Sl. No. | Item Description |
1 | Excavation for foundation/pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
2 | Excavation for foundation/pipetrenches in hard murum and boulders, W,B.M road including removing the excavated material upto a distance of 50M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excludingbackfilling, etc. complete. |
3 | Excavation for foundation/pipe trenches in slush muddy/marshy/slushy/soil including use of poclain, labour for dewatering during execution including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, preparing the bed by cleaning the mud, labour required for execution for shuttering item but excluding backfilling, etc. complete. Providing and fixing shuttering shall bepaid separately. |
4 | Lift 0.00 to 1.5m |
5 | Lift1.50m to 3.00 m |
6 | Dewatering the excavated trenches and pools of water in the building trenches/pipe line trenches, well works by using pumpsand other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. |
7 | Providing and supplying ISI standard MS specials of required thickness with 3coats of approved make epoxy paint (Shalimar,Cibaor Mahindra & Mahindra make) from inside and outside excluding all statutory duties & taxes such as GST levied by GOI & GOM in all respect, inspection charges, transportation to stores/ site, and stacking, etc. complete. MS Barels locally manufactured730,400,300,200,150 id |
8 | 730 mm dia ID |
9 | Providing and making lead caulked joint with molten lead to Cast Iron pipes and/or specials of all classes and fitting of following dia including cost of lead and all jointing material, labour, hydraulic testing etc. comp. |
10 | Gas cutting (either square cut or V cut) pipes, plates, etc. of thickness.Above 5 mm upto 10 mm |
11 | Weldingin all positions with required number of runs, for M.S. pipes internally and/or externally including gauging wherever necessary, fixing appurtenances and other accessories in connection with pipe laying work as per specification. |
12 | removing existing sluice valve / half body of sluice valve etc. complete. Including refixing. (40% rate of fixing, MJP mech DSR 209-20 sect. BLB Dy 88) |
13 | 600 mm dia |
14 | 450 mm dia |
15 | 400 mm dia |
16 | 350 mm dia |
17 | 300 mm dia |
18 | 200 mm dia |
19 | 150 mm dia |
20 | Lowering, laying and jointing in position following C.I.D / F reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc.complete. |
21 | 300 mm dia |
22 | 200 mm dia |
23 | 150 mm dia |
24 | Providing and supplying following materials including all taxes, transportation to departmental stores etc. complete |
25 | Nut bolts of required size |
26 | Lead wool |
27 | Cake Lead |
28 | M-seal |
29 | Spurn yarn |
30 | Rubber packing 8mm thick |
31 | cement |
32 | MS angles |
33 | Binding wire |
34 | Gland rope |
35 | Providing and supplying on hire charges |
36 | JCB |
37 | Hydra/crane |
38 | providing, supplying of male mazdoor for emmergency such as in rainy season additional labour for filter and for cleaning premises etc. complete. |
39 | Providing and supplying of followng material suitable for existing valves including all taxes, transporation to departmental store etc. complete. |
40 | S.S spindle |
41 | S.S. Check Nut |
42 | providing and laying cement concrete for foundation , block with dewatering from work compaction, curing, finishing, etc. complete. |
43 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
44 | Providing and applying two coats of flat oil paint of approved colour to the old structural steel work and iron work previously painted in building including scaffolding , ifnecessary,cleaning and preparing the surface (excluding primer coat) etc. complete. |
45 | Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:4 including scaffolding, racking out joints pointing in C.M. 1:4 and watering in pillars of rectangular or square shape as shown on the drawing or as directed etc.complete. |
46 | Providing internal cement plaster 12 mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc.complete. |
47 | Comprehensive cleaning of the ESR/ GSR/ Sump/ Clariflocculator or any storage unit of water supply, sewerage works in wet or dry condition during planned shutdown of the water supply with the help of water jet cleaning system including all lifts and leads upto 150 meters as required beyond the work site, stacking and spreading etc complete as directed by Engineer in charge. The rate to include all taxes, materials, equipment, electrical installation, all labour, ednsumables and transportation charges, energy charges for entire job. |
48 | 1) The item to include record submission of photographs taken during the cleaning process. |
49 | 2) Electric supply will have to be arranged by the firm. |
50 | 3) In case of any dishappening at the site to any structure/ equipments or human being the same shall be sole responsibility of the firm. The firm must ensure the guidelines of NHRC and factories Act in this regard incase any compensation is to be paid, the same shall be |
51 | 4) The person who executes the work at site must have Electrical qualification or Electrical license. |
52 | 5)The firm must get checked the water samples before start of work and after completion of work from the laboratory, the testing cost will be borne by the firm. |
53 | 6) Care should be taken l" such that column assembly of pumping machinery is not disturbed or damaged otherwise necessary compensation would be recovered from firm. |
54 | 7)The water in the reservoir is highly chlorinated having dose of 2PPM or more. The firm must take all safety precaution before start of work and during execution period. |
55 | 8)10% of payable amount will be withheld and will be released after 3 months from completion of work. NOTE: Conditions from Sr.No 1 to 8 shall form apart and parcel of the tender and must be included in draft tender papers. |
56 | CLF cleaning |
57 | 56 MLD |
58 | 100 MLD |
59 | Inlet chamber |
60 | Recycle unit |