| 1 | Demoliton/breaking up of drain pipes of 150mm internal dia (salt glazed ware,AC or reinforced concrete) set in cement mortar and takingout off trenches and removing the debris from the site complete all as specified and as directed. |
| 2 | Demoliton/breaking up of drain pipes of 200mm internal dia (salt glazed ware,AC or reinforced concrete) set in cement mortar and takingout off trenches and removing the debris from the site complete all as specified and as directed |
| 3 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sqm on plan and n exc 1.5 m in depth and getting out in hard/dense soil complete all as specified and as directed |
| 4 | All as per items No 3 but depth exc 1.5m and not exc 3 m complete all as specified and as directed |
| 5 | Removing excavated material at a distance exc. 250m but n exc 500 m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. |
| 6 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and as directed |
| 7 | S&F DWC (Double wall corrugated) 150 mm dia pipes manufactured as per IS-16098(part-2) having internal surface smooth and external corrugated surface of SN 4 stiffness laid and jointed complete all as specified and as directed |
| 8 | S&F DWC (Double wall corrugated) 200 mm dia pipes manufactured as per IS-16098(part-2) having internal surface smooth and external corrugated surface of SN 4 stiffness laid and jointed complete all as specified and as directed |
| 9 | S & FCI HublessPipes 100 mm bore single socketed in any lengthincl necessary fittings reqd laid in trenches or in floors including demolition and breaking up existing drain pipes (Salt glazed ware, AC or Reinforced concrete)complete all as specified and directed |
| 10 | M&L for PCC 1:4:8 type D-2 in concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested for internal dia of pipe 100mm complete all as specified and as directed |
| 11 | M&L for PCC 1:4:8 type D-2 in concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested for internal dia of pipe 150 mm complete all as specified and as directed |
| 12 | M&L for PCC 1:4:8 type D-2 in concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested for internal dia of pipe 200mm complete all as specified and as directed |
| 13 | Cutting into existing manholes for connecting new drains, making good to pipe and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) incement concrete 1:2:4 type B1 smooth finished and reforming benching as required for 100/150/200 mm internal dia of pipe complete all as specified and as directed |
| 14 | S&F in repair 110 mm bore PVC (SWR) pipes single socketed, in any length with rubber ring joints, fixed to wall including bend ,Tee, stack clamps etc complete all as specified and directed. |
| 15 | S&F in repair 75 mm bore PVC (SWR) pipes single socketed, in any length with rubber ring joints, fixed to wall including bends,Tee, stack clamps etc complete all as specified and directed. |
| 16 | M&L for Providing factory made cover slab full floor medium duty weight Shape of Square/ rectangular (size 450mm x 900mm) thickness not less than 75mm set in CM 1:6, as in cover slabs (for manhole, drainsetc) with plain fair faces, with angle iron frame all around complete all as specified and as directed |
| 17 | M&L for providing precast reinforced cement concrete type B1 1:2:4 (20 mm graded mechanically crushed stone aggregate) set in CM 1:6, as in cover slabs (for manhole, drainsetc) with plain fair faces, incl demolition of existing reinforced concrete cover slab & frames complete all as specified and as directed |
| 18 | M&L for MS deformed or TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking,bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed)not less than 0.9mm dia or securing with clips complete all as specified and as directed |
| 19 | M&L Brickwork with subclass‘B’ bricks, straight or curved on plan exc 6m mean radius built in CM 1:4 incl demolition of existing brick work built in cement mortor complete all as specified and directed. Note :- All the unhygienic bricks obtained from demolition to be thrown away out of MoD Land. |
| 20 | M&L Brickwork with subclass‘B’ bricks, straight or curved on plan exc 6m mean radius built in CM 1:4 complete all as specified and directed. |
| 21 | M&L plain cement concrete type B1 1:2:4 (20mm graded aggregate) as in benching,copings etc, includingnecessary form work and incl demolitiom of existing complete all as specified and as directed |
| 22 | M&L for PCC type C2, 1:3:6(40mm graded stone aggregate) as in foundation, filling andmass concreteincl demolitiom of existing cement concrete complete all as specified and as directed |
| 23 | M&L for PCC type B-2 , 1:2:4(using 40 mm graded stone aggregates) as in surface channels and drainsincl demolitiom of existing cement concrete complete all as specified and as directed |
| 24 | M&L for 15 mm thick rendering in CM 1:4 on brick or concrete surfaces and finished even and smooth without using extra cement, including providing and making necessaryarrangements for scaffolding etc complete all as specified and as directed |
| 25 | M&L for 15 mm thick rendering in CM 1:4 on brick or concrete surfaces and finished even and smooth without using extra cement,including taking down existing cement plaster and providing and making necessaryarrangements for scaffolding etc complete all as specified and as directed |
| 26 | Rectifying complaints of blockage of bathroom / kitchen / WHB / urinals / WCs etc of any pattern and make it fully functional including removing all sludge. The blockage shall be cleared complete all as specified and as directedNote:-(a) The period of rectifying each complaints is maximum 48 hrs and Rs 100 / each complaint will be charged in case of failure to rectify the complaint in the stipulated period.(b) The contractor shall provide adequate labours and tools to rectify the complaints.(c) The sludge obtained during rectifying the complaints shall be deposited beyond the periphery of defence land. |
| 27 | Rectifying complaints of blockage of manholes of depth not exc 1.00 mtr incl removing all sludge complete all as specified and as directedNote:-(a) The period of rectifying each complaints is maximum 48 hrs and Rs 100 / each complaint will be charged in case of failure to rectify the complaint in the stipulated period.(b) The contractor shall provide adequate labours and tools to rectify the complaints.(c) The sludge obtained during rectifying the complaints shall be deposited beyond the periphery of defence land. |
| 28 | Rectifying complaints of blockage of manholes of depth exc 1.00 mtr but not exc 1.50 mtr incl removing all sludge complete all as specified and as directedNote:-(a) The period of rectifying each complaints is maximum 48 hrs and Rs 100 / each complaint will be charged in case of failure to rectify the complaint in the stipulated period.(b) The contractor shall provide adequate labours and tools to rectify the complaints.(c) The sludge obtained during rectifying the complaints shall be deposited beyond the periphery of defence land. |
| 29 | Rectifying complaints of blockage of sewage lines 100 mm dia of any length & depth and make it fully functional complete all as specified and as directed |
| 30 | Rectifying complaints of blockage of sewage lines 150 mm dia of any length & depth and make it fully functional complete all as specified and as directed |
| 31 | Cleaning of soak well using mechanical pumps diesel driven with fuel, operator and necessary excavation on half buried night soil and disposed off soak well water etc in pits including necessary excavation and earth work for pits for burrying the night soil etc in soft/loose soil complete all as specified and directed. |
| 32 | Cleaning/desludging of existing septic tank of any capacity/sump well of any dia and depth incl taking out sludge in any form and other foreign matter etc viz sediment, sand, ash, grease, fibre, silt, roots orvegetation etc by means of sewage sucking machine or by way of any other suitable means and removing the sludge outside MD land by any suiltable means complete all as specified and directed. Note:The sludge/burried soil etc taken out shall be stacked alongwith the septic tank, sump well etc. After 48 hours of the sludge taken out, measurement shall be taken as of the solid contents for the purpose of payment.The tenderer are advised take up this aspect in mind while quotating the rates. After taking measurements, the solid contents shall be disposed off outside the MD land/area |
| 33 | S&F in repair Vitreous China squatting pan of orissa pattern, size 580x440mm white with CI ‘P’ or ‘S’ trap, front or back inlet and foot rests, any pattern (including fixingofflush pipe) including provision of cement concrete bedding complete all as specified and as directed |
| 34 | S&F in repair Vitreous china wash down water closet pan (pedestal pattern), white, complete including fixing to trap, including PVC seat and cover for pedestal pan complete all as specified and as directed |
| 35 | Demolition of old unsv septic tank filling with earth and provn of Septic tank with excavation in ordinary soil , foundation in PCC (1:2:4) , brick work in CM 1:4, RCC slab cover including RCC precast manhole cover having 6 mm plate embedded all around /fibre reinforced cover with angle iron frame vent shaft and sludge chambers etc, complete for 100 users and make it fully functional complete all as specified and directed |
| 36 | Demolition of old unsv soak well and provn of soak well with excavation in ordinary soil, foundation in PCC 1:3:6, walls of honey combed and solid in M-25 concrete , including intercepting chamber , screen chamber brick work in CM, RCC cover slab in M-25 /RR masonary /Filling with brick bats complete of size 2.40 M dia X 4.50 M deep complete all as specified and as directed |