}

Tender For Emergency Repairs And Overhauling Servicing Maintenance Of Mes B Vehicles Under Ge M Arakkonam, arakkonam-Tamil Nadu

Military Engineer Services-MES has published Tender For Emergency Repairs And Overhauling Servicing Maintenance Of Mes B Vehicles Under Ge M Arakkonam. Submission Date for this Tender is 29-11-2022. Vehicle Maintenance Service Tenders in arakkonam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

34616408
Corrigendum : Tender For Emergency Repairs And Overhauling Servicing Maintenance Of Mes B Vehicles Under Ge M Arakkonam
Open Tender
Indian
Tamil Nadu
arakkonam
29-11-2022

Tender Details

Emergency Repairs And Overhauling Servicing Maintenance Of Mes B Vehicles Under Ge M Arakkonam

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Nov-2022 Amendment to summary Other 22-11-2022
2 11-Nov-2022 Amentment to schedule of credit Other 22-11-2022
3 11-Nov-2022 Amendment to BOQ BOQ 22-11-2022
4 22-Nov-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 29-11-2022

Key Value

Document Fees
INR 500 /-
EMD
INR 18920.0 /-
Tender Value
INR 9.46 Lakhs /-

BOQ Items

Name of Work: EMERGENCY REPAIRS AND MAINTENACE OF MES "B" VEHICLES UNDER GE (M) ARAKKONAM (Tender ID. 2022_MES_560787_1)
Sl. No. Item Description
1Periodical maintenance (weekly) of following vehicles as per manufacturer recommendation complete all as specified and as directed by Engr-in-charge.
2Eicher (07D-174121P)
3Eicher (07D-174120X)
4Eicher (05D-165174X)
5TATA Mobile (03C-069429A)
6TATA Mobile (05C-076366P)
7TATA Mobile (07C-081148K)
8TATA Mobile (15C-103444W)
9TATA Mobile (15C-103443Y)
10Maruti Suzuki dzire LXI (20B-136245K)
11Enfield bullet (05A-057455L)
12Enfield bullet (05A-057760Y)
13Enfield bullet (11A-061952K)
14Enfield bullet (07A-052279Y)
15Enfield bullet (11A-061953E)
16Hero Honda Splender Plus (14A-068391L)
17Hero Honda Splender Plus (NYA)
18Note for ser item No 1 to 1.16: periodical maintenance includes the following activities (i) Checking the fuel and oil filter ascertaining its condition. (ii) Checking the fan, fan belt and adjusting tension. (iii)Checking the Air filter and cleaning the Air filter. (iv) Checking of oil level and ascertain its condition. (v)Checking the fuel pump timing and adjusting if required. (vi)Checking of fuel tank, fuel pump, injector/carburettor. (vii)Tightening all bolt and nuts and mounting bolts and nuts. (viii)Checking the adjustment of the self starter and dynamo. (ix) Checking the battery distilled water level and topping up to the required level. (x)Checking the radiator and radiator hose and arresting leak if any. (xi)Checking the air pressure in the wheels and arresting leak if any. (xii) Greasing and oiling all bearings/moving parts of suspention, transmission, steering etc (xiii) cleaning engine and check for engine mounting/ any leakages (xiv) Checking tightess of radiator mounting, hoses
19(xv) checking self starter and its mountings (xvi) Checking for wiring system and ignition for wear/damage of insulation and rectify the damage if any (xvii) checking of chases, wheels and break systems. (xviii). service report from authorised service center shall be submitted for every month. (xix).Cost for Highly skilled labours and T&P necessary for maintenance/ checks repairs/ replacement is deemed to be included in the rate quoated by the contractor (xiv).Distilled water,Electrolite, Grease etc for maintenance of vehicle is deemed to be included in the rate quoated by the contractor. (xv).Replacement/top up of any type Oil shall be measured and paid under relevant items as supply only and labour cost is deemed to be included in the above quoted rate. (xvi) Replacement of fuel /Oil/Air filter shall bemeasured and paid as supply only under relevant items and labour cost is deemed to be included in the above quoted rate. (xvii). Spares required for replacement during above maintenance shall be measured and paid under relevant item as supply only and labour cost is deemed to be included in the above quoted rate.
20Supply only Turn signal lamp assy (turn indicator) of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
21Supply only Hub greasing unit kit of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
22Supply only diesel filter set of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
23Supply only Hose flexible for vehicle Eicher complete all as specified and as directed by Engr-in-charge.
24Supply only return hose of oil vaccum pump of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
25Supply only new Bearing set (Centre bearing) complete all as specified and as directed by Engr-in-charge.
26Supply only new V-Belt suitable for cooling fan of vehicle Eicher complete all as specified and as directed by Engr-in-charge.
27Supply only Kit brake lining (320x110) (STD) ALHC of Eicher complete all as specified and as directed by Engr-in-charge.
28Supply only Spring shoe return, F&R-Swan of Eicher complete all as specified and as directed by Engr-in-charge.
29Supply only Air filter set E483TC complete all as specified and as directed by Engr-in-charge.
30Supply only head light Lamp Combination of Eicher complete all as specified and as directed by Engr-in-charge.
31Supply only King Pin Kit of Eicher complete all as specified and as directed by Engr-in-charge.
32Supply only Brake Oil Dot-4 of Eicher complete all as specified and as directed by Engr-in-charge.
33Supply only new Clutch Kit of existing specification/ capacity suitable for Eicher complete all as specified and as directed by Engr-in-charge.
34Supply only new WC KIT FR LH / FR RH as per existing specification complete all as specified and as directed by Engr-in-charge.
35Supply only newRear Minor Kit(LCV) Dia 31.75 complete all as specified and as directed by Engr-in-charge.
36Supply only new Mirror Assy Room Canter-90 suitable for Eicher complete all as specified and as directed by Engr-in-charge.
37Supply only new Gear Box Bushing Kit complete all as specified and as directed by Engr-in-charge.
38Supply only Oil filter for Eicher complete all as specified and as directed by Engr-in-charge. Note for Item 2 to 20: labour cost for replacement is deemed to be included in the rate quoted for item No. 1.01 to 1.03 here-in-before.
39Supply only new Suspension bolt suitable for TATA Mobile complete all as specified and as directed by Engr-in-charge.
40Supply only new Junction Rod end for TATA Mobile complete all as specified and as directed by Engr-in-charge.
41Supply only new Dry unit with assy for TATA Mobile complete all as specified and as directed by Engr-in-charge.
42Supply only Upper ball joint for Tata Mobile complete all as specified and as directed by Engr-in-charge.
43Supply only Low ball joint for Tata Mobile complete all as specified and as directed by Engr-in-charge.
44Supply only Centre pin bracket for Tata Mobile complete all as specified and as directed by Engr-in-charge.
45Supply only Centre pin bush for Tata Mobile complete all as specified and as directed by Engr-in-charge.
46Supply only Brake pad for Tata Mobile complete all as specified and as directed by Engr-in-charge.
47Supply only Cliper hanger for Tata Mobile complete all as specified and as directed by Engr-in-charge.
48Supply only Cliper accessories for Tata Mobile complete all as specified and as directed by Engr-in-charge.
49Supply only Rear brake shoe for Tata Mobile complete all as specified and as directed by Engr-in-charge.
50Supply only Brake pipe for Tata Mobile complete all as specified and as directed by Engr-in-charge.
51Supply only Rear brake disc for Tata Mobile complete all as specified and as directed by Engr-in-charge.
52Supply only Rear brake bracingfor Tata Mobile complete all as specified and as directed by Engr-in-charge.
53Supply only Front Hub bracingfor Tata Mobile and supply and fixing new front Hub bracing and testing complete all as specified and as directed by Engr-in-charge.
54Supply only Rear axcle coil seal for Tata Mobile complete all as specified and as directed by Engr-in-charge.
55Supply only Front coil spring of Tata Mobile complete all as specified and as directed by Engr-in-charge.
56Supply only Rear main spring for Tata Mobile complete all as specified and as directed by Engr-in-charge.
57Supply only Rear spring bush for Tata Mobile complete all as specified and as directed by Engr-in-charge.
58Supply only Rear Shocker assy for Tata Mobile complete all as specified and as directed by Engr-in-charge.
59Supply only water pump accessories complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
60Supply only Oil pump accessories complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
61Supply only Gear box mounting complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
62Supply only Gear shifter shaft complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
63Supply only Clutch plate complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
64Supply only Door lock complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
65Supply only Release bearing for Tata Mobile complete all as specified and as directed by Engr-in-charge.
66Supply only Silencer accessories complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
67Supply only Shocker absorber complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
68Supply only Air cleaner filter complete for Tata Mobile complete all as specified and as directed by Engr-in-charge.
69Supply only Side mirror for Tata Mobile complete all as specified and as directed by Engr-in-charge.
70Supply only Diesel filter for Tata Mobile complete all as specified and as directed by Engr-in-charge.
71Supply only Oil filter for Tata Mobile complete all as specified and as directed by Engr-in-charge.
72Supply only Brake oil for TATA mobile complete all as specified and as directed by Engr-in-charge. Note for Item 21 to 54: labour cost for replacement is deemed to be included in the rate quoted for item No. 1.04 to 1.08 here-in-before.
73Supply only rear view mirror complete suitable for Tata Mobile /Eicher complete all as specified and as directed by Engr-in-charge.
74Supply only Horn kit complete suitable fo Tata mobile/ Eicher complete all as specified and as directed by Engr-in-charge.
75Supply only Engine oil for Eicher/ TATA Mobile complete all as specified and as directed by Engr-in-charge.
76Supply only Coolant for Eicher/ TATA Mobile complete all as specified and as directed by Engr-in-charge.
77Supply only Transmission oil for Eicher/ TATA Mobile complete all as specified and as directed by Engr-in-charge.
78Supply only Turning lamp for TATA Mobile complete all as specified and as directed by Engr-in-charge.
79Supply only Battery terminal for all vehicles complete all as specified and as directed by Engr-in-charge.
80Supply only Battery Lead for all vehicles complete all as specified and as directed by Engr-in-charge.
81Supply only Gear box oil for Eicher/ TATA Mobile complete all as specified and as directed by Engr-in-charge. Note for Item 21 to 63: labour cost for replacement is deemed to be included in the rate quoted for item No. 1.04 to 1.09 here-in-before.
82Supply only the following items are for incorporating in Item No. 1.10 to 1.16 here in before complete all as specified and as directed by Engr-in-charge. Note: labour cost for replacement is deemed to be included in the rate quoted for item No.01 here-in-before.
83Gasket kit for Hero honda / motor cycle RE .
84Chain set with chain for Hero honda / motor cycle RE
85Clutch disc for Hero honda / motor cycle RE
86Oil seal kit for Hero honda /motor cycle RE
87Spark plug for Hero honda / Motor cycleRE
88Timing push rod for Hero honda
89Engine oil for Hero honda/ Motor cycle RE
90Bty terminal for Hero honda/ Motor cycle RE
91Bty Lead for all vehsfor Hero honda/ Motor cycle RE
92Nut & Bolts of various size for Hero honda/ Motor cycle RE
93Material and labour for repairs and servicing of self starter including replacement of worn out/ unserviceable parts complete all as specified and as directed by Engr-in-charge. Note: Spares required will be measured and paid separately under relevant item No. 69.01 to 69.03 of the schedule as supply only labour cost is deemed to be included in the above item 68.
94Supply only Soleniod switch any type for self starter.
95Supply only Carbon brush set any type with brush holder
96Supply onlyDrive End Plunger
97Material and labour for replacement of work out spares like Bendex drive, carbon brush, solinoid coil, Armature including rewinding stator including necessary testing complete all as specified and as directed by Engr-in-charge.
98Material and labour for disconnecting, removing radiator assembly from the Vehicle Eicher /Tata Mobile and descaling the radiator throughly with CTC solution/ any other chemical solvent agent, stopping of leakeage at place of copper cores and tubes by brazing including scapping and re-installing after repair including testing complete all as specified and as directed by Engr-in-charge.
99Material and labour for dismantling unserviceable Element filter of Air Compressor and supply and fixing new Element filter and testing complete all as specified and as directed by Engr-in-charge.
100Dismantling unserviceable Pully CI QG of Air Compressor and supply and fixing new Pully CI QG and testing complete all as specified and as directed by Engr-in-charge.
101Dismantling unserviceable Body valve control of Air Compressor and supply and fixing new Body valve control and testing complete all as specified and as directed by Engr-in-charge.
102Dismantling unserviceable Valve bypass thermal pin of Air Compressor and supply and fixing new Valve bypass thermal pin and testing complete all as specified and as directed by Engr-in-charge.
103Material and labour for tyre rotation including wheel balancing for all vehicles as per manufacturer recommendation at company authorized shop including submission of report complete all as specified and as directed by Engr-in-charge.
104Supply only Wiper Blade for TATA Mobile complete all as specified and as directed by Engr-in-charge. Note for Item 73: labour cost for replacement is deemed to be included in the rate quoted for item No. 1.04 to 1.08 here-in-before.
105Supply only battery 12V 92Ah for Eicher complete all as specified and as directed by Engr-in-charge. Make: Exide/Amaron/TATA
106Supply only battery 6V, 12Ah for Eicher complete all as specified and as directed by Engr-in-charge. Make: Exide/Amaron/TATA
107Material and labour for repairs to upholstry work for Two wheeler as per existing complete all as specified and as directed by Engr-in-charge.
108Material and labour for removing wheel complete of any vehicle with tyre and tube and taking out tube for repair and testing for leakage after repair including reassembling after repair complete all as specified and as directed by Engr-in-charge.
109Material and labour for dismantling and repairs to fuel injection feed pump of TATA Mobile including replacement of worn out spares like delivery valves, Nozzles, bearings, fly weight, packing kit, and copper washer kit and including reassembling and recalibration of pump complete all as specified and as directed by Engr-in-charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail