Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Rate Contract For Execution Of Works For Agricultural Feeder Segregation Under Rds Scheme In Udumalpet Division North Udumalpet Sub Division. Submission Date for this Tender is 20-08-2022. Agriculture service Tenders in udumalpet Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | EXCAVATION OF POLE PITS / Stay Set: |
2 | For pole upto 8.00m length by using JCB/Manual |
3 | For pole above 8.00m length by using JCB/Manual |
4 | In Hard Soil (common to all size of poles) |
5 | In rocky area (common to all size of poles) by blasting / Manual |
6 | Excavation of Stay pit of 4.5 " to 5 "depth using JCB / Manual |
7 | Excavation of Stay pit in Hard rock soil |
8 | Excavation and back filling of Stay pit in Hard rock soil with out blasting |
9 | Excavation and back fillingof Stay pit inmedium rock and dense medium rock requires blasting |
10 | ERECTION OF POLES AND ACCESSORIES |
11 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
12 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
13 | Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles |
14 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
15 | Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. |
16 | Erection of stay set complete in the rock area by blasting |
17 | Fixing of Line Materials |
18 | V cross arm4.5 feet |
19 | Fixing of LT S phase cross arm |
20 | Fixing of LT 3 phase cross arm |
21 | Fixing of HT / LT Ti fitting |
22 | Fixing of HT PIN insulator with Pin 22 kv |
23 | Fixing of LT PIN insulator |
24 | Fixing of HT strain disc 11 KV |
25 | Fixing of HT strain disc 22 KV |
26 | Set right of all sizes of leaning poles |
27 | Fixing of shackle |
28 | Fixing of Aluminium knob |
29 | Fixing of HT LAS (3 Nos.) |
30 | Fixing of LT LAS (3 Nos.) |
31 | Fixing of Double channal X arm |
32 | Fixing of Tapping channal X arm |
33 | Fixing of Guarding channal X arm |
34 | LT open type fuse unit |
35 | DismandlingV cross arm4.5 feet |
36 | Dismandling of LT S phase cross arm |
37 | Dismandlingof LT 3 phase cross arm |
38 | Dismandling of HT / LT Ti fitting |
39 | Dismandling of HT PIN insulator with Pin 22 kv |
40 | Dismandlingof LT PIN insulator |
41 | Dismandling of HT strain disc 11 KV |
42 | Dismandling of HT strain disc 22 KV |
43 | Dismandlingof shackle |
44 | Dismandling of Aluminium knob |
45 | Dismandlingof HT LAS (3 Nos.) |
46 | Dismandlingof LT LAS (3 Nos.) |
47 | Dismandling of Double channal X arm |
48 | Dismandlingof Tapping channal X arm |
49 | Dismandling of Guarding channal X arm |
50 | DismandlingLT open type fuse unit |
51 | Dismandlingof Top Channel |
52 | Dismandlingof Belting Channel |
53 | Dismandlingof Bed Channel |
54 | Dismandlingof Metering set |
55 | Dismandlingof DT below 200KVA |
56 | Dismandlingof Dt above 200KVA below 500KVA |
57 | Dismandlingof Dt500KVA |
58 | Destruction of pole concreting at site |
59 | Retrieving grill from Deteriorated RCC pole |
60 | STRINGING OF CONDUCTORS: |
61 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
62 | Paving and stringing of conductors ofabove7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor |
63 | Paving and stringing of conductors of one run of PVC cable line of all sizes with GI wire and reel insulator. |
64 | Paving and stringing of conductors of7/4.09mm ACSR or other equivalent conductor |
65 | Paving and stringing of conductors of7/4.72 mm Dog Conductor or other equivalent conductor |
66 | Releasing and reerection (resagging) of one run of all sizes of conductor |
67 | Dismantling of conductor ofupto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
68 | Dismantling of conductor ofabove 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
69 | ERECTION OF DISTRIBUTION TRANSFORMERS: |
70 | Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II) |
71 | Erection of single pole Transformer structure completeas per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer |
72 | Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. |
73 | (i) Upto 25 KVA Distribution transformer / Metering set. |
74 | (ii) Above 25 KVA to 100 KVA |
75 | (iii) Above 100 KVA to 250 KVA |
76 | (iv) 500 KVA and above |
77 | ERECTION OF DP STRUCTURE: |
78 | Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., (Data as per Annexure I) (i) With 22 / 33 KV AB switch using all types of poles of size 9.14 m and above length |
79 | Erection of single pole DP with completeand with single earth |
80 | CONCRETING WORKS: |
81 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) |
82 | (i) Mass concreting of poles |
83 | (ii) Sleeveconcreting |
84 | (iii) Stay concreting |
85 | EARTHING: |
86 | (i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
87 | (ii) Provision of spike including earthing arrangement |
88 | (iii) Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length |
89 | (iv) Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination |
90 | (v) Replacement of corroded earth pipe |
91 | LOADING AND UNLOADING CHARGES: |
92 | Loading or unloading of Distribution Transformer |
93 | (i) Upto 100 KVA |
94 | (ii) Above 100 KVA and upto 500 KVA |
95 | (iii) Metering set of all ratios |
96 | Loading or unloading of various sizes of poles |
97 | (i) REC, RCC, PSC pole upto 8.00 m length |
98 | (ii) All REC, RCC pole above 8.00 m length |
99 | (iii) Metal poles all sizes |
100 | Loading of Conductor |
101 | Unloading of Conductor |
102 | Loading / Unloading of Iron & Steel |
103 | Loading / Unloading of line materials |
104 | Guarding Arrangement |
105 | Provision of guarding with two numbers earth pits excluding stay set erection |
106 | (i) Flat guarding with earth pit |
107 | (ii) Split neutral |
108 | TRANSPORTATION CHARGES: |
109 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
110 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) |
111 | (i) For a lead upto 5 KM |
112 | (ii) Above 5 KM of lead of every KM |
113 | Transport of Metal pole of all sizes by head loads in hill areas from road side to pole pit location |
114 | (i) Upto 1 KM |
115 | (ii) Above 1 KM per each KM |
116 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
117 | (i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
118 | (ii) Above 10 KM |
119 | PAINTING: |
120 | Numbering of poles including base painting and with cost of paint |
121 | Painting of iron poles up to 36 ft length with double coats including cost of paint |
122 | Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint |
123 | Painting of Cement poles by Distember coating including cost of distember |
124 | Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department) |
125 | WORKSHOP CHARGES: |
126 | Manufacturing / Altering of Clamps |
127 | Drilling of holes in the structure materials clamps etc., |
128 | AB switch or open type side arm stud, cutting and drilling holes |
129 | Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe |
130 | GENERAL: |
131 | Jungle clearance such as kattu karuvai in the various area without uprooting |
132 | Jungle clearance such as kattu karuvai in the various area with uprooting |
133 | Clearing of tree braches of coconut trees |
134 | Clearing of tree braches of Neem, Tamarin, Country etc |
135 | Leveling of Ground using Bul Dozer |
136 | Clearing of Branches / Trees with JCB |
137 | Fencing of Distribution Transformer Structure at Road side- Fabrication and Erection.(including all materials) |
138 | 33KVTermination Kits (HS Type) |
139 | Road cutting charges |
140 | 33KV Straight joints kits (HS Type) |
141 | watch and ward Cable |
142 | Supply and erection of cable marker |
143 | Uncoiling & laying of 33KV cable |
144 | cutting the cable |
145 | Refilling with excavated earth |
146 | Crusher dust provision |
147 | Earth work excavation |
148 | 33KV V Trough |
149 | Labour for bay Extension |
150 | Painting one coat of Red oxide paint (with out paint) |
151 | Painting two coat of Aluminiumpaint over coat of primer paint (with out paint) |