Competitive E-Bidding For Supply And Installation Of New Continious Centrifugal C.F.W. Machine For Bisalpur Kisan Sahkari Chini Mills ., Ltd., Bisalpur ( Pilibhit ) For The Season 2025-26 , Heading , Complete Supply, Errection & Commissioning Ofnew Wk 1500/30°Continuous Centrifugal Machine Wil Makefor C Massccuite Curing Complete With Ss Basket . 150 Hp X 1460 Rpm Drive Motor Control Panel With Push Button Station, Discharge Chute , Pulp Valve Feed Unit With S.S. Acceleration Cup, Cable Between Control Panel To Motor & Push Button Station And One Set Of Special Tools ,Exceptingbasket All Other Components Machine Are Inmild Steel Construction, One Set Of Nickle Screen (2) Staging And Structure Suitable Forone No 1500/30° Continuouscentrifugal Machine . Make –Walchand Nagar Make , Model –Wk 1500, Basket Angle -30° And Required Electrical Cable From Motor To Pannel & The Structure & Stagingmaterial. , Technical Specification—Model-Wk-1500, Inside Dia Meter Of Basket—1500 Mm. Basket Cone Angle(Degree)—30, Basketspeed (Rpm)—1500 To 1700. Installed Drive Motor (Kw)—110, Effecting Screening Surface Area (Cm²)—21500, Centre Distance (Mm) –2700, Curing Capacity Of Machine For ‘C’Massecuite –18 To 22 Ton/Hr., Affination Magma For ‘C’ Curing –20 To 25 Tph. Technical Features As Follows. , Uniquetly Adjusted Center Of Gravity Of The Machine For Excellent Machine Stability , Basket – (I) One Piece Duplex Stainless Steel Basket Intergral With Basket Support(Ii) Precisemachine Of Basket ,Shaft And Its Related Parts Ensuring The Smooth Run And Longer Machine Life. (Iii) 100% Radiography Of Welding Jointsand Casting To Give Additional Safetyto The Machine . , Bearinghousing –(I) High Tensile Forged Steel Shaft (Ii) Compact Design Of Bearing Housing With Arnple Capacityof Bearing , Lubrication –Having The Provision For Oil Lubrication , Feed Controls –(I) Having Central Feed & Acceleration System Foreven Distribution Of Massecuite (Ii)Automatic Feed Control Systemgoverned By Motor Load For Optimum Loading Of Machine All The Time. , Buffers – (I) Havingexcellent Four Point External Vibration Isolatorsbelow Idea Foot Printsto Monitor Casing , Errection & Commissioning Will Be In Scope Of Suppliers , Free Of Cost Boarding & Lodging Will Be Provided For Errection & Commissioning . Team Engineer & Supervisorsonly. , Supplier Willprovide The All Detailed Drawingreleated To Machinery Part, Foundation Structures Staging Etc. , Supplier Will Provide The Approval Of Drawing Related To Foundation Staging & Structure. , Supplier Will Provide The All Necessarycertificate Related To Machine
|