Brihan Mumbai Electric Supply And Transport Undertaking has published Tender For Biennial Rate Contract For Executing Various Schemes Such As Provision Of Street Lights, Shifting/Removal Of Street Lighting Poles With Fixtures, Improvement Of Street Lighting Systems Etc. Prepared By Street Lighting Construction Department. Submission Date for this Tender is 02-01-2023. Holding and Clamping Tools Tenders in Mumbai Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 02-Dec-2022 | Corrigendum | Date | 19-12-2022 |
2 | 20-Dec-2022 | Postponement of Tender | Date | 02-01-2023 |
3 | 26-Dec-2022 | corrigendum2 | Other | 02-01-2023 |
Sl. No. | Item Description |
1 | Items : |
2 | Installation of MS Galvanized Pole of height 5 mtrs. with burial foundation |
3 | Installation of MS galvanized pole of height 7 mtrs with burial foundation |
4 | Installation of MS galvanized pole of height 9 mtrs with burial foundation |
5 | Installation of MS galvanized pole of height 14.5 mtrs with burial foundation |
6 | Installation of MS galvanized pole of height 7/9 mtrs on flyover & bridges |
7 | Installation of MS GI Arm Bracket 1220×81 single arm |
8 | Installation of MS GI Arm Bracket 1220×81 double arm |
9 | Installation of MS GI Arm Bracket 1830×94 single arm |
10 | Installation of MS GI Arm Bracket 1780×120 double arm |
11 | Installation of MS GI Arm Bracket 1830×94 double arm |
12 | Installation of MS GI Arm Bracket 1830×94 quadra arm/ Triple arm |
13 | Installation of MS GI Arm Bracket 600×94 six way arm |
14 | Installation of Bracket MS GI Arm 600×120 six way arm |
15 | Installation of Decorative Lantern 15 W on 5 mtr pole with wiring |
16 | Installation of Lantern 50 W /105W /150W on 5/7 mtrs pole with wiring |
17 | Installation of Lantern 105 W/150W/170W on 9 mtrs pole with wiring |
18 | Installation of Lantern 170 W on 14.5 mtrs pole with wiring |
19 | Installation of Lantern 210W /270 W on 9/14.5 mtrs pole with wiring |
20 | Installation of M.S. G.I. C-Clamp with 2 feet arm in size 600 mm Bracket for 7/9/14.5mtrs pole |
21 | Installation of Switch Box on pole |
22 | Laying of Earthing pipe |
23 | Excavation and Laying of cables between poles on Kutccha surface |
24 | Excavation and Laying of cables between poles on roads |
25 | Excavation and Laying of cables between poles on footpath (paver block) |
26 | Excavation and Laying of cables between poles on concrete surface |
27 | Fixing of existing cable gland termination to Switch Box |
28 | Fixing of new gland termination with 25/4C XLPE Cable to Switch box |
29 | Fixing of new gland termination with 300/4C XLPE Cable in New Street Light Pillar |
30 | Cable pulling through HDPE pipe ID 67 mm. |
31 | Installation of New Street Lighting Pillar with precast foundation |
32 | Removal of existing Street Light Pillar with various Cable terminations (approx. 4 terminations) |
33 | Removal of Lantern 15W from 5 mtrs pole |
34 | Removal of Lantern 50W from 5/7 mtrs pole |
35 | Removal of Lanterns 105W/170W/150W/210W/270W from 9 mtrs pole |
36 | Removal of Lanterns 170W/ 150W/210W/270W from 14.5mtrs pole |
37 | Removal of Bracket for 5/7 mtrs pole |
38 | Removal of Bracket for 9/14.5 mtrs pole |
39 | Removal of Switch box |
40 | Removal of cables by pothead or straight jointing |
41 | Removal of pole 5 mtrs |
42 | Removal of pole 7 mtrs |
43 | Removal of pole 9 mtrs |
44 | Removal of pole 14.5 mtrs |
45 | Removal of pole 7/9 mtrs from flyover & bridges |
46 | Installation of flood lantern with fixing angel bracket |
47 | Fixing additional Switch Box on pole and looping wire between existing Switch Box and new Switch Box |
48 | Focus adjusting of Lantern as per requirement. |
49 | Jointing of cables wherever required of 300/4C XLPE Cable |
50 | Jointing of cables wherever required of 25/4C XLPE Cable |
51 | Making permanent pothead or sealing the cable 300/4C XLPE Cable |
52 | Making permanent pothead or sealing the cable 25/4C XLPE Cable |
53 | Installation of New Street Light Pillar |
54 | Removal of existing Street Light Pillar |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy