Urban Local Bodies has published Repairing Work Of Tally Pilling Of Pond And Concrete Road By The Side Of Road Beside The House Of Gobinda Bera At Paranchak Under Ward No. 14 Within Haldia Municipality. Submission Date for this Tender is 07-04-2023. RCC Road Tenders in haldia West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Item No. 1 / Page No. -4/8 Pumping out water from ponds or tanks |
2 | Item No. 2 / Page No. - 1/2 (a) Earth work in excavation in foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1500 mm. |
3 | Item No.3 / Page No. - 14/1 Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
4 | Item No. 4 / Page No. - 26/10 (Analysis rate) Ordinary Cement Concrete (mix 1:2.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevent is codes a) pakur variety |
5 | Item No. 5 / P - 242/4.04 ( Analysis rate ) Supplying, spreading & consolidating moorum to a depth of 75 mm at desired density & C.B.R. as per specification camber including watering as necessary, lighting, guarding barricading & making earthen bundh where necessary to protect the edge & curing with water for 2 to 3 days, mending cracks by rolling where necessary complete as per specification. (The payment is to made on the basis of the finished compacted volume of moorum) |
6 | Item No.6 / Page No. - 42/36 Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fittings, fixing and striking out after completion of works. ( upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height. shall be taken as 4 m and extra for woks beyond the initial 4 m. ht. shall be allowed under 12(e) for every 4 m or part thereof. ) f) 25 mm to 30 mm shuttering without staging in foundation. |
7 | Item No. 7 / Page No. - 47/3 Supplying & laying polythene sheet ( 150 gm. / SqM.) over the layer of compacted moorum at starched condition. |
8 | Item No. 8 / Page No. - 43/40 (ii) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. SHYAM / SRMB |
9 | Item No. 9 / Analysis rate Supplying & Laying of Vertically laid (275 mm) Raniganj pattern liles along the sides of pond. Joining adjustment liles with semi liquid mud, complete in all respect inclusing the cost of all materials, labour & other incidental charges as per direction of EIC |
10 | Item No. 10 / P - 24/4 Ordinary Cement concrete ( mix 1:2:4) with graded stone chips ( 20 mm nominal size ) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes. a) Pakur Variety |
11 | Item No. 11 / Page No. - 1/3 Earth work in filling in foundation trenches or plinth with good earth. in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete. ( Payment to be made on basis of measurement of fiinished quantity of work ) a) With earth obtained from excavation of foundation. |
12 | Item No. 12 / Page No. - 2/5 Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. ( Payment will be made on profile measurement before and after the work )(a) With earth obtained by fresh excavation upto 1800 mm. depth (including the cost of excavation from land arranged by the Deptt. within a lead of 100 m.) |
13 | GST Item (Effect from 01.11.2017) 18 % GST on Estimated Cost of Sl No- 1 to 12 |
14 | Labour Welfare Cess Item (Effect from 01.11.2017) 1% Labour Welfare Cess on Estmated Cost of Sl No -1 to 13 |