Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Electrification Of New Nagar Panchayat Hetimpur. Submission Date for this Tender is 03-04-2023. Electrification Work Tenders in Deoria Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | PART-A- MATERIAL |
2 | 11 KV VCB 200/100/5 Outgoing |
3 | 11 KV XLPE Cable 3x300 sqmm |
4 | 11 KV Jointing Kit Indoor 300 sqmm |
5 | 11 KV Jointing Kit Outdoor 300 sqmm |
6 | PCC Pole 8.5 mtr Long |
7 | S.T. Pole – 11 Mtr. Long |
8 | Stone Pad |
9 | 11 KV Polymer Pin Insulator with Pin Complete |
10 | ACSR Weasel Conductor. |
11 | 11 KV Polymer Disc Insulator with fitting |
12 | Disc insulator 45 KN T&C type |
13 | TOP Channel with clamp 2240 mm |
14 | PG Clamp |
15 | Gaurding X Arm with clamp |
16 | MS Earthing Rod 20x2500 mm² |
17 | M.S. Channel (T- Off) |
18 | Clamps With Nut Bolt For M.S. Channel (T- Off/Top/Dropper) |
19 | F Bracket with nut bolt |
20 | GI wire for gaurding |
21 | MS Angle iron 65x65x6, 2700 mm long bracing with four clamp |
22 | GI Barbed wire |
23 | V Type X Arm clamp with nut bolt |
24 | Eye Bolt For Guard wire |
25 | Danger Board with clamp and nut bolt |
26 | Aluminum paint |
27 | Red oxide paint |
28 | Stay Rod (16 x 1800) sqmm |
29 | Stay Wire |
30 | Number plate |
31 | PART-B- WORKGrouting of Pole |
32 | Earthing of Pole |
33 | Installation of 11 mtr S.T. Pole with Grouting |
34 | Installation of 8.5 mtr Pcc Pole with Grouting |
35 | Erection ofDouble pole structure For 11 KV overhead on 11 mtr. STPole including all works of exvcation of pit,pole erection, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast),back filling of earth ,proper ramming & fitting of all accessoriesThe work includescarriage & handling of all materials from site store to pit site. |
36 | Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, The work includes supply, carriage & Handling of stay from site store to pit site. |
37 | Installtion of Danger Board with All respect and Barbed wire. |
38 | Painting of STP Aliminium Paint & Raid Oxide |
39 | Cable Laying |
40 | Installtion of all respect outgoing VCB |
41 | ErectionofSingle pole structure For 11 KV overhead line on11.0 mtr. (SP-55) Pole/8-50 Mtr PCC Poleincluding all works ofexcavation of pit, pole erection,grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast)back filling of earth,proper ramming & fitting of allaccessories (M.S. angle iron bracing with clamps, top channel with clamps, disc isulator B & S type, disc fitting B & S type,composite polymar pin, insulator, P.G. Clamp, "E" bracket, danger board with clamp,barbed wire earthing, etc. complete) The work includes carriage & handling of all materials from site store to pit site. |
42 | Guarding between two poles like single poles, double poles, four poles, etc. to guard 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, including supply, cutting, fabrication and fixing of guarding channel 75x40x3010 mm with clamps nut & bolts etx, as per drawing. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail