Aurangabad Municipal Corporation has published Tender For Maintenance And Repair Works Of Water Supply Pipe Line At Ward No 103- Vedanthnagar, Bansilal Nagar And Ward No 104- Banewadi Jalannagar In Zone No 9. Submission Date for this Tender is 14-12-2022. Pipe Laying Tenders in aurangabad Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Excavation for foundation / pipe trenches in earth, soils of all types, sand gravel and soft murum, including removing the excavated material upto a distance of 50 metres and liftsas below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc comp. Lift 0 to 1.50 MMJP/SSR/2021-22/Page no.42 I.No. 1 |
2 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and speading the bed for foundation and excluding backfilling, etc comp. Lift 0 to 1.50 M MJP/SSR/2021-22/Page no.42 I.No. 5 |
3 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road by all means including removing the excavated material upto a distance of 50 meters and lifts as below, tacking and spreding as directed normal dewatering, preparing the bed for foundation and excludingback filling, etc comp. Lift 0 to 1.50 M MJP/SSR/2021-22/Page no.42 I.No. 5 |
4 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc comp. Lift 0 to 1.50 M MJP/SSR/2021-22/Page no.43 I.No. 7 |
5 | Providing and Supplying Asbestos Cement Pressure Pipes manufactured and tested as per ISO-160 standard of following class and diameter in standard lengths including cost of all taxes (Central and local), insurance, railway freight, inspection charges, unloading from railway wagon, loading into truck, transporting to departmental store/site, unloading, stacking etc. completeMJP/DSR/2012-2013/Page no. 57. I.no. 1 |
6 | A) Class 15 ( Test Pressure 1.5 Mpa) |
7 | 80mm |
8 | 100mm |
9 | 150mm |
10 | 200 mm |
11 | 250mm |
12 | 300 mm |
13 | Lowering, laying and jointingwith CID joints, A.C. pressure pipes and CI or MS specials of following class and diameters including conveyance from stores to site of works, cost of labour and material, giving satisfactory hydraulic testing, etc. as per ISI code, etc. complete but excluding cost of C.I.D. joints, nut bolts, rubber rings. MJP/DSR/2012-2013/P.No.59I.no. 4 (A) |
14 | A) Class 15 ( Test Pressure 1.5 Mpa) |
15 | 80mm |
16 | 100mm |
17 | 150mm |
18 | 200 mm |
19 | 250mm |
20 | 300 mm |
21 | Cutting and champhering of pipes of following diameters including cost of all materials and labour involved. Etc. complete as directed by eEngineer-in-charge. (for all class of pipes)MJP/SSR/2021-22/Page no.141 I.No. 20 |
22 | 100 mm |
23 | 150mm |
24 | 200 mm |
25 | 250 mm |
26 | 300 mm |
27 | Providing and supplying C.I.detachable joints suitable for A.C. pressure pipes manufactured as per IS- 1538 / 1993 standards of following class and diameter including cost o insurance, railway freight, wagon loading into truck, transproting to deparmental store, unloading, stacking and cost of rubber rings, nut bolts, excluding GST levied by GOI & GOM in all respect etc. complete.MJP/SSR/2021-22/Page no.75 I.No. 13 |
28 | 80 mm |
29 | 100 mm |
30 | 150 mm |
31 | 200 mm |
32 | 250 mm |
33 | 300 mm |
34 | Providing and supplyingI.S.I. mark rubber gasket suitable for C.I. or D.I. pipe of all class for tyton joints including inspection charges, transportation upto departmental stores excluding GST levied by GOI & GOM in all respect etc. complete. MJP/SSR/2021-22/Page no.142 I.No.21(A) |
35 | 100 mm |
36 | 150 mm |
37 | 200 mm |
38 | Checking and Repairing Private water connection and reconnecting the same etc. complete |
39 | Disconnection unauthorised private water connection etc. complete |
40 | Making cross connection to existing distribution main of any type including excavation, breaking and removing existing pipes, lowering, laying of specials and pipes in their position, refilling, closing the water supply in that area, dewatering and restarting the water supply, etc. complete as directed by Engineer-in-charge for following diameters of existing pipeline, irrespective of diameter of branch line. ( The number of joints involved will be paid separately depending upon the nature of joints and required pipes, valves and specials will be supplied free of cost at stores) MJP/SSR/2021-22/Page no.60 I.No. 10 |
41 | 100 mm |
42 | 150 mm |
43 | 200 mm |
44 | Providing double flanged Sluice Valves confirming to IS- 2906 / 14846 including worm gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete.PN-1.0 ( without bypass arrangement)MJP/SSR/2021-22/Page no.132 I.No. 2(A) |
45 | 80mm |
46 | 100mm |
47 | 150mm |
48 | 200mm |
49 | Lowering laying and jointing in position following C.I. D/F Reflux Valves, Butterfly Valves and Sluice Valves including cost of all labour, jointing material, including nut bolts and giving satisfactory hydraulic testing, etc complete. (Sluice Valves)MJP/SSR/2021-22/Page no.135 I.No. 4 |
50 | 80mm |
51 | 100mm |
52 | 150mm |
53 | 200mm |
54 | Removing existing cross connection and remaking the same etc comp |
55 | 100mm |
56 | 150mm |
57 | 200mm |
58 | Removing and refixing the half body of sluice valve including excavation, refilling, cost of rubber packing, nut bolts, with gate, gland rope, repair by welding etc complete (70 % Rate of laying Sluice valve) MJP/SSR/2021-22/Page no.135 I.No. 4 |
59 | 80 mm |
60 | 100 mm |
61 | 150 mm |
62 | 200 mm |
63 | 250mm |
64 | 300mm |
65 | Providing and suplying S.S. spindle rod as per standard specificatioin and suitable for sluice valves etc complete. (As Per Market Rate) |
66 | 80 mm |
67 | 100 mm |
68 | 150 mm |
69 | 200 mm |
70 | Providing and supplying Gun metal check nut of following diameter of sluice valves as per standard specification, etc. complete. |
71 | 80 mm |
72 | 100 mm |
73 | 150 mm |
74 | 200 mm |
75 | 250mm |
76 | 300mm |
77 | Repair the gate by welding to make it in original position etc comp. (As per market Rate) |
78 | 100 mm |
79 | 150 mm |
80 | 200 mm |
81 | Providing and supplying M.S. extension rod as per site requirment to fix above existing sluice valve as directed by engineer in charge. etc Complete |
82 | 100 mm |
83 | 150 mm |
84 | 200 mm |
85 | Providing and supplying M.S. clamp for pipes of following diameter etc Complete(As per Market Rate) |
86 | 80 mm |
87 | 100 mm |
88 | 150 mm |
89 | 200 mm |
90 | 250 mm |
91 | 300 mm |
92 | Wash out end cap of existing line including excavation refilling nut bolts etc comp |
93 | 80 mm to 200 mm |
94 | Providing and supplying ISI standard CI flanged / S& S specials including all statutory duties & taxes such as GST levied by GOI & GOM in all respect, railway freight, insurance, unloading from railway wagon, loading into truck transport to departmental store /site, unloading stacking etc. complete. MJP/SSR/2021-22/Page no.72 I.No. 6(C) |
95 | Dewatering the excavated trenches and pools of water in the pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinedry, labour, fuel), etc. complete. MJP/SSR/2021-22/Page no.45 I.No. 14 |
96 | Providing & laying in situ cement concrete M-15/1:2:4 of trap/granite/ quartzite/ gnessmetal for foundation and bedding including dewatering, compacting and curing etc. complete. MJP/SSR/2021-22/Page no.49 I.No. 1 |
97 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc.complete.MJP/SSR/2021-22/Page no.45 I.no.15 |