Animal Resources Development Department has published Construction Of Feed Godown And Allied Civil Works At Broiler Integration Office Phansidewa During The Year 2022-202 . Submission Date for this Tender is 20-08-2022. Godown Tenders in phansidewa West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Labour for Chipping of concrete surface before taking up Plastering work. |
2 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) |
3 | Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor |
4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes |
5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes |
6 | Reinforcement for reinforced concrete work in all sorts of structuresincluding distribution bars, stirrups, binders etc initial straightening andremoval of loose rust (ifnecessary), cutting to requisite length, hooking andbending to correct shape, placing in proper position and binding with 16gauge blackannealed wire at every ntersection, complete as per drawingand direction. SAIL/TATA/RINL |
7 | Hire and labour charges for shuttering with centering and necessary stagingupto 4 m using approved stout props and thick hard wood planks of approvedthicknesswith required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roofof ground floor) . 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:4 cement mortar (b) 20 mm thick plaster |
9 | (c) 15 mm thick plaster |
10 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. |
11 | (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
12 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white) |
13 | Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work). In Roof:- With 0.5 mm thick sheet |
14 | Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc complete.(225mm end lapping) (B) 450 mm lapping each way (c) With 0.80 mm sheet |
15 | M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. b) Span beyond 12 Mtr and up to 20.00 Mtr |
16 | Holding down bolt with nut including 100 x 100 x 6 mm plate washer at bottom fitted complete and packing the hole with cement concrete or cement grout as directed. |
17 | Sanitary & Plumbing work |
18 | ADD 18% GST FROM IT NO 1.01 TO 1.17 ( i.e. on total amount of Rs. 2483349.54) |
19 | Add 1% cess (i.e. on total amount of Rs. 2930352.46) |