Military Engineer Services-MES has published Tender For Comprehensive Maintenance For Hot/Eot Cranes Of Various Capacity Under Ge(M) Arakkonam. Submission Date for this Tender is 08-12-2022. Cranes Tenders in arakkonam Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 01-Dec-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 08-12-2022 |
Sl. No. | Item Description |
1 | SCHEDULE "A" PART-I [ E/M WORKS] |
2 | Preventive and breakdown comprehensive maintenance of electrically operated over head travelling (EOT) Crane of different capacity, floor operated, Comprising of Hoist motor, Long travel motor, Cross travel motor, Micro Hoist, Gear boxes, Electric control panel and other connected accessories complete all as specified and as directed by Engr-in-Charge |
3 | 10 Ton Capacity EOT Crane |
4 | 05 Ton Capacity EOT Crane |
5 | 04 Ton Capacity EOT Crane |
6 | 02 Ton Capacity EOT Crane |
7 | Preventive and break down maintenance of HOT Cranes different capacity, floor operated comprising of Hoist, Long travel, Cross travel, Chain pulley block and other connected accessories complete all as specified and as directed by Engr-in-Charge |
8 | 02 Ton Capacity HOT Crane |
9 | 01 Ton Capacity HOT Crane |
10 | Preventive and breakdown comprehensive maintenance of electrically operated Flame Proof EOT Cum HOT Crane of different capacity, floor operated, Comprising of Hoist motor, Long travel motor, Cross travel motor, Micro Hoist, Gear boxes, Electric control panel and other connected accessories complete all as specified and as directed by Engr-in-Charge |
11 | 03 Ton Capacity EOT cum HOT Crane |
12 | 01 Ton Capacity EOT cum HOT Crane |
13 | 0.50 Ton Capacity EOT cum HOT Crane |
14 | Note for Item No 2 to 4.03:- (i) Quoted unit rate is comprehensive in nature and deemed to include to attend the break down any number of times as and when required by user including replacement of any type of spare parts including rewinding of any type of motor. (ii)The unit rate quoted by the tenderer is deemed to be included in the cost of Oil, grease, cotton waste, lugs, small piece of wires/cables, nut, bolt and washers and T&P etc complete. (iii) Contractor must employ minimum of one crane mechanic having electrical knowledge and minimum of five years experience & one helper daily and the cost deemed to be included in the rate quoted by the contractor. (iv) These items shall be measured only when carrying out the maintenance along with documents to be submitted duly signed by Engineer-in-Charge. Log sheet, Daily, Weekly and Monthly Maint records must be maintained as directed by GE |
15 | Material and labour for carrying out load test on the following Cranes with 110% of full load capacity of crane on hoisting long travel and cross travel for checking the performance including loading, unloading and returning the test loads obtained from the concerned unit/firm and submission of test certificate to the department. |
16 | 10 Ton Capacity EOT Crane |
17 | 05 Ton Capacity EOT Crane |
18 | 04 Ton Capacity EOT Crane |
19 | 02 Ton Capacity EOT Crane |
20 | 02 Ton Capacity HOT Crane |
21 | 01 Ton Capacity HOT Crane |
22 | 03 Ton Capacity EOT cum HOT Crane |
23 | 01 Ton Capacity EOT cum HOT Crane |
24 | 0.50 Ton Capacity EOT cum HOT Crane Note forItem Nos 5 to 5.09 : The Unit Rate quoted by the tenderer shall be inclusive of the cost for arranging the load & load testing of each crane as recommended by manufacturer at 110 % of its capacity from authorised/ recognised by State/ Central Govt agencies and testing to be carried out once during the current year contract. |
25 | SIGNATURE OF CONTRACTOR |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail