall In Nigadi - Gpn-Sharpening Charges,Gpn-Mason Class I (With Tools),Gpn-Mason Class Ii (With Tools),Gpn-Painter Class I,Gpn-Unit Cost As Per The Specification,Gpn-Mixer (Concrete) - 1 Cum Capacity,Gpn-Mixer (Concrete Small Used In Culvert),Gpn-Hom Of Welding And Grinding Machine,Gpn-Hom Of Vibrator 0.71 Days,Gpn-Hom Of Cutting And Grinding Machine,Gpn-Welder Grade I,Gpn-Mechanic Class Ii/Mechanic Hmp Grade I/Eme Grade,Gpn-Fitter Class I,Gpn-Worksite Facilities/Creche/Drinking Water/First Aid,Gpn-Conveyance,Gpn-Solid Concrete Blocks (40 X 15 X 20 Cms)-4.00 N/Sqmm,Gpn-Tmt Bars Fe 500,Gpn-Vitrified Tiles 600X600 Mm,Gpn-Whitening,Gpn-Ready Mix Primer Paint (Ready Mix Red Lead Paint),Gpn-Enamel Metal Paint,Gpn-Glazed Tiles 300X450,Gpn-M.S Rods,Gpn-Border Tiles 30 X 10 Cms,Gpn-Plastic Emulsion Paint,Gpn-Dry Distemper,Gpn-Portland Cement,Gpn-Binding Wire,Gpn-Silver Oak Or Equivalent Planks 38 Mm Thick,Gpn-Corbon Electrodes,Gpn-Casurina Poles 100 - 150 Mm,Gpn-Rms Gusset Plate,Gpn-Ms Pipes Of 80 Mm To 100 Mm Dia,Gpn-Super Plasticizer Admixture Is Marked As Per 9-103-1999,Gpn-Ms Flat,Gpn-Stone Chistler Class Ii,Gpn-The Cost Of All Materials, Centering, Transportation, Fixing, Wastage And Other Extra Charges Etc, Excluding The Cost Of Unskilled Labour,Gpn-Transportation/Loading And Unloading Of Material/Lifting Of Material/Centering Charges Wherever Necessary /Over Head/Wastage/Unforeseen Charges/Miscellaneous Which Are Necessary During Execution,Gpn-Electrification,Gpn-Size Stone 20 X 20 X 25 Cms,Gpn-Broken Stone Aggregate 40 Mm Size,Gpn-Broken Stone Aggregate 20 Mm Size,Gpn-Broken Stone Aggregate 12 Mm To 10 Mm Size,Gpn-Boulders,Gpn-Bond Stone 20 X 20 X 45 Cm,Gpn-Coarse Sand (Zone Iii)
|