Tender For Repair Replacement And Maintenance Of Distribution Transformer And Ht Switch Gears With Connected Works At Karam Vihar Map, 285 Fd Wksp, 261 Ab Tigris Road Map, Sumran Line, Npg Line, Maude Line, Sanyat Line, Panchwati Dad, Nsb Iii, 20 Pu, New Delhi-Delhi

Military Engineer Services-MES has published Tender For Repair Replacement And Maintenance Of Distribution Transformer And Ht Switch Gears With Connected Works At Karam Vihar Map, 285 Fd Wksp, 261 Ab Tigris Road Map, Sumran Line, Npg Line, Maude Line, Sanyat Line, Panchwati Dad, Nsb Iii, 20 Pu. Submission Date for this Tender is 20-12-2022. Gear Product Tenders in New Delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

34977847
Corrigendum : Tender For Repair Replacement And Maintenance Of Distribution Transformer And Ht Switch Gears With Connected Works At Karam Vihar Map, 285 Fd Wksp, 261 Ab Tigris Road Map, Sumran Line, Npg Line, Maude Line, Sanyat Line, Panchwati Dad, Nsb Iii, 20 Pu
Open Tender
Indian
Delhi
New Delhi
20-12-2022

Tender Details

Repair Replacement And Maintenance Of Distribution Transformer And Ht Switch Gears With Connected Works At Karam Vihar Map, 285 Fd Wksp, 261 Ab Tigris Road Map, Sumran Line, Npg Line, Maude Line, Sanyat Line, Panchwati Dad, Nsb Iii, 20 Punjab, 147

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 07-Dec-2022 REVISED TENDER PAGES Other 13-12-2022
2 07-Dec-2022 REVISED BOQ BOQ 13-12-2022
3 13-Dec-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 20-12-2022

Key Value

Document Fees
INR 77200 /-
EMD
INR 77200.0 /-
Tender Value
INR 38.54 Lakhs /-

BOQ Items

Name of Work : REPAIR/ REPLACEMENT AND MAINTENANCE OF DISTRIBUTION TRANSFORMER AND HT SWITCH GEARS WITH CONNECTED WORKS AT KARAM VIHAR MAP, 285 FD WKSP, 261 AB TIGRIS ROAD MAP, SUMRAN LINE, NPG LINE, MAUDE LINE, SANYAT LINE, PANCHWATI DAD, NSB-III, 20 PUNJAB, 147 FD WKSP, 15 GRENADIERS, 218 MED REGT, 510 LT AD MSL, 6 ENGR REGT, 261 ARTY BDE, 60 INF BDE, INF BDE SIGNAL COY, 255 TRANSIT CAMP, 262 TRANSIT CAMP, 406 LT AD, CASD, 150 TA, SHEKHAWATI LINE, HAZIPEER LINE, 972 TPT COY, 629 TPT COY, 2 GARHWAL AND ASSOCIATED AREA OF AGE (U) ELECT SUPPLY NO-I UNDER GE (U) ELECTRIC SUPPLY DELHI CANTT-10
Sl. No. Item Description
1Disconnecting and taking down faulty and defective copper wound transformers of any capacity upto 315 kVA , 11000/433 Volts from two pole or 4 pole structure or substations and transporting to MES store yard for minor/major repair works complete all as specified and directed by Engineer - in- charge .
2Disconnecting and taking down faulty and defective copper wound transformers of any capacity upto315 to 630 kVA , 11000/433 Volts from two pole or 4 pole structure or substations and transporting to MES storeyard complete all as specified.
3Material and Labourin repairs for draining out complete transformer oil from transformer oil reserver tank up to 630 KVA capacity at MES store yardfor major repair works and storing the transformer oil in suitable container (container to be provided by the contractor to keep aside the oilfor re-use (after repair of transformer) and lifting of core assembly by opening of top cover and other items for inspection/examination by Board of Officers and lowering/fixing of core assembly in its original position after inspection to make it ready for transportation to contractor workshop/factory for repair works. (Note :- transportation charges will be paid separately against item No. 4&5)
4Transporting of defective/faulty copper wounds transformer of capacity up to 315 kVA , ratio 11000/433 Volts from MES store yard to contractor"s workshop/factory for repair works and return back to MES store yard after repair works completedcompleteall as specified.
5Transporting of defective/faulty copper wounds transformer of capacity 315 to 630 kVA , ratio 11000/433 Volts from MES store yard to contractor"s workshop/factory for repair works and return back to MES store yard after repair works completedcompleteall as specified.
6M&L in repairs for shifting of serviceable transformer of capacityup to 630 KVAfrom MES store Yard/Sub Stn (indoor/outdoor)or from any location at Delhi cantt for installation in place of unserviceable transformer and return back to MES store yard after replacing with repaired transformer complete all as specified and directed by Engineer - in- charge .
7M&L in repairs for factory opening offaulty / defective transformer of ratio 11000/433 volts opening the top cover of transformer , carrying out the repairs /works listed at serial No. (i) to (xi) below for the transformers of capacity up to 315 KVA . (i)Taking out the core/coil of transformer from tank by disconnecting star delta connection of transformer , After dismantling of Transformer and physical joint inspection of core coil assembly (removing all 3 limbs HV &LV winding from Core Assembly) washing of core assembly by hot oil for removing brunt carbon and copper particles and cleaning of complete top yoke by oil (ii)Painting inside of the transformer with yellow paint and outside body with synthetic enamel paint of existing tint/color Cleaning inside of the transformer by using transformer oil. (iii)Refixing/ reassemble of complete core assembly and core coil assembly providing new coils and new tap leads of tap changer including requisite insulation material including heating up the transformer core assembly to remove moisture after carrying out the repairs works . (iv) Renewal of rubberized gasket set for top cover, Brass spindles, LT and HT bushings ,tap changer connection WTI &OTI connection and CT connection etc. (v)Refilling of the decanted transformer oil after centrifuging and testing for required di-electric strength. (vi)Refixing the transformer top cover with nuts, bolts and washers and conservator tank ready for final testing all as directed in presence of rep of MES. (vii) Preparing Inspection report for renewal of parts etc in presence of Engineer - in- charge and Contractor. (viii)The contractor shall arrange factory visit for the Engineer - in- chargeor his representative as and when required, testing of transformer to be done on full load at factory. (ix) Soldering/ brazing or connecting LV bus bars with suitable size nuts, bolts and washers (x)Providing necessary insulation papers, sleeves, PVC pipes insulation sheet etc. (xi)Renewal of worn out nuts, bolts and washers Note : Coil and insulation shall be measured and paid separately
8All as per item N0.7 here in before but up to capacity above 315 KVA to 630 KVA
9Material and Labourin repairs for rewinding of HT coils with copper wire DPC/super enameled high quality matching with existing gauge and impedance including requisite insulating paper/material in each layer of winding after taking down old existing winding of HT coils of 11 KV transformer complete. Note : (i) The rate quoted against these items is inclusive necessary provisionof all types of insulating materials , heating andvarnishing etc.
10Allas per item No 09 here-in-before but LT coils with copper strips.
11Material and Labourfor drying/ovening of complete Core coil assembly(CCA)in vacuum chamber and continuous monitoring to improve of IR Values after varnishing the coil to eliminate moisture contentfrom Transformer up to 630 KVA capacity complete .
12Material and Labour after drying and oveningandRe-assembling of up to 630 KVA Transformer core, testing of magnetic circuit for IR values, assembly and connection of OLTC of all phases, testing of transformer at low voltage, checking of ratio and polarity test.all as specified and directed. Note: For Item no 07 to 12 The following routine test as per IS 2026 (Part I) -2011 shall be carried out at repairing workshop /manufacturer having NABL calibration of test equipments (i)Measurement of winding resistance. (ii)Measurement of voltage ratio and check of voltage vector relationship. (iii)Measurement of impedance voltage/short circuit impedance (principal tapping) and load loss . (iv) Measurement of no load loss and current. (v) Measurement of insulation resistance. (vi)Dielectric tests (c) The contractor shall give written warranty of one year for the repaired transformer. Note :-HT/LT leg coilsand transformer oilrequired for top up shall be measured and paid separately under relevant items of this Schedule here-in-after as supply only.
13M&L for hiring,transportation ,Installation and testingof serviceabletransformer of same capacity or higher in place of unserviceable transformer which is under repair and shifting backto workshop ,on hire basis for 15 days when ordered complete all as specified and directed.
14Note :-1.Repairing of transformer have to be completed within 15 days duration, no extra costwill be paid toward hiring charges beyond 15 days. Moreover contractor shall not be allowed to shift the hired transformer until it is replaced by the repaired transformer.In case any fault/breakage/burning/ peeling of painting and any other defects occurred in hired transformer the contractor shall have to make good himself from his own expenses. Contractorshould check the available infrastructure and to be sure regarding safety of hiredtransformer before installation.The rate quoted is deemed to be included all as transportation cost, , earthing leads lifting/lowering arrangement etc for transformer of capacity upto 630 KVA.
15Note-2.In case the defective/ unserviceable transformernotrepaired & installed on its sitewithin the specified period of 15 days from the date of handing over to contractor ; a penaltyrecovery@ Rs. 1000/- per day will becharged from his dues. During this periodcontractor shall not be allowed to shift the hired transformer until it is replaced by the repaired transformer.No extra cost beyond 15 days will be paid to contractor on this account.
16Supply and fixing in renewal of transformer bushingon LT433voltside including brass stems /rodsconical bush and gasket suitable for indoor/outdoor transformer capacity up to 630 KVA complete all as specified and directed .
1763 KVA to 315 KVA.
18315 KVA to 630 KVA.
19Supply and fixing in renewal of porcelain transformer bushingHT 11KV including brass set stems conicalbush and gasket for indoor/outdoor transformer of following capacities complete all as directed by Engineer-in-Charge.
2063 KVA to 315 KVA.
21315 KVA to 630 KVA.
22S&F in renewal of silica gel ofbreather assembly with vent pipe and new silica gel for indoor/outdoor transformer of thecapacity up to 315 KVA complete all as specified and directed.
23All as per item No 16 here in beforebut of capacity 315 KVA to 630 KVA
24Material and labour for centrifuging and dehydration including filtration and cleaningof transformer oilby using automatic centrifuging/dehydrationmachine electric operated without any shutdown of transformer including testing oilsamplebefore and after dehydration and filtration oil to achieve min 35 to 40 KV breaking capacity at 4 mm gap by absorbing and abolishing all sludge particles for use as per BS-B-66-1983 complete all as specified and directed by Engineer - in- charge Note:- (i).Standby supply will be arranged by the contractor) (ii).Transformer oilrequired for top upshall be measuredand paid for separate (iii) Contractor have toarrangethe dehydration machine and testingkit from his own resources without any extra cost
25Supplying and topping up transformer oil low viscosity, dielectric strength 35 to 40 kV breaking voltage for topping up transformers duly centrifuging including filter action by using automatic centrifuging machine to achieve min 35 to 40 KV breaking capacity at 4 mm gap by absorbing and abolishing all sludge particles for use as per BS-B-66-1983 complete all as specified and directed by EIC.
26Supply andfill in replacementsilica gel in transformercomplete all as directed.
27Painting of transformer after preparation of old painted surfaces of steel, by brushing/cleaning stain, greasy spots with thinner, applying two coats of spray painting with PU paint with spraying machine to transformer indoor/outdoor, fixed on poles or in Sub Station at different location after disconnecting of HT supply from incoming and LT supply from outgoing capacity63 KVA to 315 KVA complete all as specified and directed .
28All as per Serial item No 21 here-in-before but 315 KVA to 630 KVA capacity
29Disconnecting electric outdoor transformer 11 KV capacity up to 630 KVAon existing 2/4 pole structure from HT/LT terminals and lifting by hydra for installation onnewly constructedplinth complete all as specified and directed .
30Platform :- M&L for Brick Masonry ( Using sub class "B" Brick) platform of size 3m x 3m x 1 m height , built in CM 1:4 complete with excavation & earth work , PCC 1:4:8 type D-2 in foundation , 15 mm thick rendering in CM 1:6 on sides and top of the brick work , up to 150 mm below ground level , supply and fixing of 02 Nos MS Channels ofsize ISMC-100for balancing of Transformerembedded in PCC 1:2:4 type B-1 up to 100 mm Thick RCC 1:2:4 with 10 mm steel bar including 20 mm graded aggregate , including provn of steps on one side complete all as specified and directed .
31Fencing :- M&L for perimeter fencing of size 04m x 04m x 2m (as per site condition) havingMS work ofangle ironfor post and struts of fencing around the transformer plinth/substation/LT panels etcdrilling holes flat iron fillet for securing wire mess by welding to angle iron frame and framed workas in door/gate of angle ironand wiremesh.Door to be fixed by 03 nos 100mm long hinges and one sliding door bolt of 300mm long for lockingarrangement. Details are as follows:- (a)Angle ironpost to post distance maintained not more than 02mtr ,size of angle shall be 40x40x5mm.Angle Iron shall be embedded in natural ground not less than 0.90 m deep. (b)MS wire 75x75mm mesh 3.15 mm dia ,2mtr height and shall befixedto post with flat iron 32 x 6 mm fillet with two coats of synthetic enemel paint over a coat of red oxide primer. (c)Cement concrete type D-2 ,1:4:8 using grade crushed stone aggreagte for mass concrete/ foundation. (d)Brickwork with subclass "B " bricks ,straights or curved on plane exc 6m mean radius ,built in cement mortar 1:6 complete for toe wall along the perimetre fencing.The toe wall shall be one brick thick,30cm high (15cm above GL and 15cm below GL) on 75mm thick PCC lean concrete. (e) The exposed surfacesof brickworkshall be rendered 15mm thickin CM (1:4) finished fair and even without using extra cement. (f) The steel gate shall be of size 1.00m x2.00 m fabricated from angle iron 40x40x5 mm frame and 12x12 mm square guard bars. (g) All the exposed surfaces of steel shall be painted with two coats of Synthetic enamel paint over one coat of Red Oxide Primer. (h) Dry stone aggregate of size 40mm spreaded ,levelled & compacted upto 100mm thick. (h) Necessary excavation and eathwork shall be included in the quoted rate.
32Earthing complete in replacement with galvanized steel earth plate electrode 60 cm x60 cm x 6 mm thick buried directly in ground ,(Earth pit not less than 2.25 meter deep below ground level) with top edge of plate not less than 1.5 meter below normal ground level ,connected to and including galvanized iron earth wire 32 X 6 mm by means ofnut, bolts, check nuts and washers of galvanized iron or steel and provision of charcoal dust and common salt packed all around the earth plate including necessary excavation and earth work in soft/loose soil and testing complete all as specified and directed and shown in electrical plate number 3 of MES SSR part-I(2009)(a) Excavation and earth work for drilling hole for electrode in soft/loose Soil. (b) PCC pit in cement concrete 1:2:4 type B-1, Pre cast RCC cover with suitable handle 40 mm thick in PCC 1:2:4 type B-1, reinforced with welded steel wire fabric weighing not less than1.87 Kg/ Sq meter. (c) Funnel with watering pipe of GI 20 mm nominal bore light grade and lugs etc complete all as specified and directed (d) 40 mm nominal bore medium grade GI protection pipe for protection of earthing lead complete all as specified and directed. (e) Requisite quantity of common salt and charcoal. (f) Testing of earthing.
33Supply and fixing in replacement of galvanized iron strip 32 X 6 mm for additional earthing lead beyond 7.5 meter complete all as specified and directed.
34S&F Thermometer of transformer capacity up to 630 KVA complete all as specified and directed
35Material and labour for cleaning of 2/4/6 pole structure for loose filling under 2/4/6 pole structure / along the transformer plinth in side the fencing area after cleaning/surface excavation including taking out grass/herbs and filling of aggregate. Note: Aggregate will be paid separately at item No 30 here in after
36Material and labour for crushed stone aggregate of size 20mm, for loose filling under 2/4/6 pole structure / along the transformer plinth in side the fencing area after cleaning/ surface excavation and, complete all as specified.
37Cutting/trimming of tree branches around transformer,2/4/6 pole structure up to 5 mtr distance at all sides and disposal complete all as specified and directed.
38Supply in replacement four wheeled trolley all as specified and directed for load up to 25 ton with the following specification & details:- Trailer 4 Wheeler size 3500mm x 2500mm (a) Main Chassis shall be made of MS channel 125x65mm. (b) Axle size 62x62 MM MS square with steel forged hubs and new tapper roller bearing. (c) Leaf springs-04 Nos spring for suspension system size 70 x 10 x 900. (d) Draw-Bar:- Triangular draw bar on front made with male Feale angle and pipe bushes with Eye hook towing arrangement. (e) Towing arrangement:- Spring loaded towing hook for universal attachment with any vehicle size 36mm round. (f) Floor sheet:- Floor fully covered witm 2mm thick MS sheet. (g) Tyre assembly:- 04 Nos new tyers assembly size 7.50x16 (Nylon) and standard Make as CEAT, JK, & MRF. (h) Finishing & painting:- Finishing with grinding and one coats of zinc-chromate (primer) and two coats of super synthetic enamel paint of any shade as approved. (j) Fittings:- All necessary fittings like 02 Nos reflectors on rear.
39M&L in replacement of aluminum/Ms jumpher upto 630 kVA capacity HT pole structure including busbar with using minc conductor sleeves(RYB) PG clamps nut bolts and washer etc complete as directed by Engineer -in- charge
40M&L mild steel Bends, straps, supports or stays for rainwater, fan clamps ventilating pipes incld bolts if reqd hooks (stay) heavy for large gates, hook and pinton hanges large hasps and staples : chains hand made sliding bolts clamps hold fasts, wall ties hooks for hanging fans, plain angle cleats for securing purlins to wood trusses rafters: knee piece inserts, two way and three ways straps, plate washers and similar small articles conforming to Fe-290 Gde-E-165 complete all as specified.
41S&F first aid box with complete medicines as directed by Engr In Charge
42M&L for replacement of complete control wiring (AC/DC) in existing HT 11 KV VCB Panel of capacity 630 Amps installed at substation using 2.5 Sqmm FRLS copper wire and associated accessories necessary for wiring and integration of control panel with breaker, relays, meters, power pack, T&C switch, annunciator etc and including the following:- (i) AC/DC copeer wiring, lugs, terminals, TB"s, TB markers, strips, etc which are necessary for integration of new items with existing panel. The contractor shall ensure integrity of critical protection scheme off the panel and shall be demonstrated via functional tests at site including tacking out control wiring complete all as specified and directed.
43Supplying, installation, commissioning and testing in replacement of 11 KV Current Transformer (CT`s), indoor type, resin cast epoxy type,of 25.0 KA/Sec having ratio 300/150/5-5 Amps having Core1: Class 5P10, 10VA for protection , Core2: Class 0.5, 10VAfor metering including associated wiring complete all as specified and directed
44All as per item No 37 here-in-beforebut having ratio 200/100/5-5
45All as per item No 37 here-in-beforebut having ratio 150/75/5-5
46All as per item No 37 here-in-beforebut having ratio 100/50/5-5
47All as per item No 37 here-in-beforebut having ratio 50/25/5-5
48Supplying and fixing in replacement Potential Transformers, Draw-out type in existing HV panel for easy maintenance, 11kV/rt3:110V/rt3, 50VA, Cl.0.5 with associated gun-type HRC fuses and MCBs for HT/LT isolation
49Material and labor for servicing /testing ofbreaker/control panelincludingCT, PT and relays in control panelof VCB of capacity 1250/630/400 Amps and rating 11 KVcomplete as details mentioned as under:- (a) Details of servicing of breaker :- (I) Adjustment of mechanism if required. (ii) Clean the circuit breaker to remove dust and dirt. The envelope of the vacuum interrupter and insulating materials shall be wiped with a clean cloth. (iii) Apply a small amount of oil to rotary sections, sliding surfaces, pins, coupling section, etc.use grease for the operating shaft and bearings, and machine oil for other parts. (iv) Check for rust and wear. (v) Check Spring Tension and pitting of the Cluster Contacts. (vi) Visual check for rust and deformation. (vii) Check for loosened bolts and nuts, broken spring washers and snap pins etc. (viii) Check for loosened connections, rust, damaged lead wires. (ix) Check whether the contacts are damaged by arcing. (x) Checking of control circuit & tighten the connections if any. (xi) Check close & trip coil. (xii) Checking of Jaw Contacts Conditions and repair/adjust. (xiii) Replace the jaw contacts, If required. (xiv) Improvement of resistance of epoxy insulator and epoxy body by applying post heated varnish. (xv) Replacement of Dashpot/shock absorbers . (xvi) Replacement ofcarbon brush of spring charging motor (xvii) Flash cleaning of complete bus barwith CRC
50(b) The following test shall be carried out:- (i) Primary Injection Test of CT / PT (ii) Closing & Opening Timing Test for all three poles. (iii) IR Test with megger in open and closed condition. (iv) Contact resistance test for all three poles (v) Closing coil resistance (vi) Tripping coil resistance. (c) Testing of following relays of control panelwith Secondary Injection Kit ,checking andprogramming of relay:- (i) Over current and earth fault relay (d) Testing of following Aux relay (i) DC Supply supervision relay. (ii) Master trip relay
51S&F andinstallation battery 12 volts,100 AH, dry type in replacement of old unserviceable battery in battery charger with suitable size of new copper battery terminal and lugs and initially charging, commissioning and testing complete.
52S&FMCB single pole of capacity06 Amps, 10 KA, C curve with provision of suitable channels in replacement of existing fuses.
53Supplying, installation, commissioning and testing in replacementof PT unit three phase, three limbs, up to 11 KV draw-out type, resin cast dry type, single ratio having primary voltage 11 KV & secondary voltage 110 volts, 50 VA class-1 including necessary bus bar connections & wiring for metering complete all as specified and directed .
54S&F in replacement of LED indication lamp for breaker ON/OFF/TRIP/Breaker Spring Charged/R-Y-B etcfor 11 KV control panelincluding associated wiring, if reqd, complete all as specified and directed.
55Supply and installationin replacement Anti-condensation space-heater with Thermostatic control in cable andcircuit breaker compartments ofHT switchgears complete all as specified and directed.
56S&F in replacement of vacuum interrupter suitable for400/630 amps, 11 KV HT VCB complete all as specified and directed
57S&F in replacement of isolating contact assembly suitable for400/630 amps, 11 KV HT VCB complete all as specified and directed
58S&F in replacement of fixed contact block complete suitable for400/630 amps, 11 KV HT VCB complete all as specified and directed
59S&F in replacement of moving contact block complete suitable for 400/630 amps, 11 KV HT VCB complete all as specified and directed
60S&F in replacement of motor & gear assembly 230V AC suitable for 400/630 amps, 11 KV HT VCB including testing & putting on load complete all as specified & directed.
61S&F in replacement of spring bearing gear suitable for 400/630/800 amps, 11 KV HT VCB complete all as specified and directed
62S&F in replacement of closing coilassembly 24 volts DC suitable for 400/630amps, 11 KV HT VCB complete all as specified and directed
63S&F in replacement of tripping coilassembly 24 volts DC suitable for 400/630 amps, 11 KV HT VCB complete all as specified and directed
64Supply and fix in replacement close/trip coil 24V DC for 11 KV HT VCB of capacity 400/630 Amps capacity all as specified and directed.
65S&F in replacement of panel door locksuitable for 400/630amps, 11 KV HT VCB complete all as specified and directed
66Supplying & Fixing in replacement auxiliary switch (7 No + 7NC) suitable for 400/630 amps, 11 KV HT VCB complete all as specified and directed
67Supply and fix in replacement T&C Switch for Breaker ON/OFF purpose in HT 11 KV VCB panel including associated wiring, if reqd, for proper functioning of switch complete all as specified and directed.
68Supplying & Fixing in replacement support road with screwssuitable for 400/630 amps, 11 KV HT VCB complete all as specified and directed
69Supplying & Fixing in replacement support insulatorsuitable for 400/630 amps, 11 KV HT VCB complete all as specified and directed
70Supplying & Fixing in replacement upper connector suitable for 400/630 amps, 11 KV HT VCB complete all as specified and directed
71Supplying & Fixing in replacementlowerconnectorsuitable for 400/630 amps, 11 KV HT VCB complete all as specified and directed
72Supply & fix in replacementonly set of 6 Nos fixed arcing contacts suitable for 400/630 amps, 11 KV HT VCB complete all as specified and directed
73S&F in replacementCaution plate “CAUTION MEN AT WORK of size 40cmx15cmmade out of white acrylicsheet withRed colored glow tape and size of writing letter is not less than 5 cm each.
74S&F in replacement of HRC fuse of capacity 20 Amps for VCB complete all as specified and directed
75S&F in replacement MCB20 to 32 Amps DP
76S&F in replacement ofDigital Ampmeter (CT secondary site selectable 5A) for 11 KV VCB Control Panel
77S&F in replacement ofDigital Voltmeter Secondary voltage 110 V for 11 KV VCB Control Panel.
78Material and labor in replacement Retro Reflective installation sign boards of size 5 feet x 4 feet fabricated out of 16 gauge MS sheet frame duly welded/riveted with MS square pipe of size 25mm x25 mm , 3mm thick at height 2.00 meter above ground level on stainless steel heavy dutypipe of size 50mmbore embedded 60 CM in PCC 1:2:4 type B 1 block of size 45cmx45cmx60cm including necessary excavation and earth work.The MS portion of the board shall be painted with 2 coat of stove enameled paint and the front & back of the frame shall be overall sheathed with blue color base painter adhesive tape.The writing matter will be in English alphabets on both sides with reflective adhesive painter tapes of letter size not less than50mmas directed by Engineer -in-charge.
79NOTE :-(i)contractor shouldprovide 50% of the material as listed above within 15 days of the placing of work orderand shall be verified by the Eng-in-charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail