|
| 1 | Cartage of the following material from central store Meerut to J.E. store including loading & unloading at both ends (maximum distance up to 50 km.) (as per direction of Executive Engineer for successful completion of work.)1-P.C.C. Pole 8.5 Mtr. Long. |
| 2 | 2-Round Pole/ST Pole 11 mtr. Long. |
| 3 | 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 4 | Cartage of the following material from store J.E. to site of work including loading & unloading at both ends (maximum distance up to 10 km.)1-P.C.C. Pole 8.5 Mtr. Long. |
| 5 | 2-Round Pole/PCC Pole 9.5 mtr. Long. |
| 6 | 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 7 | Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.)1-63 KVA to 100 KVA |
| 8 | 2-10 KVA to 25 KVA |
| 9 | Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 15 km.)2-63 KVA to 100 KVA |
| 10 | 3-10 KVA to 25 KVA |
| 11 | Erection of Round Pole/P.C.C. Pole 8.5 Mtr. Long including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. 1-PCC Pole |
| 12 | 2-Round Pole/ST Pole 11 mtr. Long. |
| 13 | Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms. 1-Rabbit Conductor. |
| 14 | 2-Weasel Conductor. |
| 15 | Erection fixing & grouting of stay rod size 16X1800mm after digging the pit of size 0.60X0.30X0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. |
| 16 | Earthing of PCC support with MS Earth rod of 2.5 Mtr. Long including excavation of pit & driving of MS rod up to proper depth & connection the earth electrode with the help of GI wire. |
| 17 | Straightening of tilled PCC Pole of 11 KV/LT Lines after opening the bindings from insulators and digging the pit for require depth and refilling the same pit after completion of work including rebinding the conductor with insulators & sagging the conductor. |
| 18 | Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect.1-LT Pin Clamps with nut & bolt. |
| 19 | 2-Shackle Insulator with nut & bolt. |
| 20 | 3-Double Pole Clamps with nut & bolt. |
| 21 | Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect. |
| 22 | Providing & fixing of Stay insulator in stay wire as per site requirement. |
| 23 | Mounting of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line. 1-63 KVA to 100 KVA |
| 24 | 2-10 KVA to 25 KVA |
| 25 | Dismantling of PCC pole of existing line after opening all fittings and digging the pit of required size. |
| 26 | Cutting & Chopping of tree branches. |
| 27 | Dismantling of Damaged/Rusted STP/Rail pole of existing line after opening all fittings and digging the pit of required size. |
| 28 | Providing D-Type loop on each face & neutral. |
| 29 | Providing & fixing of bamboo sticks of required size on LT Line as per instructions of JE concerned. |
| 30 | Jumpering of 11 KV/LT Line at different places/T points. |
| 31 | Dismantling of D.P. including the work of dismanling of all accessories and connected HT/LT Line connections. |
| 32 | Removal of damaged/burnt conductor/GI wire after opening the bindings & making the role etc.1-Rabbit Conductor |
| 33 | 2-Weasel Conductor. |
| 34 | Replacement/Repairing of LT PVC Cable of existing T/F.:1-63 KVA to 100 KVA |
| 35 | Cartage of Dismantled and removal material from site to J.E store including loading & unloading at both ends maximum distance about upto15 Km. |
| 36 | Cartage of Dismantled and removal material from J.E store to Central Store Meerut including loading & unloading at both ends maximum distance about upto15 Km. |
| 37 | Cartage of old/damaged T/F. from work site to JE Store including loading & unloading at both ends. 1-63 KVA to 100 KVA |
| 38 | Cartage of old/damaged T/F. from JE Store to Central Store Meerut including loading & unloading at both ends. 2-63 KVA to 100 KVA |
| 39 | Cartage of dismantled PCC Pole/STP from work site to JE Store (Distance up to 15 KM) including Loading & Unloading at both ends.1-STP Pole |
| 40 | Dismantling of exsisting HT/LT Line by opening the binding at required place and rebinding the wire/conductor etc. as per site requirement to complete the work. |