Construction Of Annex New Toilet Block To Old (North Side) Ladies Hostel, mysuru-Karnataka

All India Institute Of Speech And Hearing has published Construction Of Annex New Toilet Block To Old (North Side) Ladies Hostel. Submission Date for this Tender is 05-10-2022. Toilet Bathroom Tenders in mysuru Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

33936558
Construction Of Annex New Toilet Block To Old (North Side) Ladies Hostel
Open Tender
Indian
Karnataka
mysuru
05-10-2022

Tender Details

Construction Of Annex New Toilet Block To Old (North Side) Ladies Hostel

Key Value

Document Fees
INR 500 /-
EMD
INR 29720.0 /-
Tender Value
INR 14.85 Lakhs /-

BOQ Items

Name of Work:
Sl. No. Item Description
1Civil Items
2Earth work in excavation bymechanicalmeans (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m
3Dismantling cement concrete flooring or plain cement concrete work including removing and conveying the debris to distance up to 200m (within average thickness of 15 cms).Including cost of materials, labour, HOM complete as per specifications
4Dismantling brick masonry in cement mortar and stacking the bricks within a radius of 50m and removing the debris to a distance upto 200m
5Wall bores in size stone masonry/RCC work . including cost of materials, labour, HOM complete as per specifications.- - upto 45 cm thick
6Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m
7Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size
8providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
9Providing and constructing granite/trap/basalt size stone masonry in foundation with cement mortar, stone hammered dressed in courses not less than 20 cms high, bond stones at 2m. apart in each course including cost of materials, labour, curing complete as per specifications
10Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : 6.4.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 7809.25 6.4.2 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 7590.45
11Half brick masonry with common burnt clay F.P.S. (non modular) bricksof class designation 7.5 in superstructure above plinth level up to6 floorV level.6.13.1 Cement mortar 1:4 (1 cement :4 coarse sand)
12Centering and shuttering including strutting, propping etc. and removal of form for all heightsColumns, Pillars, Piers, Abutments, Posts and Struts
13Centring and shuttering including strutting,propping etc.,and removal of form for all heights.Lintels, beams, plinth beams, girders, bressumers andcantilevers
14centring and shuttering including strutting,propping etc.,and removal of form for all heightsSuspended floors, roofs, landings, balconies and access platform
15Steel reinforcement for R.C.C. work including straightening,cutting,bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more
16Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved designmix,including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength anddurabilityas per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately).All works above plinth level up to floor five level
17Providing and laying anti skid Glazed Ceramicfloor tiles of size 300x300 mm or more (thickness to be specified by the manufacturer), of 1st quality conforming toIS: 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on20mm thick Cement Mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including pointing the joints with white cement and matching pigments etc., complete
18Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing inwhite cement mixed with pigment of matching shade complete
19Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete
20Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross-section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness .The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2 mm thick and shallbe filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame
2130 mm thick Fiberglass Reinforced Plastic (F.R.P.) flush door shutter in different plain and wood finish made with fire retardant grade unsaturated polyester resin, moulded to 3 mm thick FRP laminate all around, with suitable wooden blocks inside at required places for fixing of fittings and polyurethane foam (PUF)/ Polystyrene foamto be used as filler material throughout the hollow panel, casted monolithically with testing parameters of F.R.P. laminate conforming to table - 3 of IS: 14856, complete as per direction of Engineer-in-charge
22Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 110mm dia. including all fixtures
23Providing 15mm thick cement plaster in single coat with cement mortarto brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications
24Providing and fixing factory made uPVC white colour fixed glazed windows/ventilators comprising of uPVC multi-chambered frame andmullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll formingprocess of required length (shape & size according to uPVC profile),uPVC extruded glazing beads of appropriate dimension, EPDM gasket,G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profileof frame shall be mitred cut and fusion welded at all corners, mullion (ifrequired) shall be also fusion welded including drilling of holes for fixing hardware"s and drainage of water etc. After fixing frame the gap betweenframe and adjacent finished wall shall be filled with weather proof siliconsealant over backer rod of required size and of approved quality, allcomplete as per approved drawing & direction of Engineer-in-Charge
25Providing and laying integral cement based water proofing treatmentincluding preparation of surface as required for treatment of roofs,balconies, terraces etc consisting of following operations:(a) Applying a slurry coat of neat cement using 2.75 kg/sqm ofcement admixed with water proofing compound conforming toIS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height includingcleaning the surface before treatment.(b) Laying brick bats with mortar using broken bricks/brick bats 25mm to 115 mm size with 50% of cement mortar 1:5 (1 cement: 5 coarse sand) admixed with water proofing compoundconforming to IS : 2645 and approved by Engineer-in-chargeover 20 mm thick layer of cement mortar of mix 1:5 (1 cement:5 coarse sand ) admixed with water proofing compoundconforming to IS : 2645 and approved by Engineer-in-charge torequired slope and treating similarly the adjoining walls upto300 mm height including rounding of junctions of walls andslabs.(c) After two days of proper curing applying a second coat of cementslurry using 2.75 kg/ sqm of cement admixed with mm height including rounding of junction of walls andslabs.(c) After two days of proper curing applying a second coad of cementslurry using 2.75 kg/sqm of cement admixed with water proofingcompound conforming to IS : 2645 and approved by Engineerin-charge.(d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofingcompound conforming to IS : 2645 and approved by Engineerin-charge including laying glass fibre cloth of approved qualityin top layer of plaster and finally finishing the surface with trowelwith neat cement slurry and making pattern of 300x300 mmsquare 3 mm deep. (e) The whole terrace so finished shall be flooded with water for aminimum period of two weeks for curing and for final test.“Allabove operations to be done in order and as directed andspecified by the Engineer-in-Charge : 22.7.1 With average thickness of 120 mm and minimumthickness at khurra as 65 mm
26providing and fixing unplasticised PVC pipes with working pressure 10kg/sqcm with pipe fittings,clips,making good the floor including cost of all materials,laborcharges,HOM and testing complete as per specifications 90mm OD
27providing and fixing unplasticised PVC pipes with working pressure 10kg/sqcm with pipe fittings,clips,making good the floor including cost of all materials,laborcharges,HOM and testing complete as per specifications 110mm OD
28Constructing brick masonry road gully chamber 45x45x77.5 cm withbricks in cement mortar 1:4 (1 cement : 4 coarse sand ) with precastR.C.C. vertical grating complete as per standard design :19.28.1 With common burnt clay F.P.S. (non modular) bricks ofclass designation 7.5 each 5794.85
29Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & coldwater supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing ofjointscomplete as per direction of Engineer in Charge. Concealed work, including cutting chases and makinggood the walls etc. 25mm dia
30Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & coldwater supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. EXTERNAL WORK 25mm dia and 32mm
31Providing and finishing external wall in two coats with waterproof cement paint of approved brand and shade to give an even shade after thoroughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, complete as per specifications
32Providing and applying enamel metal paint two coats (excluding priming coat) on new steel or other metal surface brushing to give an even shade, cleaning oil, grease, dirt and other foreign matter, sand papering, includingcost of materials, labour, scaffolding complete as per specification
33Providing and applying painting in two coats with plastic emulsion paint of approved brand with primer on wall surface to give an even approved shade afterthoroughly brooming the surface, free from from mortar drops and other foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour, complete as per specifications
34Epoxy based bonding adhesive for filling spacer joints of floor tiles
35Licenced plumber with tools for fixing sanitary and water supply fittings
36Mazdoor heavy for assisting plumber
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail