Construction Of Water Supply Arrangement For Arsenic Affected Habilitation With Solar Power Connection By Construction / Installation Of Cpp Unit Including Tubewell With Submersible Pump And Raw Water As Concentration Upto 0.15Ppm At Bazarshow Ghoshpara B, murshidabad-West Bengal

West Bengal Agro Industries Corporation Limited-WBAIC has published Construction Of Water Supply Arrangement For Arsenic Affected Habilitation With Solar Power Connection By Construction / Installation Of Cpp Unit Including Tubewell With Submersible Pump And Raw Water As Concentration Upto 0.15Ppm At Bazarshow Ghoshpara B. Submission Date for this Tender is 29-09-2022. Pure Elemental Gases Tenders in murshidabad West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

33896571
Construction Of Water Supply Arrangement For Arsenic Affected Habilitation With Solar Power Connection By Construction / Installation Of Cpp Unit Including Tubewell With Submersible Pump And Raw Water As Concentration Upto 0.15Ppm At Bazarshow Ghoshpara B
Open Tender
Indian
West Bengal
murshidabad
29-09-2022

Tender Details

Construction Of Water Supply Arrangement For Arsenic Affected Habilitation With Solar Power Connection By Construction / Installation Of Cpp Unit Including Tubewell With Submersible Pump And Raw Water As Concentration Upto 0.15Ppm At Bazarshow Ghoshpara Beside Durgamandir Shaktipur G.P.Beldanga-Ii Block.

Key Value

Document Fees
INR 885 /-
EMD
INR 25850.0 /-
Tender Value
INR 12.90 Lakhs /-

BOQ Items

Name of Work: Construction of Water supply arrangement for arsenic affected habilitation with solar power connection by construction/installation of CPP unit including tubewell with submersible pump and raw water as concentration upto 0.15ppm at Bazarshow Ghoshpara beside Durgamandir Shaktipur G.P.Beldanga-II Block.
Sl. No. Item Description
1Construction/ installation of CPP unit consists of: Providing and installation of 125 min x 40 mm dia. tubewell with waterjet systemwith supplyand instalation of all PVC pipes and strainers ofapproved make (medium duty) conforming to ASTMD - 1785 with all necessary accessories, specials with adapter conforming to lS : 12818 of adequate length, with supply of all pipes, strainers and other materials (steel cutter piece, plug, reducer, housing clamp of M.S. Plate etc.), labours, carriage, collection of tube well water and performing bacteriological and chemical tests (including Arsenic test) all complete as per direction of the Engineer-in-charge.(Total depth of tubewell - 70.0m, 125 mm dia. Housing pipe - 42.0 m; 4o mm dia. Well pipe - 22.0 m; 4o mm dia. Strainer - 6 m.).
2Supplying, installation and lowering in position Solar Panel based AC Submersible pumping machinery (preferably with stainless steel fabricated componets) with solar cable & cable connector kit, PV Panel (IEC 61215:2015 certified), Controller, Overhead protectior, Dry run protection, Auto Restart facility, Float Switch with Water Level sensors, software for start-up of motors, making necessary connections with treatment units with supplying G.I. Controller box and external electrical (GRID) connections with necessary wiring,switch board and supplying 32 mm dia. PVC column pipe 42 m length as per direction of the EIC. (i) Solar Panel configuration: 4 panels of 325 Wp ( 72cell) each (Solar Panel to be installed on top of M.S.Supporting structure); (ii) Submersible pu mp capacity 1.0 H P, 14 Stage, 32 mm outlet dia (preferably oil filled) KSB/Crompton or renowned brand. Each pipe 42 m length as per direction of the EIC. i) Solar Panel configuration: 4 panels of 325 Wp ( 72
3Supplying and erecting in position M.S. Supporting structure for supporting PVC Tanks (as shown in the Dept. drawing) and Solar Panel, 5 mm M.S. chequerred Plate at top platform (2m X 2m ), M.S. Laddet (suitably placed), Supplying and installation in position PVC Tanks, all necessary pipeline connections with 32/25 mm dia. PVC pipe from Tubewell to delivery through Treatment unit, all complete with all pipes, specials, valves, 3 nos. Bib Cocks fitted to treated water tank all complete as per direction of the E-in-C.
4Construction of 3 m X 3 m X 0.3 m platform around Arsenic treatment Units and MS supporting structure including Fencing and Gate with locking arrangement all complete as per departmental drawing.
5Construction of Surface Drain about 15 m length and 2 numbers of Soak Pit of 900 mm dia. and 775 mm overall depth including 75 mm dia. UPVC drain pipe 5 m long as per drawing no. P&DD-IV/292/12-14) and as per direction of the EIC.
63000 Lit Raw water tank and 2000 Lit treated water tank.
7Supplying, installation, commissioning and trial run (for 3 months) of Water Treatment unit for removal of Iron and ArsenicbelowpermissiblelimitasperIS:10500-2012 incJuding supply of all required media (vessels design for latest IS codes with minimum 3 mm thick), Food grade epoxy coating inside, outside Painting with best quality synthetic enamel paint of approved make, all necessary 25 mm dia. G.I pipeline (medium duty), valves, 3 bib cocks fitted after each tretment unit to collect water sample for testing, meters and making arrangement of connection with existing pipeline as per specification and drawing and direction of the EIC. (Quantity/ volume of all media are mentioned in the departmental drawing and to be followed strictly. Treatment unit size: 1. Oxidation chamber: 350 mm dia X 1200 mm depth (1 no.) 2. Pre Filtration unit: 350 mm dia X 1200 mm depth (1 no.) 3. Arsenic treatment unit: 350 mm dia X 1200 mm depth+ 250 mm dia X 1200 mm depth. 4. Backwash chamber: 500 mm dia X 1200 mm depth (1 no.) 5. UV treatment unit of adequate capacity. Adsorption capacity of Arsenic media should not be less than 45g Arsenic per kg of Arsenic Media(dry weight) and must have certificate from CSIR/IIT or other Government reputable Institutions.Imported media must have NSF certification in addition to the above certificate.
8Operation and maintenance of entire installations for 5 years (except day to day operation) which includes: a) Cleaning of site, checking of valves and pipes, checking of electrical connections, cleaning solar panel etc Twice in a month; b) Replacement of damaged Valves, Bib cocks and any other parts of all units as and when necessary; c) Repair/ replacement of pumping machinery i/c controller, PV Panel, wiring, switches etc. as and when necessary; d) Painting of M.S. structure and all painted surface at the end of each year.
9Complete overhauling of Oxidation Vessel, Pre-Filter Vessel and Back-wash Vessel as and when required by engagement of labour & equipments (the work to be executed on written permission from the E-in-C.) which includes: a) Complete removal of media from the vessels, breaking of Clots and thorough washing and cleaning ofall media; b) Placement of all media with 10% fresh new media (lost during washing) including cost and carriage of the fresh new media.
10Complete replacement of Mn02 and Green Sand in the Oxidation Vessel and Pre-Filter Vessel as and when required by engagement of labour & equipments (the Work to be executed on written permission front the E-in-C.) which includes: Complete removal of old media from the vessels and placement of new media including cost and carriage.
11Engagement of labour for daily operation @Rs.100.00 per day for 5(five) years.
12Sub Total
13GST 12%
14CESS 1%
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail