Tender For Construction Of 01 Nos. 160Mva T/F Cooling Bank Foundation At 400Kv S/S Extension Orai Distt. Jalaun. (P.R. No. 1300003026/2022), orai-Uttar Pradesh

Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Tender For Construction Of 01 Nos. 160Mva T/F Cooling Bank Foundation At 400Kv S/S Extension Orai Distt. Jalaun. (P.R. No. 1300003026/2022). Submission Date for this Tender is 17-12-2022. Transformer Supply Tenders in orai Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

35014131
Corrigendum : Tender For Construction Of 01 Nos. 160Mva T/F Cooling Bank Foundation At 400Kv S/S Extension Orai Distt. Jalaun. (P.R. No. 1300003026/2022)
Open Tender
Indian
Uttar Pradesh
orai
17-12-2022

Tender Details

Construction Of 01 Nos. 160Mva T / F Cooling Bank Foundation At 400Kv S / S Extension Orai Distt. Jalaun. ( P.R. No. 1300003026 / 2022 )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 12-Dec-2022 Date Corrigendum Date 17-12-2022

Key Value

Document Fees
INR 590 /-
EMD
INR 10000.0 /-
Tender Value
INR 4.82 Lakhs /-

BOQ Items

Name of Work : Construction of 01 Nos. 160MVA T/F Cooling Bank Foundation (Bharat Bijlee Make) at 400KV S/S Extension Orai distt. Jalaun. (PR No.- 1300003026/2022)
Sl. No. Item Description
1Excavation in foundation in black cotton soilrequiring the use of special T&P such as pickaxes, sabbals etc including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation. (CSI No. 4.07)
2River Bed Fine Sand filling in plinth including supply of necessary quantity of fine sand from outside the UPPCL premises including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of work.(CSI No. 4.05)
3Earth filling under floors and/or corporation area including cost of earth obtainedwith in 8 km distance outside corporation area including all taxes (if any) andits carriage including watering, ramming in 20 cm layers and dressing of earth etc. all complete. (CSI No. 4.10)
4Concrete with 4cm gaugestone ballast, coarse sandand cement in proportion of 8:4:1 in foundation & under floors including supply of all materials, labour & T&P etc. complete. (CSI no. 5.04a)
5RCC work with cement, approved coarse sand and2 cm gauge graded approved hard stone ballast like granite quartzite etc from Dalla, Jhansi or other quarries in proportion1:1.5:3 in raft foundation and footings , excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. (CSI No. 5.27)
6RCC work with cement, approved coarse sandand2 cm gauge graded approved hard stone ballast like granite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3in RCC T beam-slab and column, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P . (CSI No. 5.29)
7First class brick work in 1:6 cement and coarse sandmortar in foundation and plinth including supply of allmaterials, labour & T&P etc. required for proper completion of work. (CSI No. 6.01)
8TMT/Tor steel in plain work such as reinforced concrete orreinforced brick work (when not included in an over all rates)wrought to required shape as necessary including bending forproper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor) (CSI No. 9.03)
9Fixing and grouting 25 mmand below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15)
10Same in item 9.31 above but for auxiliary structure. (labour rate only). (CSI No. 9.32)
1112 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.07)
12Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18)
133 mm thick floating coat of neat cement finish including supply of all materials,labour and T&P etc. required for proper completion of the work.( cement consumption 0.044 bag/Sq.m.) (CSI No. 11.20)
144.0 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (CSI No. 12.04)
15Dismantling reinforced cement concrete or reinforced brick work,including stacking of dismantled materials as directed by theEngineer-Incharge within a distance of 60 metres. (CSI No. 15.03)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail