Tender For Ward-90 Khatta Road, In Naeem Bus Wali Gali, From SharifS House To FarooqS House, From Shaukat To Jan Alam And From Abid To AkhtarS House, Drain And C.C. Work - Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work SI no.273. 2 M-150 brick work in 1:4one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the workS.I No.305 a 3 12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. SI No.584 (A) 4 Cement Concrete with 2.0 cm. gaug;e Approved stone grid coarse sand & cement in the proportion of 4:2:1 including , T&P etc. S.I. 279 (a) 5 RCC 1:1.5:3 in cement coarse sand and grit 2 cm. gauge. As SI 284 A 6 Mild steel or iron such as in plane reinforcement concrete. 7 S/ laying and 53mm to 22.4mm size stone aggregate. 8 Laying spreading and consolidation of 12 cm (loose) thick coat of stone ballast but excluding roller charge As per SI no755 b 9 Construction ofwithout double bar expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1½:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer ofless then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant,dowel bars, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and also including complete shifting of matrials & Concrete etc.(M-20)but when thikness of CC is less then 20 cm. (without dowel Bar) 10 Trimix for C.C. road etc.including hire & fuel charges of concrete floter + all comp.of work 11 Providing& appling concrete hardner on C.C. roadtop surfaceetc all comp.of work 12 Providing and filling in position rubbererized bitumen hot sealing compound for sealing of expansion joint in road /pavement including Groov cutting as per norms etc All as per direction of ingineer in charge 13 S/F sign board+ All comp etc
|