}

Tender For Turnkey Job Of Refrigeration Plant For Navy Vessels (Rm.0788 & Rm.0789), Kochi-Kerala

Cochin Shipyard Limited has published Tender For Turnkey Job Of Refrigeration Plant For Navy Vessels (Rm.0788 & Rm.0789). Submission Date for this Tender is 18-06-2024. Pump Supply Tenders in Kochi Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

43560703
Corrigendum : Tender For Turnkey Job Of Refrigeration Plant For Navy Vessels (Rm.0788 & Rm.0789)
Tender
Indian
Kerala
Kochi
18-06-2024

Tender Details

Tender For Turnkey Job Of Refrigeration Plant For Navy Vessels (Rm.0788 & Rm.0789); 1 Scope 1 - TURNKEY JOB OF REFRIGERATION PLANT for Navy Vessel 1 (RM.0788) 2 REFRIGERATION PLANT (700 KCAL/HR)ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY 3 CARRY OUT MAJOR OVERHAUL OF REFRIGERATION PLANTS WITHASSOCIATED COMPRESSORS (Service cost) 4 CARRY OUT MAJOR OVERHAUL OF REFRIGERATION PLANTS WITHASSOCIATED COMPRESSORS(Material cost) 5 RENEW BATTONING, DOOR, INTERNAL PANELS AND LAGGING OF REF PLANT UNIT (Service cost) 6 RENEW BATTONING, DOOR, INTERNAL PANELS AND LAGGING OF REF PLANT UNIT (Material cost) 7 RENEW & CALIBRATE THE EXPANSION VALVE. (Service cost) 8 RENEW & CALIBRATE THE EXPANSION VALVE. (Material cost) 9 RENEW SV MOUNTS. (Service cost) 10 RENEW SV MOUNTS. (Material cost) 11 RENEW ALL SYSTEM VALVES UNDERTAKE TRIAL (Service cost) 12 RENEW ALL SYSTEM VALVES UNDERTAKE TRIAL (Material cost) 13 CARRY OUT OVERHAUL OF 50% SYSTEM VALVES. RENEW BALANCE 50% (Service cost) 14 CARRY OUT OVERHAUL OF 50% SYSTEM VALVES. RENEW BALANCE 50% (Material cost) 15 WHEN THE SYSTEM HAS BEEN ASSEMBLED AFTER REPAIRS/ OVERHAUL CARRY OUT BLOWING THROUGH OF GAS SIDE WITH DRY NITROGEN. THEREAFTER PRESSURE TEST WITH DRY NITROGEN AT 30 KG/CM2 G PRESSURE FOR 6 HOURS. ON COMPLETION OF PRESSURE TEST, SYSTEM IS TO BE DEHYDRATED BY VACUUM PUMP. THEREAFTER CARRY OUT VACUUM TEST FOR 24 HOURS. AND THEREAFTER UNDERTAKE COMPREHENSIVE SYSTEM PERFORMANCE CHECKS AND RECORD PARAMETERS. (Service cost) 16 WHEN THE SYSTEM HAS BEEN ASSEMBLED AFTER REPAIRS/ OVERHAUL CARRY OUT BLOWING THROUGH OF GAS SIDE WITH DRY NITROGEN. THEREAFTER PRESSURE TEST WITH DRY NITROGEN AT 30 KG/CM2 G PRESSURE FOR 6 HOURS. ON COMPLETION OF PRESSURE TEST, SYSTEM IS TO BE DEHYDRATED BY VACUUM PUMP. THEREAFTER CARRY OUT VACUUM TEST FOR 24 HOURS. AND THEREAFTER UNDERTAKE COMPREHENSIVE SYSTEM PERFORMANCE CHECKS AND RECORD PARAMETERS. (Material cost) 17 Scope 2 - TURNKEY JOB OF REFRIGERATION PLANT for Navy Vessel 2(RM.0789) 18 CARRY OUT MAJOR OVERHAUL OF REFRIGERATION PLANTS WITHASSOCIATED COMPRESSORS, CONTROLS AND CUTOUTS AS FOLLOWS:- (Service cost) 19 CARRY OUT MAJOR OVERHAUL OF REFRIGERATION PLANTS WITHASSOCIATED COMPRESSORS, CONTROLS AND CUTOUTS AS FOLLOWS:- (Material cost) 20 RENEW BATTONING, DOOR, INTERNAL PANELS AND LAGGING OF REF PLANT UNIT (Service cost) 21 RENEW BATTONING, DOOR, INTERNAL PANELS AND LAGGING OF REF PLANT UNIT (Material cost) 22 RENEW & CALIBRATE THE EXPANSION VALVE. (Service cost) 23 RENEW & CALIBRATE THE EXPANSION VALVE. (Material cost) 24 REPLACE (WITH NEW) SV MOUNTS. (Service cost) 25 REPLACE (WITH NEW) SV MOUNTS. (Material cost) 26 REPLACE (WITH NEW) ALL SYSTEM VALVES UNDERTAKE TRIAL (Service cost) 27 REPLACE (WITH NEW) ALL SYSTEM VALVES UNDERTAKE TRIAL (Material cost) 28 CARRY OUT OVERHAUL OF 50% SYSTEM VALVES. REPLACE (WITH NEW) BALANCE 50% (Service cost) 29 CARRY OUT OVERHAUL OF 50% SYSTEM VALVES. REPLACE (WITH NEW) BALANCE 50% (Material cost) 30 WHEN THE SYSTEM HAS BEEN ASSEMBLED AFTER REPAIRS/ OVERHAUL CARRY OUT BLOWING THROUGH OF GAS SIDE WITH DRY NITROGEN. THEREAFTER PRESSURE TEST WITH DRY NITROGEN AT 30 KG/CM2 G PRESSURE FOR 6 HOURS. ON COMPLETION OF PRESSURE TEST, SYSTEM IS TO BE DEHYDRATED BY VACUUM PUMP. THEREAFTER CARRY OUT VACUUM TEST FOR 24 HOURS. AND THEREAFTER UNDERTAKE COMPREHENSIVE SYSTEM PERFORMANCE CHECKS AND RECORD PARAMETERS. (Service cost) 31 WHEN THE SYSTEM HAS BEEN ASSEMBLED AFTER REPAIRS/ OVERHAUL CARRY OUT BLOWING THROUGH OF GAS SIDE WITH DRY NITROGEN. THEREAFTER PRESSURE TEST WITH DRY NITROGEN AT 30 KG/CM2 G PRESSURE FOR 6 HOURS. ON COMPLETION OF PRESSURE TEST, SYSTEM IS TO BE DEHYDRATED BY VACUUM PUMP. THEREAFTER CARRY OUT VACUUM TEST FOR 24 HOURS. AND THEREAFTER UNDERTAKE COMPREHENSIVE SYSTEM PERFORMANCE CHECKS AND RECORD PARAMETERS. (Material cost)

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 13-06-2024 Date Corrigendum Date 18-06-2024

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail