pavement work from village Malhapur to village HTender For Pavement Work From Village Malhapur To Village Haripuraripur - Clearingand grubbing roadland including uprooting wildvegetation, grass,bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumpsof such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, uptoaleado f 1000mincludingremoval and disposal oftoporganicsoi l not exceeding 150 mminthicknessa s per Technical Specification Clause 201. 2 Construction of embankment with approved materialobtainedfromborrowpitswith a lift upto 1.5 m, transporting to site, spreading, grading to required slopeandcompacting to meetrequirementof Tables 300.1 and 300.2witha leadupto 1000mas per Technical Specification Clause-301.5. 3 Laying brick soling layeron prepared sub-grade with brickonedging according to lines, graded and cross- sectionshown on the drawing filling joints with sand and earth,spreading 25 mm thick layerofearthover brick soling, watering androllingasperTechnicalSpecification Clause 412 4 Construction of granular sub-base by providing well gradConstructionof embankment with approved materialobtainedfromborrowpitswitha lift upto1.5m, transportingtosite, spreading, grading to requiredslope and compacting tomeet requirement of Tables300.1and 300.2 withalead upto 1000 m asper Technical Specification Clause-301.5.ed material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. 5 Construction of H.P culvert as per detaildrawing 300 mm Dia 6 Supply & Fixing Sign Board, As Per Detail Drawing
|