Department Of Soil and Water Conservation has published Tender For Afforestation Works By Way Of Planting Of Conifer& Naked Root(B/L) Plants,Dibbiling Of H C Nuts And Construction Of Inspection Path At Toolihalan Sedow Shopian. Submission Date for this Tender is 03-12-2022. Environmental Decontimination Service Tenders in shopian Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Afforestation works by way of plantingof Conifer plants , Dibbiling of H.C. Nuts and Construction of Inspection Path at Toolihalan Sedow Shopian. |
2 | Soil work in excavation for preparation of staggerred pits of size 0.45x0.45x0.45Mtr. In desne hard soil,maintaining the required diatance from pit to pit, dumping of clean surface soil seperately for refilling into the pits at the time ofplanting & rest down hill side of the pits, planting of polyraised Conifer saplingsPlantsin the middle of the pits into already dug out pits ,refilling of pits with clean pulverised top soil, ramming around the plants fimly with feet for firm fixation including carriage/lifting from different nurseries of Forest Deptt.by mechanical transport within a maximum lead of 150 KM and headload/ carriage including Handling,loading & unloading upto site of work all other operations complete. |
3 | Dibbling of H.C. Nuts preferably within the Gullies having enough ofmoisture for germination of Nuts & Developing of seedlings (The rate include cost of healthy seeds and its carriage upto working site.At least two seeds should be dibbed per patch of size 30x30x15 cm |
4 | Construction of Inspection Path 1Mt width with standard specification including the costand carriage of the material and labourall operations. |
5 | Afforestation works (BUC) by way of plantingof Conifer /Naked Root (B/L) plantsat Toolihalan Sedow Shopian in already established Closure of 2020-21. |
6 | Soil work in excavation for preparation of staggerred pits of size 0.45x0.45x0.45Mtr. In desne hard soil,maintaining the required diatance from pit to pit, dumping of clean surface soil seperately for refilling into the pits at the time ofplanting & rest down hill side of the pits, planting of polyraised Conifer saplingsPlantsin the middle of the pits into already dug out pits ,refilling of pits with clean pulverised top soil, ramming around the plants fimly with feet for firm fixation including carriage/lifting from different nurseries of Forest Deptt.by mechanical transport within a maximum lead of 150 KM and headload/ carriage including Handling,loading & unloading upto site of work all other operations complete. |
7 | Soil work in excavation for preparation of staggerred pits of size 0.45x0.45x0.45Mtr. In desne hard soil,maintaining the required diatance from pit to pit, dumping of clean surface soil seperately for re-filling into the pits at the time ofplanting & rest down hill side of the pits, planting of Naked Root (B.L). Plantsin the middle of the pits into already dug out pits ,re-filling of pits with clean pulverised top soil, ramming around the plants fimly with feet for firm fixation including the puchase of plantingmaterial 4ft. above having a well developed short of thumb thickness,mechanical carriage /Handling charges of planting material including all other operations complete. |
8 | Afforestation works (BUC) by way of plantingof Conifer /Naked Root (B/L) plantsat Toolihalan Sedow Shopian in already established Closure of 2021-22. |
9 | Soil work in excavation for preparation of staggerred pits of size 0.45x0.45x0.45Mtr. In desne hard soil,maintaining the required diatance from pit to pit, dumping of clean surface soil seperately for refilling into the pits at the time ofplanting & rest down hill side of the pits, planting of polyraised Conifer saplingsPlantsin the middle of the pits into already dug out pits ,refilling of pits with clean pulverised top soil, ramming around the plants fimly with feet for firm fixation including carriage/lifting from different nurseries of Forest Deptt.by mechanical transport within a maximum lead of 150 KM and headload/ carriage including Handling,loading & unloading upto site of work all other operations complete. |
10 | Soil work in excavation for preparation of staggerred pits of size 0.45x0.45x0.45Mtr. In desne hard soil,maintaining the required diatance from pit to pit, dumping of clean surface soil seperately for re-filling into the pits at the time ofplanting & rest down hill side of the pits, planting of Naked Root (B.L). Plantsin the middle of the pits into already dug out pits ,re-filling of pits with clean pulverised top soil, ramming around the plants fimly with feet for firm fixation including the puchase of plantingmaterial 4ft. above having a well developed short of thumb thickness,mechanical carriage /Handling charges of planting material including all other operations complete. |
11 | Afforestation works (BUC) by way of plantingof Conifer /Naked Root (B/L) plantsat BudnadSedow Shopian in already established Closure of 2021-22. |
12 | Soil work in excavation for preparation of staggerred pits of size 0.45x0.45x0.45Mtr. In desne hard soil,maintaining the required diatance from pit to pit, dumping of clean surface soil seperately for re-filling into the pits at the time ofplanting & rest down hill side of the pits, planting of Naked Root (B.L). Plantsin the middle of the pits into already dug out pits ,re-filling of pits with clean pulverised top soil, ramming around the plants fimly with feet for firm fixation including the puchase of plantingmaterial 4ft. above having a well developed short of thumb thickness,mechanical carriage /Handling charges of planting material including all other operations complete. |
13 | Soil work in excavation for preparation of staggerred pits of size 0.45x0.45x0.45Mtr. In desne hard soil,maintaining the required diatance from pit to pit, dumping of clean surface soil seperately for refilling into the pits at the time ofplanting & rest down hill side of the pits, planting of polyraised Conifer saplingsPlantsin the middle of the pits into already dug out pits ,refilling of pits with clean pulverised top soil, ramming around the plants fimly with feet for firm fixation including carriage/lifting from different nurseries of Forest Deptt.by mechanical transport within a maximum lead of 150 KM and headload/ carriage including Handling,loading & unloading upto site of work all other operations complete. |