Tender For Upgradation Of Ht Ld System In Industrial Focal Point At Moga Under Iid Scheme, Moga-Punjab

Department Of Industries And Commerce has published Tender For Upgradation Of Ht Ld System In Industrial Focal Point At Moga Under Iid Scheme. Submission Date for this Tender is 09-03-2023. Overhead Line Tenders in Moga Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

35050409
Corrigendum : Tender For Upgradation Of Ht Ld System In Industrial Focal Point At Moga Under Iid Scheme
Open Tender
Indian
Punjab
Moga
09-03-2023

Tender Details

Upgradation Of Ht Ld System In Industrial Focal Point At Moga Under Iid Scheme

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 14-Dec-2022 Corrigendumext Date 23-12-2022
2 23-Dec-2022 Corrigendumext01 Date 05-01-2023
3 05-Jan-2023 Corrignedum02 Date 12-01-2023
4 12-Jan-2023 Corrigendumext001 Date 24-01-2023
5 24-Jan-2023 Corrigendumext0001 Date 07-02-2023
6 07-Feb-2023 Corrignedum003 Date 21-02-2023
7 21-Feb-2023 Corrigendum001 Date 28-02-2023
8 28-Feb-2023 Corrigendum Date 09-03-2023

Key Value

Document Fees
INR 11800 /-
EMD
INR 173000.0 /-
Tender Value
INR 86.95 Lakhs /-

BOQ Items

Name of Work: UPGRADATION OF HT/LD SYSTEM IN INDUSTRIAL FOCAL POINT MOGA UNDER IID SCHEME
Sl. No. Item Description
1Supply, laying and erection of aluminium conductor XLPE insulated PVC sheathed Un-armoured and served cable 1100 volts grade as per IS 7098 (Part-1)1988 to be laid loose in the existing trench or pipe as per PWD General Specifications:-
2Overall size 150sq.mm (3½ Core) anarmoured (Loose)
3Earthing with G.I. wire/ rope in G.I. pipe partly recessed and partly on surface complete with 150cm long 50mm dia. G.I. earth pipe (Cutting threads and 36 Nos. holes, 1cm dia. to make a mesh around the GI Pipe) with G.I. reducing socket including erection of the same, 4.50 metre (14.76 feet) below ground level with 20Kg. charcoal & salt mixture etc., up to 8 metre in length (includingboring & refilling).
4Earthing with 7/14 S.W.G. (7/2.18mm dia.) G.I. rope in 20mm dia G.I. pipe with G.I. reducing socket 50mm x 20mm (upto 8Metre in length)
5PCC Poles
6Supply and erection of pre-stressed cement concrete pole of suitable length with a given planting depth confirming to IS-1678/ 1960/1978 below ground level in excavated pit of suitable dimensions complete in all respect as approved by the Engineer-in-Charge:-
7PCC Pole Overall Length 11 metre, Planting depth 1.80 metre, W/L 400 kg
8Supply stringing and sagging of aluminium conductor steel reinforced (ACSR) on poles including binding with insulators using aluminium wires complete as desired by the Engineer in charge of the site:-
9ACSR-RABIT conductor (50 sq. mm) Size (6/3.35 Al.+1/3.35mm GI)
10Supply and erection of insulators confirming to IS-2544 & 5350 (Test Certificates of CPRI) includes supply and erection of nuts bolts and other accessories whatsoever required at site for fixing it to the structure pole. The job is to be completed as approved by Engineer-in-charge:-
1111kV Pin Insulator with G.I. Pin
12STAY SETS:
13Supply and erection of Stay Set consisiting of 19/20mm dia.of suitable length G.I. stay rod duly threaded upto 300mm at one end and shaped on the other end. MS plate size 30cm x 30cm x 6mm with 20mm dia. hole drilled in the centre of the plate G.I. stay wire size 7/10 SWG, G.I. thimble for stay binding,Egg/Strain insulator, MS elbow made out of 16mm plain sheet and a 20cm long piece of 50mm x 50mm x 6mm angle iron made to the shape as approved by Engineer-in-charge. Stay set complete shall be fixed to the pole by providing suitable size full clamps made out 50mm x 6mm size MS flat with required number of nut and bolts 16mm dia. on one end and shall be embedded on the other end. The stay plate shall be covered with cement concrete having total volume of the concrete not less that 0.042Cum. The job shall include excavation of pit and back filling and after pouring concrete with excavated soil etc. as approved/desired by the Engineer-in -charge.
14Stay Set consisiting of 19/20mm dia., 2.4 metre Long G.I. Stay Rod
15Supply & laying of Circular Aluminium Conductor screened with extruded semiconducting compound, XLPE insulated, insulation screened with extruded semiconducting combination in combination with copper tape (0.3KA for 1sec.) cores laid up, FR PVC inner sheathed, galvanized steel strip armoured and overall FR PVC sheathed cable confirming to IS:7098 (Part-2), 2011 working voltage 11KV(E) grade to be laid loose in the existing trench or pipe:-
16HT Cable Overall size 35sq.mm (3Core)
17HT Cable Overall size 150sq.mm (3Core)
18S/E of Heat shrinkable cable end termination/ Straight through joint kit for 11 KVA /6.6 KV (E) XLPE Cables as approved & desired by Enginer in charge:-
19Heat Shrinkable End Termination for cable size 35 sq. mm, 3Core (Outdoor Type)
20Heat Shrinkable End Termination for cable size 120-185 sq. mm, 3Core (Outdoor Type)
21Supply and erection of Double Walled Corrugated (DWC) HDPE pipe to be laid 1mtr. below ground level including excavation placing the pipe in position and back filling with excavated soil etc. of the required size:-
22Double Walled Corrugated HDPE Pipe 120/103.5mm (Outer/ Inner dia.)
23Supply & erection of 11kV GO switch confirming to ISI specifications. The item includes supply and erection of operating pipe and handle arrangement of MS flat 50mm x 6mm and channels 75mm x 40mm sheet. The GO switch is to be fitted with locking arrangement so as it locks upward on "ON" position and locks downward in "OFF" position. The entire GO switch assemb ly/unit should be properly earthed and the job is to be completed as approved by Engineer-in-charge.
24Supply & erection of "D" iron clamp 50mm x 6mm flat iron complete with fixing bolts and nuts (16mm x 200mm) including making holes in th e pole as approved by Engineerin- charge.
25Supply and Erection of MS angle iron (Channel)/ MS Flats of suitable size with cutting, bending and necessary holes as desired by Engineer-in-charge at site:-
26MS angle iron size 50mm x 50mm x 5mm thick
27MS angle iron size 40mm x 40mm x 5mm thick
28MS angle iron size 100mm x 50mm x 6mm thick
29Supply & erection of 3Mtr.long 100mm dia G.I pipe along with existing PCC pole with the help of 2No. MS clamps made out of MS flat of size 50x5mm including the cost of all petty material required (such as nuts &bolts etc.) to complete the jopb in all respect to the entire satisfaction Engineer in charge.
30Dismentling of existing ACSR conductor /GI wire from the existing poles including carrying and depositingthe same to PSPCL store Moga including cost of transporation ,loading,unloading etc. to complete the job in all respect to the entire satisfaction of Engineer in charge.
31Dismantelling of exisiting electrical poles with pin/disc insulator , channel etc. including carrying and depositing the same to PSPCL store Moga including cost of transporation ,loading,unloading etc. to complete the job in all respect to the entire satisfaction of Engineer in charge.
32Dismantelling of exisitng transformer from the exisitng poles and refixing of transformer of 100KVA and above excluding cost of its fittitng such as fuse unit, GO switch, pin insulator, chanel etc whatsoever required to complete the job to entire satisfaction of engineer- in-charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail