Public Works Department-PWD has published Improvement Of Roads In Doda Town By Way Of Construction Of Pucca R / Wall On Doda Dessa Link Road In Km 1St Rd ( 340-384 ) . As Per Nit / Sbd. Submission Date for this Tender is 19-08-2022. Road Work Tenders in doda Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : |
2 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
4 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
6 | Hand packed stone in horizontal on level including cost of stone. |
7 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. |
8 | Providing and fixing of 100 mm dia PVC pipe for weap holes. |
9 | Carriage of Material by MT |
10 | Carriage of stone avg. lead of 05 km by MT |
11 | Carriage of sand avg. lead of 22 km by MT |
12 | Carriage of Bajiri avg. lead of 10 km by MT |
13 | Carriage ofexcavated earth at an avg. lead of 02 km by MT |