Consultancy Services For Preparation Of Detailed Project Report For Construction Of 4 Lane Bypass Starting From Its Junction With Gondia Tirora Road Nh 753 And Terminating At Its Junction With Balaghat - Gondia Road Nh 543 In Gondia District In The, gondia-Maharashtra

Ministry Of Road Transport And Highways has published Consultancy Services For Preparation Of Detailed Project Report For Construction Of 4 Lane Bypass Starting From Its Junction With Gondia Tirora Road Nh 753 And Terminating At Its Junction With Balaghat - Gondia Road Nh 543 In Gondia District In The. Submission Date for this Tender is 08-09-2022. Detail Project Report Tenders in gondia Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

33523269
Corrigendum : Consultancy Services For Preparation Of Detailed Project Report For Construction Of 4 Lane Bypass Starting From Its Junction With Gondia Tirora Road Nh 753 And Terminating At Its Junction With Balaghat - Gondia Road Nh 543 In Gondia District In The
Open Tender
Indian
Maharashtra
gondia
08-09-2022

Tender Details

Consultancy Services For Preparation Of Detailed Project Report For Construction Of 4 Lane Bypass Starting From Its Junction With Gondia Tirora Road Nh 753 And Terminating At Its Junction With Balaghat - Gondia Road Nh 543 In Gondia District In The

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 24-Aug-2022 Date Extension Date 08-09-2022

Key Value

Document Fees
INR 5000 /-
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for construction of 4 Lane Bypass starting from its junction with Gondia – Tirora Road NH 753 and terminating at its junction with Balaghat - Gondia Road NH 543in Gondia District in the state of Maharashtra.
Sl. No. Item Description
1Professional Staff :
2Team Leader cum Senior Highway Engineer
3Senior Bridge Engineer
4Highway cum Pavement Engineer
5Material-cum-Geotechnical Engineer- Geologist
6Senior Survey Engineer
7Traffic and Safety Expert
8Environmental Specialist
9Quantity Surveyor/ Documentation Expert
10Land Acquisition Expert
11Utility Expert
12Sub Professional Staff : 4 Nos. (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
13Support Staff :
14Office Manager
15Typist
16Office Boy
17Night Watchman
18Transportation (Fixed Cost): 2 Nos. Ofvehicles (SUV Type) hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
19For Conusltant: Mahindra Bolero or Equivalent (Not more than 2 years old)
20For Conusltant: Innova or Equivalent (Not more than 2 years old)
21Duty Travel to Site (Fixed Cost) :
22Office Rent (Fixed Cost) : Minimum area of office - 150 sq.m (The rent cost includes maintenance, cleaning, Electric Bill, Water Bills, repairs, etc.)
23Office Supplies, Utilities and Communication :
24Office Supplies Drafting
25Supplies Computer
26Running Costs
27Domestic & International Communication
28Office Furniture and Equipment (Rental) : (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include 4 executive tables, 5chairs, 5 visitor chairs, 3 steel almirahs, 4 computer furniture, 1 conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (4 No., Intel i5, 19’’ colour TFT,RAM-8 GB, SSD-512 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 10 Business, pre-loaded anti-virus etc.), 1 Brother laser printers with scanner (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (3 no., 1.5 Ton), Water Coolers (as required)etc.
29Reports and Document Printing (Fixed):
30Monthly Report (3 Per Month)
31Inception Report & QAP
32Environment and Social Impact Screening Report
33Draft Feasibility Report
34Final Feasibility Report
35Strip Plan with L.A. Reports
36Draft LA and Clearances Report
37Final Land ClearancesReport
38Draft Environmental Assessment report & RAP
39Final Environmental Assessment report & RAP
40Draft Detailed Design Report& Drawings etc. (& Draft EMP)
41Draft Bidding Documents(& Draft EMP)
42Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.(& Final EMP)
43Final Bidding Documents
44Draft3(a), 3(A) and 3(D) notification for land acquisition (3 copies each)
45LA & Clearances II Report
46Survey and Investigation (Fixed):
47A. Topographical Survey :
48Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer etc.
49Detailed topographic surveys using mobile/aerial LiDAR or better technology
50B. Topographical Survey :
51Road and Bridge Inventory
52FWDTest and Pavemen tEvaluation
53Roughness Survey
54Axle Load Survey
55Material Survey and Investigation
56Sub-grade Investigation
57Traffic Survey
58Socio-economic & Census Survey / Studies
59Land Acquisition Studies
60Any other investigations/surveys
61*Sub-Soil Investigation(Boring) a) Boring in all type of soils (other than hard rock): 900 mtr b) Boring in Hard Rock : 250 Mtr
62C. NetWork Survey and GPR :
63Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. (For entire project length)
64GPR Survey for detection of underground utilities.(For entire project length)
65Cost of supply and fixing Boundary Pillars :
66Procuring and fixing boundary pillars and its installation, complete in all respect asper IRC:25,1967: Wherever the proposed alignment follows the existing alignment,the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highwayand/or construction of New Bypasses, Consultant shall fix boundary pillars along theproposed alignment on the extreme boundary on either side of the project Highway at 50m interval.(lumpsum) - For entire project length of 112 Km
67Land AcquisitionTeam includingsupportstaff :
681. Ex-Land RevenueInspector/Officer or equivalent,- 1 Nos. 2. Ex-Kanoogo/Girdwar or equivalent, -1 Nos. 3. Ex-Patwari or equivalent - 1 Nos. 4. Typist - 1 Nos. 5. Peon - 1 Nos.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail