Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published E-Tender For Erection, Dismantling Transportation Of Poles, Distribution Transformers, Ht/Lt Lines And Other Allied Extension Works For A Period Of One Year From The Date Of Commencement Of Work In West Bhavani Sub Division Of Bhavani Division.. Submission Date for this Tender is 12-12-2022. Distribution Transformer Tenders in Erode Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Excavationofpolepitup to27" (8.0 m) Pole by using JCB or manual |
2 | Excavationofpolepit above8mtr pole PSC/RCC/RSJ pole by using JCB or manual |
3 | Excavation of Staypit4.5" to 5"depthby using JCB or manual |
4 | Erection of PSC/RCCpoles/Metalpolesupto 8.00m. (27") by using JCB or manual |
5 | Dismantling of PSC/RCC /Metalpolesupto 8.00m. (27") by using JCB or manual |
6 | Erection of PSC/RCC /Metalpoles above 8.0m.(27") by using JCB or maual |
7 | Dismantling of PSC/RCCpoles/Metalpoles above 8.0m.(27") by using JCB or maual |
8 | Erectionofstaysetcomplete |
9 | Fixing of HT"V" crossarms(all types) / channelcrossarms/guardingCrossarms |
10 | Dismantling of HT"V" crossarms(all types) / channelcrossarms/guardingCrossarms |
11 | Fixing of LT 3 phasecrossarms |
12 | Dismantling of LT 3 phasecrossarms |
13 | Fixing of LT Single phase cross arms |
14 | Dismantling of LT Single phase cross arms |
15 | Fixing of HT/LTTIFittings |
16 | Dismantling of HT/LTTIFittings |
17 | FixingofAluminium Knob |
18 | Dismantling of Aluminium Knob |
19 | FixingofHTpinInsulators 22 KV |
20 | Dismantling ofHTpinInsulators 22 KV |
21 | FixingofHT22 KVstraindisc. |
22 | Dismantling ofHT22 KVstraindisc. |
23 | FixingofLTpinInsulator |
24 | DismantlingofLTpinInsulator |
25 | FixingofLTshackle |
26 | DismantlingofLTshackle |
27 | Paving of conductor , stringing etcof ACSR 7/4.09 mmRaccoon conductor |
28 | Dismanting of ACSR 7/4.09 mmRaccoon conductor |
29 | Paving of conductor , stringing etc ACSR 7/3.35mm /AAAC 3.15mm Rabbitconductor |
30 | Dismanting of ACSR 7/3.35mm /AAAC 3.15mm Rabbitconductor |
31 | Paving of conductor , stringing etcofACSR7/2.59mm /AAAC 2.50 mm weasel and ACSR7/2.11 mm conductor |
32 | Dismanting of ACSR7/2.59mm /AAAC 2.50 mm weasel and ACSR7/2.11 mm conductor |
33 | Sleeveconcreting including materials (Cement 1/2 bag + river sand/M-sand and Blue metals and watering) |
34 | Earthing of pole with coil earthing including burying looping and binding |
35 | Replacement of earthing of pole with coil earthing including burying looping binding |
36 | Transporting of poles / materials / conductor and other materials below 8.0 km (plains) only one direction ie no return charge (excluding loading and unloading charges ) |
37 | Above 8.0 kms for additional km (Irrespective of weight in tonnage and single direction ie no return charge) |
38 | Transportingofpolesfromroadsite topolepitincludingloadingandunloading ofpoles by using JCB or manualup to 100 m |
39 | Transportingofpolesfromroadsite topolepitincludingloadingandunloading ofpoles by using JCB or manual beyond 100 m |
40 | Loadingofpolesupto8.0 mtr / 27" |
41 | Un Loadingofpolesupto8.0 mtr / 27" |
42 | Loadingofpolesabove 8.0 m pole |
43 | Un Loadingofpolesabove 8.0 m pole |
44 | loading of materials |
45 | Un loading of materials |
46 | Leading and stacking of materials |
47 | LoadingorunloadingofTransformer upto100 KVAforeach |
48 | LoadingorunloadingofTransformer above 100 KVA andupto 200 KVAforeach |
49 | ErectionofNewTransformerall capacity (wiht jumbering) |
50 | Drilling of hole in Channel only 3/4" &1" |
51 | Cutting of angle |
52 | Re-sagging of ACSR 7/3.35 mm / AAAC 3.15 mm Rabbit conductor |
53 | Re-sagging ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm conductor |
54 | Releasing ofACSR /AAAC conductor from condutor drum and coiling 7/2.59, AAAC 7/2.50, ACSR 7/3.35, 7/3.15 mm |
55 | Erection of Street light including fixure fitting |
56 | Fixingof new CFL / LED lamp fittings |
57 | Releasingofsingle phaseserviceand re-fixing. |
58 | Releasingof3 phaseserviceand(upto 50 HP)re-fixing. |
59 | Cutting of coconut leaves (per tree) |
60 | Erection of Transformer strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of top channel, seating channel, belting angle including concreting. (Except erection of Transfomer |
61 | Erection of Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of top channel, seating channel, belting angle excluding concreting. (Except erection of Transfomer |
62 | Erection ofSingle pole strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel, transformer bed structureincluding concreting. (Except erection of Transfomer) |
63 | Erection ofSingle pole strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel, transformer bed structureexcluding concreting. (Except erection of Transfomer) |
64 | Erection of D.P.Structure with AB switch, top channel, cross bracing, earthing, painting, providing stay excluding concreing |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail