Work Related To Uninterrupted Power Supply Of Damaged Electricity Lines Due To Natural Disaster In The Jurisdiction Of Edd-Iglas. - Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 2 PCC poles 8.5 Mtr./ST poles 11 Mtr. 3 PCC poles 9 Mtr. 4 Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 5 Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 6 PCC poles 8.5 Mtr./ST poles 11 Mtr. 7 PCC poles 9 Mtr. 8 33 KV line double pole 9 Dismentling of old and damaged pole after dismentling of all accessories. 10 11 KV line double pole 11 11 KV line single pole. 12 33 KV line double pole 13 33 KV line single pole. 14 Erection of double pole on PCC/ST pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 15 Laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. 16 ACSR Weasal Conductor. 17 ACSR Dog/Raccon Conductor. 18 LT 3x95+1x70+1x16 bunch conductor 19 Retighting of stay complete with nozelling & binding including cost of labour T&P etc required for proper completion of work. 20 Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work 21 ACSR Weasal Conductor. 22 ACSR Dog/Raccon Conductor. 23 LT 3X50+1X35+1X16 Sq. mm. bunch conductor. 24 LT 3X95+1X70+1X16 Sq.mm. bunch conductor. 25 LT 3X120+1X95+1X16 Sq.mm. bunch conductor. 26 Straightening of tilted pole at various places as per direction of JE. 27 PCC poles 8.5 Mtr./9Mtr./ST poles 11 Mtr. 28 Replacement of following damaged accessories:- 29 11 KV Disc Insulator 30 11 KV Pin Insulator 31 11 KV V-type Cross Arm 32 33 KV Disc Insulator 33 33 KV Pin Insulator 34 33 KV V-type Cross Arm 35 F-Bracket 36 Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel. as per specification of UPPCL construction manual including including loading and unloading at the both ends. 37 Grouting of following poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size as per RESPO norms. This qty also includes the additional work of old & existing LT line which has to be converted into HT line. Presently the supports of old line do not have grouting. 38 PCC poles 8.5 Mtr/9Mtr./ST pole 11 Mtr. 39 Chopping of tree branches which are touching to 11 KV/LT lines. 40 Demounting & installation of following capacity transformer due to damage of PCC/ST poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. 41 10/16 KVA T/F 42 25 KVA T/F 43 63 KVA T/F 44 Providing & fixing clamps for supporting various type accessories such ascross arm, F-clamps etc. 45 Guarding of old 11 KV line damaged due to storm by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. 46 Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work. 47 (a) Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. 48 (b)Providing and fixing of stay insulator. 49 Erection of section Tee pole including fixing of all fittings as per RESPO norms.
|