National Hydroelectric Power Corporation Limited has published Painting Of 04 Nos. Gantry Crane And 07 Nos. Upstream Pathway Girder Of Tld-Iii Ps. Submission Date for this Tender is 22-12-2022. Cranes Tenders in Kalimpong West Bengal. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-Oct-2022 | Corrigendum-1 | Date | 04-11-2022 |
2 | 04-Nov-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 11-11-2022 |
3 | 17-Nov-2022 | Corrigendum2 | Date | 02-12-2022 |
4 | 06-Dec-2022 | Corrigendum-3 | Date | 22-12-2022 |
Sl. No. | Item Description |
1 | Removing old paint from blistered painted surface of steel or other metal by chipping including scraping and cleaning and exposing the original surface (Excluding Scaffolding). |
2 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (Excluding Scaffolding). |
3 | (a) Painting with best quality synthetic enamel paint of approved make (b) On steel or other metal surface and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary-(iv) Two coats (with any shade except white) (Excluding Scaffolding) |
4 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose. (7 mtr.) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail