Ministry Of Road Transport And Highways has published Consultancy Services For Preparation Of Detailed Project Report For Construction Of 4 Lane Bypass Starting From Its Junction With Gondia Tirora Road Nh 753 And Terminating At Its Junction With Balaghat - Gondia Road Nh 543 In Gondia District In The. Submission Date for this Tender is 08-09-2022. Detail Project Report Tenders in gondia Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Aug-2022 | Date Extension | Date | 08-09-2022 |
Sl. No. | Item Description |
1 | Professional Staff : |
2 | Team Leader cum Senior Highway Engineer |
3 | Senior Bridge Engineer |
4 | Highway cum Pavement Engineer |
5 | Material-cum-Geotechnical Engineer- Geologist |
6 | Senior Survey Engineer |
7 | Traffic and Safety Expert |
8 | Environmental Specialist |
9 | Quantity Surveyor/ Documentation Expert |
10 | Land Acquisition Expert |
11 | Utility Expert |
12 | Sub Professional Staff : 4 Nos. (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate) |
13 | Support Staff : |
14 | Office Manager |
15 | Typist |
16 | Office Boy |
17 | Night Watchman |
18 | Transportation (Fixed Cost): 2 Nos. Ofvehicles (SUV Type) hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. |
19 | For Conusltant: Mahindra Bolero or Equivalent (Not more than 2 years old) |
20 | For Conusltant: Innova or Equivalent (Not more than 2 years old) |
21 | Duty Travel to Site (Fixed Cost) : |
22 | Office Rent (Fixed Cost) : Minimum area of office - 150 sq.m (The rent cost includes maintenance, cleaning, Electric Bill, Water Bills, repairs, etc.) |
23 | Office Supplies, Utilities and Communication : |
24 | Office Supplies Drafting |
25 | Supplies Computer |
26 | Running Costs |
27 | Domestic & International Communication |
28 | Office Furniture and Equipment (Rental) : (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include 4 executive tables, 5chairs, 5 visitor chairs, 3 steel almirahs, 4 computer furniture, 1 conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (4 No., Intel i5, 19’’ colour TFT,RAM-8 GB, SSD-512 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 10 Business, pre-loaded anti-virus etc.), 1 Brother laser printers with scanner (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (3 no., 1.5 Ton), Water Coolers (as required)etc. |
29 | Reports and Document Printing (Fixed): |
30 | Monthly Report (3 Per Month) |
31 | Inception Report & QAP |
32 | Environment and Social Impact Screening Report |
33 | Draft Feasibility Report |
34 | Final Feasibility Report |
35 | Strip Plan with L.A. Reports |
36 | Draft LA and Clearances Report |
37 | Final Land ClearancesReport |
38 | Draft Environmental Assessment report & RAP |
39 | Final Environmental Assessment report & RAP |
40 | Draft Detailed Design Report& Drawings etc. (& Draft EMP) |
41 | Draft Bidding Documents(& Draft EMP) |
42 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.(& Final EMP) |
43 | Final Bidding Documents |
44 | Draft3(a), 3(A) and 3(D) notification for land acquisition (3 copies each) |
45 | LA & Clearances II Report |
46 | Survey and Investigation (Fixed): |
47 | A. Topographical Survey : |
48 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer etc. |
49 | Detailed topographic surveys using mobile/aerial LiDAR or better technology |
50 | B. Topographical Survey : |
51 | Road and Bridge Inventory |
52 | FWDTest and Pavemen tEvaluation |
53 | Roughness Survey |
54 | Axle Load Survey |
55 | Material Survey and Investigation |
56 | Sub-grade Investigation |
57 | Traffic Survey |
58 | Socio-economic & Census Survey / Studies |
59 | Land Acquisition Studies |
60 | Any other investigations/surveys |
61 | *Sub-Soil Investigation(Boring) a) Boring in all type of soils (other than hard rock): 900 mtr b) Boring in Hard Rock : 250 Mtr |
62 | C. NetWork Survey and GPR : |
63 | Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. (For entire project length) |
64 | GPR Survey for detection of underground utilities.(For entire project length) |
65 | Cost of supply and fixing Boundary Pillars : |
66 | Procuring and fixing boundary pillars and its installation, complete in all respect asper IRC:25,1967: Wherever the proposed alignment follows the existing alignment,the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highwayand/or construction of New Bypasses, Consultant shall fix boundary pillars along theproposed alignment on the extreme boundary on either side of the project Highway at 50m interval.(lumpsum) - For entire project length of 112 Km |
67 | Land AcquisitionTeam includingsupportstaff : |
68 | 1. Ex-Land RevenueInspector/Officer or equivalent,- 1 Nos. 2. Ex-Kanoogo/Girdwar or equivalent, -1 Nos. 3. Ex-Patwari or equivalent - 1 Nos. 4. Typist - 1 Nos. 5. Peon - 1 Nos. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy