Rural Works Department has published Construction Of R.I. Office-Cum-Residence Building, At Hadagarh In The District Of Keonjhar For The Year 2022-23 C. Submission Date for this Tender is 22-09-2022. Building Work Tenders in anandapur Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earthwork in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of the foundationincluding cost of all labourrequired for the work etc. complete with all other machineries required for the work and stacking the excavated materials away from the working area as directed by the Engineer-in-Charge |
2 | Supplying and filling foundation and plinth with sand well watered & rammed with cost, conveyance, royalty and taxes of all materials labour required for the work as per specification anddirection of the Engineer-in-Charge. |
3 | Providing Cement Concrete (1:4:8) in foundation with 4cm nominal size of hand broken hard granite metal of approved quality from approved quarry including hoisting, lowering, and laying in postition in layers not exceeding 150mm. thick with proper packing and ramming to proper slope and level including watering, curing with cost, conveyance, royality, taxes, labour, T&P and all other materials required for the work, finishing the exposed surface smooth, providing grooves and beads where ever necessary etc. complete in all respect as per the specification andas per direction of the Engineer-in-Charge (C.wall) |
4 | Providing Cement Concrete (1:3:6) in foundation with 4cm nominal size of hand broken hard granite metal of approved quality from approved quarry including hoisting, lowering, and laying in postition in layers not exceeding 150mm. thick with proper packing and ramming to proper slope and level including watering, curing with cost, conveyance, royality, taxes, labour, T&P and all other materials required for the work, finishing the exposed surface smooth, providing grooves and beads where ever necessary etc complete as per direction of the Engineer-in-charge. |
5 | Fly Ash bricks masonary (1:6) using 25cm x 12cm x 8 cm size bricks having crushing strength not less than 75 kg/cm2 including splays cutting, circular, moulding and corbelling, champhering and similar such type of works watering and curing etc. complete, including, cost, conveyance, royalities and taxes of all materials and cost of all labour and T & P required for the work etc. complete as perthe specification as directed by the Engineer-in-Charge (Ground Floor) |
6 | Superstructure(Ground Floor) |
7 | Superstructure(1st Floor) |
8 | Superstructure(2nd Floor) |
9 | Compound wall |
10 | R.C.C. M-20 having a minimum compressive strength(in work test) 200 Kg/cm.2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with I.S. 456 and I.S.516 using 20mm & down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days centering, shuttering, finishing the exposed surfacs inculding ceiling, smooth, providing grooves beads where necessary and providing, required No of fan Hooks as directed including, cost, conveyance, royalities and taxes of all materials and cost, of alllabour and T & P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-Charge. (ColumnBase) |
11 | Ground Floor Column& Beam |
12 | First Floor Column& Beam |
13 | 2nd Floor Column& Beam |
14 | Ground Floor Plinth Band |
15 | Ground Floor Lintel Band |
16 | First Floor Lintel Band |
17 | 2nd Floor Lintel Band |
18 | Ground Floor Chajja |
19 | First Floor Chajja |
20 | 2nd Floor Chajja |
21 | Ground Floor Roof Slab |
22 | First FloorRoof Slab |
23 | 2nd Floor Roof Slab |
24 | Ground Floor Stair Case |
25 | First Floor Stair Case |
26 | Cutting, streightening the bent up M.S./TSRodsbending, binding, welding, jointing if necessary and tying the grills and placing in position, as required for R.C.C work and for providing required No. of Fan Hooks hoisting, lowering, laying including, cost, conveyance, taxes of all M.S. Rods or Tor steel and binding wires of 118 to 20 gauge required for the work bending, binding and tying the grills in all floors (Payment will be made on weight of M.S. Rods or Tor steel only and no separate payment will be made towards the weight of binding wires as per direction of the Engineer-in-Charge (Ground Floor) |
27 | First Floor |
28 | 2nd Floor |
29 | 16 mm thick cement plaster(1:6) over brick massonary finished smooth, after racking out the joints including watering, and curing with cost, conveyance, royalities and taxes of all materials, and cost of all labour and T & P required for the work complete as directed by the Engineer-in-Charge(Ground Floor) |
30 | First Floor |
31 | 2nd Floor |
32 | 12 mm thick cement plaster (1:6) over brick massonary finished smooth, after racking out the joints including watering, and curing with cost, conveyance, royalities and taxes of all materials, and cost of all labour and T & P required for the work complete as directed by the Engineer-in-Charge (Ground Floor) |
33 | First Floor |
34 | 2nd Floor |
35 | 20 mm thick C.P in CM ( 1:4) in grading plaster including cost of all labour , material etc complete as per direction of the Engineer-in-Charge (First Floor) |
36 | 2nd Floor |
37 | 2.5cm Damp proof course with CC (1:2:4 ) using 12mm size black hard crusher broken granite chips of approved quality and from approved chips of approved quality and from approved quarryincluding cost conveyance and royality of all materials with all taxes and all labour with T&P required for the work etc. complete as per direction of the Engineer-in-Charge. (Ground Floor) |
38 | First Floor |
39 | Fixing Vetrified floor tiles having size (600mm X 600mm) in floors treads or steps on 25 mm thick bed of cement morta (1:1) with neat cement slury etc complete as per direction of the Engineer-in-Charge.(Ground Floor) |
40 | First Floor |
41 | 2nd Floor |
42 | Supplying, fitting & fixing ceramic wall tiles in dados skirting and risers of steps on 12mm thick c.p.(1:3) including cost, conveyance& taxes of all material, labour etc complete as per specification and direction of the Engineer-in-Charge. (Ground Floor) |
43 | First Floor |
44 | 2nd Floor |
45 | Fixing chequred tiles on 12 mm thick bed of cement morta (1:3) with neat cement slury etc complete as per direction of the Engineer-in-Charge. (Ground Floor) |
46 | Supplying and fitting-fixing of Un-plasticised poly vinyl chloride (UPVC) (FENESTA / NCL / VEKA LTD.). Casement Door - 60- Series duly manufactured using UPVC reinforced profiles of 60mmx55mmx2.5mm for outer frames, 102mmx60mmx2.25mm for casement door sash profile and 74mmx60mmx2.5mm mulion profile capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thicknessat site etc, including cost and conveyance of all materials, accessories , labour charges, materials and product confirming to ASTM D 638 -14, EN-477-95 and other applicable codes and standards. (Ground Floor) |
47 | First Floor |
48 | Supplying and fitting-fixing of Un-plasticised poly vinyl chloride (UPVC) (FENESTA / NCL / VEKA LTD.). Three track -Three panel sliding window-60-series duly manufactured using UPVC reinforced profiles of 108mmx45mmx2.5mm of outer frames and window sash of 39 mmx58mmx2.5mm capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated and welded through fushion welding the window frame shall be fitted with 6mm thickat site etc, including cost and conveyance of all materials, accessories , labour charges, materials and product confirming to ASTM D 638 -14, EN-477-95 and other applicable codes and standards. (Ground Floor) |
49 | First Floor |
50 | Cement washing one coat with cement over new plaster surface including all cost , conveyance , royalties, taxes of all labour , material etc complete as per direction of the Engineer-in-Charge(Ground Floor) |
51 | First Floor |
52 | Distempering two coats to wall with approved distemper of approved shade including cost, conveyance& taxes of all material, labour etc complete as per specification and direction of the Engineer-in-Charge(Ground Floor) |
53 | First Floor |
54 | 2nd Floor |
55 | Finishing wall surface of wall with Acrylic Wall Putty (Water based) of approved make and finished smooth and even surface to receive painting including cost conveyance and royalties of all materials etc complete as per direction of the Engineer in Charge.(Ground Floor) |
56 | Finishing walls with weather coat of approved shade on new work two coat over acoat of primer to give an even shade including costof all materials, labour charges, T&P etc required for the work complete as per direction of the Engineer-in-charge. (Ground Floor) |
57 | First Floor |
58 | 2nd Floor |
59 | Cement concrete work (1:2:4) using 12mm to 20mm size black hard crusher broken granite chips of approved quality and from approved chips of approved quality and from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days including finishing the exposed surfacs including, cost, conveyance, royalities and taxes of all materials and cost, of alllabour and T & P required for the work etc. complete as per direction of the Engineer-in-Charge (Ground Floor) |
60 | 2nd Floor |
61 | Providing , fitting & fixing Steel Angle Iron window frame with M.S grill manufactured from standard rolled steel angle section 40 mm X 40 mm X 6 mmcornered of the frame duly metered and electrically welded with fish tail hold fasts made out of M.S flats of size 200 mm X 50 mm X 30 mm wide & 5 mm thick at the rate of 4 nos per frame with M.S hinges of size 75 mm & 14 SWG thick at the rate of 3 nos for each single leaf shutter tower bolt ring & M.S Grills made out of 19 mm x 5 mm flat properly welded to the window frame with one coatof anti corrosive red oxide zinc chrome primere as per direction of Engineer - in - Charge. (Ground Floor) |
62 | First Floor |
63 | 2nd Floor |
64 | Painting twocoats with approved paint over a coat of primer of any approved shade with cost, conveyance, taxes of all materials, all labour and T&P required for the work including the cost of primer all other materials aetc complete as per direction of the Engineer-in-Charge(Ground Floor) |
65 | First Floor |
66 | 2nd Floor |
67 | Providing & laying 80mm thick factory made cement concrete interlocking paver block of M-30 grade made by block makine machine with strong vibratory compaction of approved size, design & shape, laid in required |
68 | Earth work in in hard soilor Gravelly soil in embankments , roads etc within 50 m initial lead & 1.5 mtr initial lift including rough dressing & breaking clods to max 5cm to 7 cm & laying in layers not exceeding 0.30m in depth as per specification approved by the department along with proper compaction with P.R.R including hire & running chargs of P.R.R ( Measurements to be taken on finished compacted section of the fill) |
69 | Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32 mm x 2 mmetc complete as per direction of the Engineer-in-Charge (Ground Floor) |
70 | First Floor |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy