Ajmer Development Authority has published Tender For In The First Phase Of Pushkar, The Work Of Drain Through Varaha Ghat Chowk, Brahma Chowk Till The Sump Located At Santoshi Mata Dhani.. Submission Date for this Tender is 25-11-2022. Drainage Tenders in ajmer Rajasthan. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 23-Nov-2022 | Corrigendum-1 | Financial Bid | 25-11-2022 |
Sl. No. | Item Description |
1 | Construction of Storm Water Pumping Station including construction of inlet unit and other necessary complete civil works as per site requirenment including all piping connection to the pumping mainincluding supplying, fixing, installation, testing and commissioning of (a) Required capacity of non-clog submersible pumps (b) Supply, fabrication and fixing of stainless steel (SS-316) Coarse Bar screen (mechanically raked and manual both) with flat bar 50mm X 10mm Spacing of bars 50mm total 2 nos. (c) CI Thimble Mounted Sluice Gate, Manually operated, Rising Spindle type. Sluice gates are as per IS 13349 (d) Electrically Operated Travelling Crane (EOT) (e) MCC Panel for pumps (f) Electrically Operated Travelling Crane (EOT) (g) DG Set of required capacity according to the pumps All items/equipments as per peak flow 40.1 MLD to 45 MLD. Note: Design of Pumping Station for Storm water and waste water discharge shall be provided by the Contractor at his own cost. It shall be vetted by expert from reputed engineering college/MNIT by ADA, Ajmer and cost for the same shall be borne by ADA, Ajmer with complete satisfaction and approval of Engineer In-charge. Already sump is existing which may be repaired by the firm as per site requirement. |
2 | Operation and Maintenance of Pumping Station |
3 | Operator (Three Shifts) |
4 | ITI Person ( Electro-Mechanical ) |
5 | O & M cost for 1st Year |
6 | O & M cost for 2nd Year ( 5% increment on previous year) |
7 | O & M cost for 3rd Year ( 5% increment on previous year) |
8 | O & M cost for 4th Year ( 5% increment on previous year) |
9 | O & M cost for 5th Year ( 5% increment on previous year) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail