}

Tender For Rejuvenation Of Water Bodies And Infrastructure Development In Schools And Creating Public Utilities Works ,Nilakottai Block Of Dindigul District, Dindigul-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Rejuvenation Of Water Bodies And Infrastructure Development In Schools And Creating Public Utilities Works ,Nilakottai Block Of Dindigul District. Submission Date for this Tender is 29-11-2022. Infrastructure Work Tenders in Dindigul Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

34802928
Tender For Rejuvenation Of Water Bodies And Infrastructure Development In Schools And Creating Public Utilities Works ,Nilakottai Block Of Dindigul District
Open Tender
Indian
Tamil Nadu
Dindigul
29-11-2022

Tender Details

Rejuvenation Of Water Bodies And Infrastructure Development In Schools And Creating Public Utilities Works , Nilakottai Block Of Dindigul District

Key Value

Document Fees
Refer document
EMD
INR 17000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work : Rejuvenation of Water Bodies and Infrastructure Development in Schools and Creating Public Utilities works ,Nilakottai Block of Dindigul district
Sl. No. Item Description
11 .Name of Work: Desilting, Strengthening of bund and Retaining wall of Kannimar kovil Oorani at Kullichettipatty H/o.Kullichettipatty Estimate Amount Rs 1.50 Lakhs
2Clearing light jungles and clearing away carefully and burning it including all labour charges etc
3Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
4Construction of Retaining wall (Sub Estimate
5Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
6Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
7Cement Concrete 1:3:6 (One Cement, ThreeM.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, ThreeM.Sand and Six hard broken stone jelly).Dummy columns should be at least 1 metre height)
8Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
9Provision for Name Board
10GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
112. Name of Work:Desilting, Strengthening of bund and Retaining wall of Sugumar thottam Oorani at Kullichettipatty H/o.Kullichettipatty Estimate Amount Rs 1.50 Lakhs
12Clearing light jungles and clearing away carefully and burning it including all labour charges etc
13Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
14Construction of Retaining wall (Sub Estimate
15Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
16Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
17Cement Concrete 1:3:6 (One Cement, ThreeM.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, ThreeM.Sand and Six hard broken stone jelly).Dummy columns should be at least 1 metre height)
18Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
19Provision for Name Board
20GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
213.Name of Work: Construction ofAnganwadi building at AlagampattyH/O Jambuduraikottai panchayat Estimate Amount Rs 13.57Lakhs
22Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
23Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
24Filling in Foundation and Basement with Conveyed in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
25Brick work using country bricks of size 83/4"x41/4"x23/4"in cement mortar 1:5 (One cement and fiveM.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
26Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall
27Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel and binding wire)
28R. Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
29Plain Cement Concrete 1:2:4 (one cement, twoM.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
30Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
31Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stoneM.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
32Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mmof approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)
33Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
34Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panellingwherever necessary and as directed by the departmental officers)
35Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and ThreeM.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
36Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
37Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
38Providing Cuddapa Slab including all charges etc. 20mm/30mm thick
39Supplying & Fixing in positionof Indian type Baby Water closet(IWC )
40Supplying & Fixing in positionof European Water closet(EWC )
41Supplying and Fabrication of Steel DoorD (1.00x2.10m)
42Supplying and Fabrication of Steel DoorD (1.10x2.10m)
43Supplying and Fabrication of Steel Door D1 (0.75x1.80m)
44Supplying and Fabrication of Steel Window W (1.2x1.3m)
45Supplying and Fabrication of Steel Ventilator (0.60x0.45m)
46Providing Rain Water Pipe including all labour charges etc.
47Towards Labour charges forfixing of steel doors,
48Towards Labour charges forfixing of steel windows, & Ventilators
49Supplying & Fixing of Teracotta Jally (0.90 x 0.45)
50Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the wallssmooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.(The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
51Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
52Painting two coats over new iron work using synthetic enamel paint without primer including cost and conveyace of all materials to site etc. complete.
53Painting two coats for Black Board including all charges etc. complete
54Supply and fixing of 16 AmpsDPIC switch of 500V grade with Fuse and Nutralon suitable T.W. board with painting of suitable colour with PWD Earthing (SD No.142)
55Supply and run of 2 of 6 sq. mm ( 84/0.30) polythene insulated and PVC unsheeted S.C. Alu cable of 1100 V on 7/20 Gi bearerwirefor Service Connection Main -SD.66
56Supply and run of 2 x1.5sq. Mm(22/.3)PVC insulated SC unsheeted CU. Conductor of 1100Grade in 25mm Dia GI PIPE (Glass"B")suitably Bent at both ends with necessary angle iron upright and end supports for Mains SD 69
57Supply and fixing of 11W CFL lamp for existing BH point. (Data - B) SD 80
58Supply and fixing of W.T. Bulk head fitting complete with guard suitable for lamp with 60 W bulb with PVC unsheated leads from terminal to the fitting - SD. 84
59Wiring with 2 x 1.5 Sq.mm PVC uncheated SC cu.cable of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with T.W. Switch box in flush with wall, covered with nylon sheet of 3mm thick with painting of suitable colour for open Light point & Fan Point SD 17
60Wiring with 2 x 2.5 Sq.mm PVC uncheated SC alu.cable of 650V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with 150 x 100 x 113mm T.W. switch box in flush with wall, covered with nylon sheet of 3mm thick 5 Amps 3 pin non - inte Plug point. SD 36
61Supply and Fixing of Ceiling fan(crompton make) including cost and conveyance of all materials and labour cherges etc complete.Ceiling Fan SD 114
62Supply and Fixing of AC Exhaust fan 300mm sweep complete without provision of hole in the wall Exhaust Fan 300mm SD 115
63Supply and fixing of Main Service board.etc complete.
64Towards for Service Connection for E.B.Deposit etc complete.
65Provision for Cartoon paintings
66Provision for Handrails
67Sub Estimatefor Water supply Arrangements
6863mm PVC pipe 4KSC
6963mm PVC MTA
7063mm PVC bend
71500litre HDPE Tank
72Earth work excavation in all clauses of soil as per SS20B. WaterPipe line
73Labour charges for Laying and Joining PVC pipes including all cost etc complete
74Provision for Name Board
75GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail