Tender for Special Repair Of Sasni Iglas Road - Part-A (Bituminous Work)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. As per Morth Specification Sr No. 4.9, 404 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) 2 Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as morth specification no 503.(Including cost of Bitumen VG-10)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) 3 Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregatesusing Viscocity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller, finished to required level and grades Complete. as morth specification no 510.(Including cost of Bitumen VG-10)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) 4 Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade. (Including cost of Bitumen VG-10)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) 5 Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) 6 Part-B (CC Work)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. As per Morth Specification Sr No. 4.9, 404 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) 7 CEMENT CONCRETE PAVEMENT(C.C ROAD)Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. Ch-20, S.I. 20 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) 8 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2Carted earth 5 km.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) 9 Supply, laying & fixing of N.P.-3 Hume Pipe 600mm Dia. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) 10 Part-A(Bituminous Work)05 Year Maintenance Charge @ 15%)Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)1-1st Year @ Nill 11 2nd Year @ 1.50% 12 3rd Year @ 3.00% 13 4th Year @ 4.50% 14 5th Year @ 6.00% 15 Part-B (CC Work) 05 Year Maintenance Charge @ 2.50%Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)1-1st Year @ Nill 16 2nd Year @ 0.25% 17 3rd Year @ 0.50% 18 4th Year @ 0.75% 19 5th Year @ 1.00%