Rural Development Department has published Construction Of Drainage With Vertical Soak Pit At T.Palur Puthu Colony East Street In T.Palur Panchayat For 1 No In Package No.Tn 30-30 In T.Palur Block Of Ariyalur District Under Agamt Ii 2021-22 Construction Of Drainage With Vertical Soak Pit At T.Palu. Submission Date for this Tender is 01-09-2022. Drainage Tenders in ariyalur Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Aug-2022 | Construction of Drainage with Vertical Soak Pit at T.Palur Puthu colony east street in T.Palur Panchayat for 1 no in Package No.TN 30-30 in T.Palur Block of Ariyalur District Under AGAMT II 2021-22 | Date | 01-09-2022 |
Sl. No. | Item Description |
1 | 1.Construction ofDrainage at T.Palur colony pudhu Theru East street in T.Palur Panchayat. Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth |
2 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification |
3 | Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification |
4 | Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification |
5 | Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications |
6 | Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete. |
7 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth 0.30m depth |
8 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth 0.30-0.60m depth |
9 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth Above 0.60m depth |
10 | Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification |
11 | Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification |
12 | Brickwork in Cement Mortar 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidental charges etc., complete. |
13 | Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete. |
14 | Filling the soakpit with 225mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete. |
15 | Filling the soakpit with 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete. |
16 | Filling the soakpit with 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete. |
17 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification |
18 | Supply and fixing of RCC Rings 900mm dia including cost and conveyance of all materials to work site and all labour charges etc., complete. |
19 | Supply and fixing of RCC Rings cover slab 900mm dia including cost and conveyance of all materials to work site and all labour charges etc., complete. |
20 | Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications |
21 | Provision for Name board |
22 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy