Tender For Proposed Construction Of Anjaneyar Sannathi; 2 Earth work excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including infinal leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth within the godown or inside compound in places shown with initial leads and lifts, clearing and levelling the site, shoring strutting baling of water wherever necessary etc., complete complying with standard specification. (Resolution No.5) 3 Supplying and filling in foundation and basement with filling sand in layers of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supplying filling sand. 4 Lime concrete 1:2:5 (One of Lime Two of sand and five of HBG jelly) for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in respects complying with relevant Std, Specification and as directed by the Department Officers. 5 Random Rubble masonry work in Lime mortar 1:2 ( One of Lime and Two of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respectscomplying with relevant standard Specifications.The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works 6 Supply of cut stone block of length carrying out garpagraham,Arthamandapam,MahaMandapam,Thirumathil and other temple structures upto 1x1x5 lengthetc., complete with standard specification. 7 Supply of cut stone block of length carrying out Arthamandapam,Maha Mandapam pillar, uithiram and pavukkal other temple structures 1 1/2 x1 1/2x10 etc., complete with standard specification. 8 Labour charges for cut stone Dressing and Fixing of Chitra Vanamexcluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 9 Labour charges for cut stone Dressing and Fixing of Ubapeedam, padamexcluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 10 Labour charges for cut stone Dressing and Fixing of Jagathiexcluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 11 Labour charges for cut stone Dressing and Fixing of Kumuthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 12 Labour charges for cut stone Dressing and Fixing of Kandam pattial excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 13 Labour charges for cut stone Dressing and Fixing of Aswapatham,Stambam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 14 Labour charges for cut stone Dressing and Fixing of Kal vari,Kalasam,Thadi excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 15 Labour charges for cut stone Dressing and Fixing of Kudam,Palagai excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 16 Labour charges for cut stone Dressing and Fixing of Pristharam-Uthiram,kambu,Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 17 Labour charges for cut stone Dressing and Fixing of Kabotha vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 18 Labour charges for cut stone Dressing and Fixing of Vyalavari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 19 Labour charges for cut stone Dressing and Fixing of Nasi thalai excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 20 Labour charges for cut stone Dressing and Fixing of Thoon excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 21 Labour charges for cut stone Dressing and Fixing of Valaipoo Bothiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 22 Labour charges for cut stone Dressing and Fixing of Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 23 Labour charges for cut stone Dressing and Fixing of Nilakal(Nagapamdam,poo,kodi kerukku)excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., 24 Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. 25 Stone pavukkal above the Brick Terrace flooring with weathering course with brick on edge with Terrace Bricks for Heritage works of sizeTerrace Brick 15x7.5x2.5cm (Sl.No.10-c p.no.14) 75mm thick brick jelly concrete in lime mortar and Lime Mortar pointing1:1.5 - 10 m2. 26 Flooring with cut stoneslab 60cm x 60cm and other sizes suitable for site requirement not less than 10cmthick with machine cut edges and top surface dressed as directed by the department officers including cost and conveyance of all materials to site and labour charges for pavingetc.,complete as per standard specification. 27 Pointing the cut stone joints with Lime mortar 1:1.5(One lime and one and half sand), 20mm deep including cost of special tiles such brush and watering, curing etc., complete as per standard specifications. 28 Brick work in following Lime Mortar 1:1.5 (One Lime and two sand) using best quality III Countryburnt bricks of size 83/4 x 4-1/4 x 2-1/4 for foundation and basement including curing, etc., complete complying with standard specifiction.For foundation 29 Plastering with Lime mortar 1:1.5, (One Lime and two sand)12 mm thick including cost and conveyance of all materials & all labour charges including cement which will be purchased by the contractor in his own cost as per ISI and good etc., complete as per standard specification. 30 Painting two coats with approved water based exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curingin all floors including brushes etc., complete as per specification. 31 Scaffolding charges for Vimanans andgopurams with casurina posts coconut or plamtrees wherever necessaryfor main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work -1 sqm.up to 1500 32 Brick masonry in Lime mortar 1:2, using best quality wire cut brick Heritage works size 9 x 4 x 2 including all vaarivargams, moulds, sthambams, mukhapathramsa, koodu, nasi and all ornamental birck work complete, all pancharams, agarais, karnrakoodus, etc., forming core wlls of Rajagopurams/vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required hts curing and all extra for working in hts etc., complete – 100cft. 33 Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1:5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plasteringwith Lime Mortor1:1:5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area.for Vimanams. 34 Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor1:1:5 finishing the same with Lime Mortor1:1:5bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing Lime Mortor Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as Lime Mortor broken bricks, and copper rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including Panchavarnam 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is ptrovided the rate with peetam may be adopted as datailed hereunder) The lime used should be sourced fromwhich is highly iron fortified and suitable for structural and masonry works. 35 Painting with multicolour (Panchavarnam)good water based exterior emulsionpaints complete for the Vinamans/Gopurams, including costand conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc,complete-which including all extra for foldings-100sft, superficial area. 36 Temple pattern Ornamental Doors with high quality teak wood with kamalam ,creeper,Birds,animal figures,sculptures etc., Back side asper size blank including necessary carving,shaping,wastage etc., asper approval plan and desing etc, complete. 37 Sub total 38 GST 18% on Sub Total
|